Executive Engineer, Water Works Project Department, Vadodara Municipal Corporation
Construction Work of Compound wall at SAMA punam nagar tank. (2nd Attempt)
314447
174/2026-27
Open
Civil Works - Water Works
Vadodara
3 documents required · 3 mandatory
₹6,000
MUNICIPAL COMMISSIONER ,VADODARA MUNICIPAL CORPORATION
₹1.2 L
15 Jun 2026
15 Jun 2026
15 Jun 2026
6 Jul 2026
15 Jun 2026
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and
verified by the Engineer and valued at the rates and prices tendered in the priced
Bill of Quantities, where applicable, and otherwise at such rates and prices as the
Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied in
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for
the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant sections
of the contract documentation shall be made before entering rates or prices
against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to Clause
29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed
air drilling for its removal, and which cannot be extracted by ripping with a tractor of
at least 150 kw with a single rear mounted heavy duty ripper.
1 The Contractor shall exhibit a board with detailed specification and details
of work as directed by the Engineer-In-Charge for which no extra payment
2 The labour cess will be deducted from the bill amount excluding GST as per
prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of
Name of work: Construction Work of Compound wall at SAMA Punamnagar tank.
BILL OF QUANTITIES
Sr.No. Description of Items Qty. Unit Rate Amount in Rs.
Excavation for foundation upto 1.5m depth including sorting out and
1 stacking of useful materials and disposing of the excavated stuff upto
meter road.Loose or soft soil 600.00 Cu. M. 206.86
Excavation for foundation from 1.5m to 3.0m depth including sorting out
2 and stacking of useful materials and disposing of the excavated stuff upto
50 meter road.Loose or soft soil 330.00 Cu. M. 228.29
Providing and Laying Cement Concrete 1:3:6 (1-Cement, 3-Coarse Sand, 6-
3 hand Broken stone aggregates 40 mm nominal size) and curing complete
excluding cost of formwork. 63.00 Cu. M. 3050.40
Providing and casting in situ controlled cement concrete M-200 for R.C.C.
return as per drawings including centering shuttering, scaffolding where
necessary, laying vibrating, curing and finishing complete.(A) Height from
Providing TMT Bar FE 415 reinforcement for R.C.C. work including bending,
binding and placing in position complete upto floor two level 17590.00 Kg. 67.65
Brickwork using common burnt clay building bricks having crushing
strength not less than 35 kg/sq.cm in cement mortar 1:6 ( 1 cement, 6 fine
sand) (b) -do- -do- for brick work in super structure above plinth level up to
floor two level 235.00 Sq. m. 4359.80
Providing 15 mm thick cement plaster in single coat on fair side of
brick/concrete walls for interior plastering up to floor two level and
finished even and smooth in cement mortar (1:3) proportion (1 cement :
3sand) including finishing with floating coat of neat cement slurry. 1300.00 Sq. m. 239.42
20 mm thick sand faced cement plaster on walls up to ht. 10mt. above
8 ground level consisting of 12 mm thick backing coat of 1:3 ( 1 cement :3
sand) and 8 mm thick finishing coat of C.M. 1:1 (1 cement : 1sand) etc. 1200.00 Sq. m. 334.18
Providing and fixing 5 nos of barbed wire fencing 600 High with long M.S.
9 Angle posts 40mm x 40 mm x6 mm With Five holes and oil painting
coats fixed at 3.0 Mt,C/c. For Compound Wall 400.00 Rmt 2949.00
Finishing wall with weather proof exterior emulsion paint on wall surface
(two coats) to give an required shape even shade after thoroughly brushing
the surface to remove all dirt, and remains of loose powdered materials.etc
complete 3100.00 Sq. m. 116.24
Demolition including stacking of serviceble materials and disposal of
unserviceble materials with all lead & lift [i] Brick work. 50.00 Cu. M. 558.57
Demolition including stacking of serviceble materials and disposal of
unserviceble materials with all lead & lift [i] R.C.C. work 50.00 Cu. M. 1073.56
Filling available excavated earth (excluding rock) in trenches, plinth, sides
13 of foundations etc. in layers not exceeding 20cm. In depth consolidating
each deposited layer by ramming and watering. 735.38 Cu. M. 132.33
I/We am/are willing to carry out the work at… ..................... % above/below percent(Should be
written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.0 SBD- Punam Nagar.pdf
2.0 General Specifications-Punam Nagar.pdf
3.0 Price Bid_Punam Nagar (1).pdf
Download all tender documents and submit your bid