| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-Finance | ₹3.9 Cr | L1 | Accepted-Finance L1 bidder |
| Sl No | Description | Qty | Unit | Knospe and Co LLP L1 |
|---|---|---|---|---|
| 1.00 | A. Civil Works
1. Dismantling and Demolishing
Demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-charge:-
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 5 | CUM | 2,000 ₹10,000 Lowest |
| 2.00 | Demolishing brick work including stacking of serviceable material sand disposal of unserviceable materials with all lifts and upto a lead of 50metc. complete as per direction of the Engineer- in-charge
In cement mortar. | 9 | CUM | 1,500 ₹13,500 Lowest |
| 3.00 | Removing mortar from brick and cleaning bricks including stacking bricks and disposal rubbishwith all lifts and upto a lead of 50 m etc.complete as per direction of the Engineer- in-charge
In cement mortar. | 5 | CUM | 200 ₹1,000 Lowest |
| 4.00 | Takingout doors,windowsandclerestorywindow shutters(steelorwood) including stacking with in 50 metres lead :
Of area 3 sqm and below. | 2 | Each | 1,200 ₹2,400 Lowest |
| 5.00 | Of area beyond 3 sqm. | 1 | Each | 1,000 ₹1,000 Lowest |
| 6.00 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.
For thickness of tiles 10 mm to 25 mm | 18 | Sqm | 200 ₹3,600 Lowest |
| 7.00 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | 18 | Sqm | 500 ₹9,000 Lowest |
| 8.00 | Dismantling old plaster or pointing, raking out joints, cleaning and preparing the surface for re-plastering or re-pointing including disposal of rubbish to the dumping ground with all leads and lifts etc.complete as per direction of the Engineer- in-charge. | 200 | Sqm | 200 ₹40,000 Lowest |
| 9.00 | 2. Repairs to Building
SCAFFOLDING WORK
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin-charge .The elevational area of the scaffolding shall be measured for payment purpose.The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. | 100 | Sqm | 280 ₹28,000 Lowest |
| 10.00 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
Interior Walls | 350 | Sqm | 100 ₹35,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.9 L
Closing Date
25 Mar 2026, 3:00 pmClosed
APD cum Managing Director, TTDCL, Agartala
Tripura Tourism Development Corporation Ltd., Swetmahal, Agartala
Development of a Digital Museum in Neermahal Palace Building
2026_ADBTT_71713_1
172/MD/TTDCL/DMN /25-26
Open Tender
Civil Works - Others
Item Rate
365 days
Neermahal, Melaghar
As mentioned in tender document.
3 documents required · 3 mandatory
₹9,940
₹3.9 L
20 May 2026
18 Mar 2026
25 Mar 2026
18 Mar 2026
25 Mar 2026
18 Mar 2026
18 Mar 2026 - 20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A. Civil Works
1. Dismantling and Demolishing
Demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-charge:-
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 5 | CUM | - | - |
| 2 | Demolishing brick work including stacking of serviceable material sand disposal of unserviceable materials with all lifts and upto a lead of 50metc. complete as per direction of the Engineer- in-charge
In cement mortar. | 9 | CUM | - | - |
| 3 | Removing mortar from brick and cleaning bricks including stacking bricks and disposal rubbishwith all lifts and upto a lead of 50 m etc.complete as per direction of the Engineer- in-charge
In cement mortar. | 5 | CUM | - | - |
| 4 | Takingout doors,windowsandclerestorywindow shutters(steelorwood) including stacking with in 50 metres lead :
Of area 3 sqm and below. | 2 | Each | - | - |
| 5 | Of area beyond 3 sqm. | 1 | Each | - | - |
| 6 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.
For thickness of tiles 10 mm to 25 mm | 18 | Sqm | - | - |
| 7 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | 18 | Sqm | - | - |
| 8 | Dismantling old plaster or pointing, raking out joints, cleaning and preparing the surface for re-plastering or re-pointing including disposal of rubbish to the dumping ground with all leads and lifts etc.complete as per direction of the Engineer- in-charge. | 200 | Sqm | - | - |
| 9 | 2. Repairs to Building
SCAFFOLDING WORK
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin-charge .The elevational area of the scaffolding shall be measured for payment purpose.The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. | 100 | Sqm | - | - |
| 10 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
Interior Walls | 350 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_72983.xls
BOQ • 0.47 MB
DNIT.pdf
Tender Documents • 1.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].