Tender Value
₹30.7 L
EMD Value
₹61,500
Closing Date
9 Jul 2026, 3:00 pm5d left
Executive Engineer PWD RNB DH PORA
Executive Engineer PWD RNB DH PORA
Construction of ACR at MS Kounsarbal D.H.Pora
2026_PWDJK_313611_2
21 Of RnB/D.H. Pora/2026-27/1624-32 Dtd. 25/06/2026
Open Tender
Civil Works
360 days
Executive Engineer PWD RNB DH PORA
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,100
Acc no 0470010200000099
₹61,500
25 Jun 2026
25 Jun 2026
10 Jul 2026
26 Jun 2026
9 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of all kinds of soil by mechanical means in trenches for foundations (not exceeding 1.5 m in width) and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms, all lifts including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 1 | Cum | 0.6 | ₹0.6 |
| 2 | Providing and laying stone soling duly hand packed in maintaning level and section including ramming and carriage of the same up to site of work complete. | 1 | Cum | 0.8 | ₹0.8 |
| 3 | Filling available excavated earth in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1 | Cum | 1 | ₹1 |
| 4 | Providing and laying in position cement concrete 1:4:8 (1
Cement:4 Corase sand: 8 graded stone aggregate 40 mm
nominal size ) including curing but excluding the
cost of centring and shuttering. All work upto plinth level | 1 | Cum | 0.4 | ₹0.4 |
| 5 | Providing and laying in position cement concrete 1:2:4 (1
Cement:2 Corase sand: 4 graded stone aggregate 20 mm
nominal size ) including curing but excluding the
cost of centring and shuttering. All work upto plinth level | - | Cum | 0.8 | - |
| 6 | Providing and laying in position reinforced cement concrete 1:1.5:3 (1 Cement:1.5 Corase sand: 3 grade stone aggregate 20 mm nominal size) including curing but excluding the
cost of centring, shuttering,finishing and reinforcement. All work upto plinth level | - | Cum | 0.8 | - |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 0.2 | ₹0.2 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | 0.2 | - |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | - | Cum | 0.4 | - |
| 10 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | - | Cum | 0.8 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1015235.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid