Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 944 A ARYANAGAR KASHIPUR DISTRICT UDHAM SINGH NAGAR UTTARAKHAND | KASHIPUR | UDHAM SINGH NAGAR | UTTARAKHAND | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance KANOURI BAJPUR DISTRICT UDHAM SINGH NAGAR | NAINITAL | UTTARAKHAND | 244715 | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹2.6 L
Closing Date
21 Apr 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE 4th Circle PWD Rudrapur
Office of SE 4th Circle PWD Rudrapur
As per BOQ
2022_pwd_43176_1
921/23M-04/2022 Dt 12-4-22
Open Tender
Civil Works
Item Rate
180 days
Bazpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
EE CD PWD Kashipur
₹2.6 L
21 Apr 2022
13 Apr 2022
21 Apr 2022
13 Apr 2022
21 Apr 2022
13 Apr 2022
90 days
Amount
x.ks'kiqj jkeuxj ekxZ ds fdeh0 1 ls 4
Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
Tack coat using VG-10 grade bitumen @0.35kg/sqm,over normal bituminous surfaces. As per Technical Specification.
Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Density 2.20) (Bitumen mecadam Grading II using VG-30 @ 3.40% of the weight of total for grading II 19mm nominal size ( Rates shall be based on bitumin content 3.40% of total mix by weight and density of finished B.M. as 2.20ton/cum which shall be adjusted up/down as per job mix formula using rate of bitumin @ 42674.33 per MT and agreate @ Rs. 1442.83 per cum inclusive of cartage).
Providing and laying Semi Dense Bituminous Concrete with 60-90 TPH batch type HMP producing anaverage output of 75 tonnes per hour using crushed aggregate sofspecified grading, premixed with bituminous binder @5% of mixandfiller, transporting the hotmix to work site, laying with a hydrostatic paver finis her with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clauseNo.508 complete in all respects Grading II - 10 mm using Bitumen VG - 30. ( Rates shall be based on bitumin content 5.00% of total mix by weight and density of finished SDBC as 2.31ton/cum which shall be adjusted up/down as per job mix formula using rate of bitumin @ 42674.33 / MT and agreate @ Rs.1442.83 per cum inclusive of cartage).
cjgSuh gfjiqjk gjlku egksyk egksyh ekxZ ds fdeh0 5 ls 8
Tack coat using VG-10 grade bitumen Over normal bituminous surfaces @0.35kg/sqm, as per technical specification.
Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Density 2.20) (Bitumen mecadam Grading II using VG-30 @ 3.40% of the weight of total for grading II 19mm nominal size ( Rates shall be based on bitumin content 3.40% of total mix by weight and density of finished B.M. as 2.20ton/cum which shall be adjusted up/down as per job mix formula using rate of bitumin @ 42674.33 per MT and agreate @ Rs. 1442.83 per cum inclusive of cartage).
Providing and laying Semi Dense Bituminous Concrete with 60-90 TPH batch type HMP producing anaverage output of 75 tonnes per hour using crushed aggregate sofspecified grading, premixed with bituminous binder @5% of mixandfiller, transporting the hotmix to work site, laying with a hydrostatic paver finis her with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clauseNo.508 complete in all respects Grading II - 10 mm using Bitumen VG - 30. ( Rates shall be based on bitumin content 5.00% of total mix by weight and density of finished SDBC as 2.31ton/cum which shall be adjusted up/down as per job mix formula using rate of bitumin @ 42674.33 / MT and agreate @ Rs.1442.83 per cum inclusive of cartage).
Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903.
M/s Mahalaxmi Construction
stage.html
html • 0.02 MB
finance_51326.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .