Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LQualified A4 7 GANESHKUNJ SOCIETY NEAR DHARNIDHAR DERASAR ROAD DHARNIDHAR AHMEDABAD GUJARAT 380007 | AHMADABAD | GUJARAT | 380007 | L1 | Qualified | |
| 2 | L2₹1.3 L+₹198 (0.15%)Qualified AHMEDABAD CITY | L2 | Qualified | |
| 3 | L3₹1.3 L+₹332 (0.25%)Qualified AHMEDABAD GUJARAT 380003 INDIA | AHMADABAD | GUJARAT | 380003 | L3 | Qualified | |
| 4 | Disqualified SHOP NO 16 CITYGEM BUILDING PLOT NO E147 SECTOR 12 KENDRIYA VIHAR ROAD KHARGHAR RAIGAD MAHARASHTRA 410210 | RAIGAD | MAHARASHTRA | 410210 | - | Disqualified | |
| 5 | Disqualified RZ R 150 CHANAKYA PLACE PART 2 UTTAM NAGAR WEST DELHI D K MOHAN GARDEN WEST DELHI DELHI 110059 | WEST DELHI | DELHI | 110059 | - | Disqualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
6 Oct 2025, 5:00 pmClosed
Split Air Conditioner Including Green AC
Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6723507 Dated : 25-09-2025 Bid Document 1/6
-- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
8396704
GEM/2025/B/6723507
Two Packet Bid
Split Air Conditioner Including Green AC
15 days
Kushal Udaybhai382110Sanand Nagarpalika, Tapal Chawk, Near Swaminarayan Temple
Total value wise evaluation
PRODUCT
8 documents required · 8 mandatory
Exempted
25 Sept 2025
25 Sept 2025
6 Oct 2025
Split Air Conditioner Including Green AC
Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6723507 Dated : 25-09-2025 Bid Document 1/6
-- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8396704.pdf
GEM_BID
green_room_air_conditioner_specifications_-draft-_d_2024-05-01-11-50-44_6dc927f8627fd0e694ecf3e91a001743.pdf
SPECIFICATION
stc_-version_2-_split_air_conditioner_including_gre_2024-06-26-16-57-37_efdc88d6a009d5c093d94097cf97cbc4.pdf
OTHER
requirements_for_oem_status_against_the_category_-__2024-05-01-12-38-10_42eb1899ef2d07820095ebe48910a901.pdf
OTHER
OM_energy_ElecAppl.pdf
OTHER
tremsS_7fbb8370-7c16-42a1-87d81758712942476_SISANAND.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .