| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAccepted-AOC | ₹19.0 L | L1 | Accepted-AOC L1Bidder |
| 2 | L2₹19.0 LRejected-Finance | ₹19.0 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | M/s. Bitcon L1 | Shri Uday Bhiva Gawandi L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All kinds of soil | 639.5 | Cum | 214.5 ₹1,37,172.75 Lowest | 214.51 ₹1,37,179.15 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 26 | Cum | 1,658.25 ₹43,114.5 Lowest | 1,659.26 ₹43,140.76 |
| 3.00 | Centering & shuttering including Strutting, Propping & removal of forms for : Foundations, Footings, Bases for columns | 442 | Sq.m | 326 ₹1,44,092 | 305.25 ₹1,34,920.5 Lowest |
| 4.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto Plinth Level. | 210 | Cum | 5,528.14 ₹11,60,909.4 Lowest | 5,585.89 ₹11,73,036.9 |
| 5.00 | Centering & shuttering including Strutting, Propping & removal of forms for : Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like | 10 | Sq.m | 359.61 ₹3,596.1 Lowest | 361.24 ₹3,612.4 |
| 6.00 | Centering & shuttering including Strutting, Propping & removal of forms for : Suspended floor, roofs landings, shelves & their supports | 8 | Sq.m | 483 ₹3,864 | 482.01 ₹3,856.08 Lowest |
| 7.00 | Providing and laying in position (1:11/2:3) Refinforced cement conrete excluding the cost of centering shuttering finishing and reinfrocement (1 cement 11/2 coarse sand :3 graded stone agg 20mm nominal size) c) in beams, suspended floors, roofs having slope upto 15°landings, balconies , shelves, chajjas lintels bands plain window sills staircases upto floor five level. | 3 | Cum | 6,489.24 ₹19,467.72 | 6,142.5 ₹18,427.5 Lowest |
| 8.00 | Providing TMT steel reinforcement bars of (SAIL, TATA VIZAG JSW steel Ltd) (confiorming to IS 786 of 1986 for RCC work conforming to I.S 1786 of 1986) including bending binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member | 270 | Kg | 86 ₹23,220 | 78.76 ₹21,265.2 Lowest |
| 9.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge : 75mm dia | 58 | RM | 138.75 ₹8,047.5 Lowest | 138.75 ₹8,047.5 Lowest |
| 10.00 | 12mm cement plaster 1:4 (1 cement : 4 fine sand) | 15 | Sq.m | 167.2 ₹2,508 Lowest | 167.27 ₹2,509.05 |
Tender Value
₹23.8 L
EMD Value
₹47,530
Closing Date
28 Jul 2025, 5:00 pmClosed
EE I WRD Porvorim
EE I WRD Porvorim
Improvement to the nallah from Shri Sarvesh Karpe house to Smt. Kalpana K. Tuenkar house at Salmona V.P. Saligao in Saligao Constituency.
2025_WRD_23755_1
6-9/WDI/WRD/ASW/2025-26/e-11/2
Open Tender
Miscellaneous Works
Item Rate
90 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹47,530
25 May 2026
7 Jul 2025
29 Jul 2025
7 Jul 2025
28 Jul 2025
7 Jul 2025
Amount
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All kinds of soil
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering & shuttering including Strutting, Propping & removal of forms for : Foundations, Footings, Bases for columns
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto Plinth Level.
Centering & shuttering including Strutting, Propping & removal of forms for : Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like
Centering & shuttering including Strutting, Propping & removal of forms for : Suspended floor, roofs landings, shelves & their supports
Providing and laying in position (1:11/2:3) Refinforced cement conrete excluding the cost of centering shuttering finishing and reinfrocement (1 cement 11/2 coarse sand :3 graded stone agg 20mm nominal size) c) in beams, suspended floors, roofs having slope upto 15°landings, balconies , shelves, chajjas lintels bands plain window sills staircases upto floor five level.
Providing TMT steel reinforcement bars of (SAIL, TATA VIZAG JSW steel Ltd) (confiorming to IS 786 of 1986 for RCC work conforming to I.S 1786 of 1986) including bending binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge : 75mm dia
12mm cement plaster 1:4 (1 cement : 4 fine sand)
6mm cement plaster to ceiling 1: 3 (1 cement : 3 fine sand)
Earthwork in embankment with approved earth (Contractor's earth)/moorum including spreading the earth in layers not exceeding 250mm in depth, breaking clods, watering rolling each layer with half tonne rolles or wooden or steel hammer including filling up ground depression, dressing etc. complete with all lead and lift and as directed by Engineer- in- Charge.
Shri Uday Bhiva Gawandi (BID ID -51184)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].