Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 10 KIRPAL APARTMENT 44 I P EXTENSION EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | Admitted-Fee/PreQual/Technical |
Tender Value
₹15.5 Cr
EMD Value
₹31.4 L
Closing Date
14 Nov 2025, 2:00 pmClosed
Executive Engineer
BHEP Chanderkote
Up gradation of Hydraulic system/ powerpack at all the Gates installed at Dam site and surge shaft emergency gate chamber at Power House BHEP-I, including ARMAC System at Dam
2025_SPDC_291919_1
E NIT NO. 14 OF 2025-26 DATED 14.10.2025
Open Tender
Machineries/ Mechanical Engg Items
Lump-sum
BHEP Chanderkote
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
CPAO BHEP Chanderkote
₹31.4 L
BHEP Chanderkote
2 Jan 2026
14 Oct 2025
17 Nov 2025
14 Oct 2025
14 Nov 2025
30 Oct 2025
14 Oct 2025 - 14 Nov 2025
24 Oct 2025
CHUTE SPILLWAY RADIAL GATE: Supply of Hydraulic Power Pack, Local Control Panel, Angle Transmitter for Gate position indication with cables and accessories.
MAIN SPILLWAY RADIAL GATE: Supply of Hydraulic Power Pack, Local Control Panel, Angle Transmitter for Gate position indication with cables and accessories.
AUXILLARY SPILLWAY VERTICAL GATE: Supply of Hydraulic Power Pack, Local Control Panel, Angle Transmitter for Gate position indication with cables and accessories
INTAKE GATE: Supply of Hydraulic Power Pack, Local Control Panel with cables and accessories
SURGE SHAFT GATE: Supply of Hydraulic Power Pack, Local Control Panel with cables and accessories
Supply of Low Vacuum Dehydration & Degasification Unit (LVDH) should be provided to remove water content present in the oil. This should be mobile unit which can be taken near to any HPU for operating
Supply of Electrostatic Liquid Cleaner (ELC) unit should be provided to remove solid suspended particles (up to 1 micron and below) present in the oil. It should works on the principle of electrostatics to collect the fluid contaminants. This should be mobile unit which can be taken near to any HPU for operating
Supply of Gasoline Engine Power Pack: Gasoline engine operated Power Pack should be provided to operate the hydraulic cylinders in case of power failure. This Power Pack should be able to operate the hydraulic Power Pack at least at half the normal working speed (operating speed 0.10 M / Min). The Power Pack should be portable trolley mounted which can be taken to any Power Pack for operating
Supply of ARMAC system with key features like water level monitoring, real time data processing, flexible programming, data logging, optimization of seasonal levels, etc. to control the above referred gates including all accessories (For further details, refer SBD)
Supply of online silt monitoring system to be integrated into ARMAC system (For further details, refer SBD)
Supply of Hydraulic piping to create a common manifold for all MRgs, CRGs, intake gates, surge shaft gates at their respective locations. Replacing all pressure lines, return lines, and pilot line piping for each gate, from the hydraulic cylinder/servo motor interfaces to the power packs and all accessories (For further details, refer SBD)
Installation of hydraulic power packs, control panels, Angle Transmitter for Gate position indication with cables and accessories alongwith with testing and final commissioning (For further details, refer SBD)
Installation, testing and final commissioning of Low Vacuum Dehydration & Degasification Unit
Installation, testing and final commissioning of Electrostatic Liquid Cleaner
Installation, testing and final commissioning of Gasoline Engine Power Pack
Installation, testing and final commissioning of ARMAC system with key features like water level monitoring, real time data processing, flexible programming, data logging, optimization of seasonal levels, etc. (For further details, refer SBD)
Installation, testing and final commissioning of online silt monitoring system integrated into ARMAC system (For further details, refer SBD)
Installation, testing and final commissioning of Hydraulic piping to create a common manifold for all MRgs, CRGs, intake gates, surge shaft gates at their respective locations. Replacing all pressure lines, return lines, and pilot line piping for each gate, from the hydraulic cylinder/servo motor interfaces to the power packs and all accessories (For further details, refer SBD)
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 1.43 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.66 MB
SBD.pdf
Tender Documents • 0.65 MB
BOQ_940513.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .