Tender Value
₹34.5 L
EMD Value
₹35,000
Closing Date
23 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer Nadiad Irrigation Division Nadiad
Constructing of Transition walls on Raniya Distributary at various chainage and Canal syphon at Ch.8000 ft on Raniya Distributary
353813
Tender Notice No. 08 of 2026-2027
Open
Civil - All
Works
Kheda
13 documents required · 12 mandatory · 1 optional
₹1,500
Executive Engineer Nadiad Irrigation Division Nadiad
₹35,000
9 Oct 2026
9 Oct 2026
9 Oct 2026
23 Oct 2026
9 Oct 2026
BILL OF QUANTITIES
Name of Work :-Constructing of Transition walls on Raniya Distributary at various
chainage and Canal syphon at Ch.8000 ft on Raniya Distributary
Item No. Item of work Unit Qty Rate (Rs.) Amount (Rs.)
Clearing the shrubs, like akadas, weeds and
other vegetables inclu. depositing the same
outside and burning etc. complete from
canal beds and both slopes of the banks, for
canal with discharge. For Canals Below
Dismantling the C.C. lining including
including disposing off the dismentalled
materials as directed etc. complete.(a)
Excavation for foundation in all sorts of soil
including yellow sandy gravelly soils ,soft &
hard murrum etc. in dry condition including
depositing the excavated stuff in uniform
layers in banks or as and where directed
etc. complete for lead upto 500 m and all
lift. (BY MACHINERY) Excluding dewatering.
Providing & Laying in position "NOMINAL
MIX" cement concrete using cement, sand
and crushed aggregate by mass and
machine mix for C.C./R.C.C work incl.
necessary formworks centering, scaffolding,
compaction by vibrator, curing as directed
with all lead & lift etc complete Without
Dewatering and excluding cost of steel
reinforcement. (A) For Foundation concrete
/ General purpose (b) C. C. Nominal Mix, M-
15 and MSA-20 mm
Providing & Placing in position
reinforcement bars including cutting,
5 bending, welding joints where necessary, MT 4.710 82019.00
hooking etc. complete as per drawing for all
lead and lifts. TMT / CRS (FE 500 D)
Back filling the foundation trenches around
the structures etc with selected excavated
6 stuff including watering, ramming, CM 385.000 36.90
compacting etc. complete. (By Machinery)
BILL OF QUANTITIES
Name of Work :-Constructing of Transition walls on Raniya Distributary at various
chainage and Canal syphon at Ch.8000 ft on Raniya Distributary
Item No. Item of work Unit Qty Rate (Rs.) Amount (Rs.)
Providing and laying plain / reinforced
cement concrete lining of Nominal Mix, M-
15, (MSA-20 mm) in bed, side slopes and
curvature, including mixing, transporting,
placing, vibrating, smooth finishing, curing,
including dewatering where required.
(MANUALLY WITH CONVENTIONAL MIXER
)(A) 7.5 cm thick lining in bed/slope - with
Dismantling the existing brick masonry
including sorting out and stacking the useful
8 material and removing the debries and CM 26.90 750.90
making good the damages etc. complete as
directed. In Cement Mortar
Dismantling the existing R.C.C. Pipes incl.
sorting out and stacking of the useful
materials of the following diameters
including refilling the trenches etc.
complete as directed. (i) NP-2 pipes (pipe
Dismantling the existing foundation
concrete including sorting out the
dismentalled stuff and stacking the useful
material and removing the debries and
making good the damages etc. complete as
BILL OF QUANTITIES
Name of Work :-Constructing of Transition walls on Raniya Distributary at various
chainage and Canal syphon at Ch.8000 ft on Raniya Distributary
Item No. Item of work Unit Qty Rate (Rs.) Amount (Rs.)
Providing and fixing in position ( different
diameter ) NP2 R.C.C. pipe with collar
including filling and caulking the joints with
11 cement mortar 1:1 proportion, finishing to RMT 2.50 3091.10
design grade and level curing etc. complete
for all leads and lifts. NP-2 class 1200 mm
Earth work in embankment using selected
soil, soft & hard murrum excavated from
approved borrow area / village tanks etc.
Including conveying, spreading in uniform
12 layers, breaking clods and dressing to the CM 61.50 110.80
designed canal section etc. with lead upto
500m and all lifts
(for canals having capacity up to 300 Cusec)
( By Machinery )(By Machinery)
New / Repairing of steel gate including
providing basic steel material; M.S. Shaft
13 plate, angles, channels etc. incl. fabrication KG 187.00 127.20
transporting to site & erection and painting
Providing and fixing the iron rod for steel
gates including providing big size thread and
finishing as required etc comp.(a) dia of bar
Providing and fixing heavy duty CI nut for
steel gates as directed etc comp(a)- for
mm dia rod and height of nut is 120 x 120 x
BILL OF QUANTITIES
Name of Work :-Constructing of Transition walls on Raniya Distributary at various
chainage and Canal syphon at Ch.8000 ft on Raniya Distributary
Item No. Item of work Unit Qty Rate (Rs.) Amount (Rs.)
Providing and fixing heavy duty thrust
bearing for following dia as directed etc
compa- for 38 mm dia and 50 mm dia bar
and ID/OD 65mm to 95 mm
Rs. Thirty Four Lac Fifty Three Thousand Eight Hundred Forty Seven & Seventy Two Paise Only
I/We am/are willing to carry out the work at……………………………. % above/ below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my/our
Estimated amount tender works out as under.Estimated amount
Deduct :- ____ % Below Rs. _______________ Add ____ % above Rs.
Net Tender amount Rs. ______________ Net Tender amount
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R. NO.: MIC102010/17/K1 Dated: 30/07/2018 as stated in S.O.R. therefore in R.C.C. items
where there is a change as per actual mix design the cost of difference of cement consumption
Deputy Executive Engineer
Thasra Irrigation Sub Division
Signature of contractor. Thasra
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Front Page.pdf
2 Notice Inviting online Tender.pdf
3 - SBD Book - R1.pdf
4 BOQ.pdf
5 Cement.pdf
6 Steel.pdf
7 PA.pdf
8 Other Specifications.pdf
9 .Itemwise Spec.pdf
10 Test Schedule.pdf
Tender Notice No. 08 of 2026-2027.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .