| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.6 LAccepted-AOC VILLAGE VILLAGE TEHSIL BAIJNATH DISTRICT KANGRA | MANDI | HIMACHAL PRADESH | 175013 | ₹19.6 L | L1 | Accepted-AOC Award |
| 2 | L2₹25.0 LRejected-Finance | ₹25.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹27.0 LRejected-Finance V P O SEHAL TEHSIL BAIJNATH DISTT KANGRA H P | MANDI | HIMACHAL PRADESH | 175013 | ₹27.0 L | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | AMIT CHOUDHARY L1 | GALAXY ASSOCIATE L2 | SUNNY KAPOOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Demolation of existing damaged and dilapidated sedimentation tank comprising RCC and masonry structures, including breaking, removal of reinforcement, disposal of debris, stacking of reusable materials and clearing the site . complete in all respect as per the direction and to the entire satisfaction of Engineer in charge with in all leads and lifts. | 1 | Job | 95,000 ₹95,000 Lowest | 2,00,000 ₹2,00,000 | 2,50,000 ₹2,50,000 |
| 2.00 | Excavation in in earth work and disposal of excavated earth upto a lead of 20 metres and lift upto 1.50 metres disposed earth to be levelled and neatly dressed in pick & jumper work Complete in all respect as per direction of Engineer in charge with in all leads and lifts. | 162.3 | Cum | 300 ₹48,690 Lowest | 510 ₹82,773 | 550 ₹89,265 |
| 3.00 | Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in Foundation and Plinth Complete in all respect as per direction of Engineer in Charge with in all Leads & Lifts. | 27.95 | Cum | 6,800 ₹1,90,060 Lowest | 9,200 ₹2,57,140 | 9,500 ₹2,65,525 |
| 4.00Providing and laying cement concrete work 1:1½:3 (1 cement: 1½ sand: 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in : | ||||||
| 4.10 | Foundation footing based of columns and the like and mass concrete . complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 20.71 | Cum | 8,100 ₹1,67,751 Lowest | 9,600 ₹1,98,816 | 10,200 ₹2,11,242 |
| 4.20 | Walls (any thickness but not less than 0.10 metre thickness) including attached pilasters buttersses, plinth and string courses etc. from top of foundation upto floor two level as per direction and to the entire satisfaction of Engineer-in-Charge | 66.41 | Cum | 8,100 ₹5,37,921 Lowest | 10,000 ₹6,64,100 | 10,800 ₹7,17,228 |
| 4.30 | Suspended floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and cantilever upto floor two level complete in all respect as per direction of Engineer-in-Charge with in all leads and lifts. | 3.19 | cum | 8,200 ₹26,158 Lowest | 10,500 ₹33,495 | 11,000 ₹35,090 |
| 5.00Providing form work with steel plated 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for insitu-reinforced concrete and plain. | ||||||
| 5.10 | Flat surfaces such as soffits of suspended floors, roofs, landings and the like. Floor etc.upto 200 mm in thickness complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge with in all leads and lifts. | 18.25 | Sqm | 390 ₹7,117.5 Lowest | 460 ₹8,395 | 480 ₹8,760 |
| 5.20 | Vertical surfaces such as walls(any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 520.6 | Sqm. | 390 ₹2,03,034 Lowest | 480 ₹2,49,888 | 510 ₹2,65,506 |
Tender Value
₹22.9 L
EMD Value
₹45,801
Closing Date
16 Jul 2026, 10:30 amClosed
EE Jal Shakti Division Thural
EE Jal Shakti Division Thural
Demolition of existing sedimentation tank and C/O RCC Sedimentation tank
2026_HPIPH_138154_1
EE/JSVD/THL/2026-27-3830-65 Dt. 04.07.2026
Open Tender
Civil Works
Item Wise
90 days
EE Jal Shakti Division Thural
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
₹45,801
18 Aug 2026
4 Jul 2026
16 Jul 2026
4 Jul 2026
16 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolation of existing damaged and dilapidated sedimentation tank comprising RCC and masonry structures, including breaking, removal of reinforcement, disposal of debris, stacking of reusable materials and clearing the site . complete in all respect as per the direction and to the entire satisfaction of Engineer in charge with in all leads and lifts. | 1 | Job | - | - |
| 2 | Excavation in in earth work and disposal of excavated earth upto a lead of 20 metres and lift upto 1.50 metres disposed earth to be levelled and neatly dressed in pick & jumper work Complete in all respect as per direction of Engineer in charge with in all leads and lifts. | 162.3 | Cum | - | - |
| 3 | Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in Foundation and Plinth Complete in all respect as per direction of Engineer in Charge with in all Leads & Lifts. | 27.95 | Cum | - | - |
| 4Providing and laying cement concrete work 1:1½:3 (1 cement: 1½ sand: 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in : | |||||
| 4.1 | Foundation footing based of columns and the like and mass concrete . complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 20.71 | Cum | - | - |
| 4.2 | Walls (any thickness but not less than 0.10 metre thickness) including attached pilasters buttersses, plinth and string courses etc. from top of foundation upto floor two level as per direction and to the entire satisfaction of Engineer-in-Charge | 66.41 | Cum | - | - |
| 4.3 | Suspended floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and cantilever upto floor two level complete in all respect as per direction of Engineer-in-Charge with in all leads and lifts. | 3.19 | cum | - | - |
| 5Providing form work with steel plated 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for insitu-reinforced concrete and plain. | |||||
| 5.1 | Flat surfaces such as soffits of suspended floors, roofs, landings and the like. Floor etc.upto 200 mm in thickness complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge with in all leads and lifts. | 18.25 | Sqm | - | - |
| 5.2 | Vertical surfaces such as walls(any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 520.6 | Sqm. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Form6.pdf
Tender Documents • 0.43 MB
BOQ_204617.xls
BOQ • 0.28 MB
Form8.pdf
Tender Documents • 1.22 MB
Termsandconditions.pdf
Additional Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].