Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Finance 0 0 1 196 197 226012 | LUCKNOW | UTTAR PRADESH | 226012 | L1 | Admitted-Finance |
Tender Value
₹7.9 L
EMD Value
₹15,820
Closing Date
27 Feb 2026, 3:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
In Ward 08, construction of boundary wall, pathway, painting, benches, dustbins, swings and horticulture work in the park in front of the Shiv Temple on Stadium Road.
2026_DOLBU_1118709_1
392/CE/CD/25-26 (1 To 20) Sr No 04 LIST NO 35 DATE 18-02-2026
Open Tender
Civil Works
Percentage
90 days
NAGAR NIGAM BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
Bareillyetender.com
₹15,820
20 Apr 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of existing cement plaster including disposal of refuse as directed by the E/I within a distance 60m. | 72.8 | SQM | 50 | ₹3,640 |
| 1.02 | Scraping old white or colour wash including disposal of refuse as directed by the E/I within a distance 60m. | 84 | SQM | 16 | ₹1,344 |
| 1.03 | First class B/w in 1:4 Cement C'sand mortor in F/P including supply of all meterial labour t&P etc required for proper completion of work SI N0. 305(i) | 1 | CUM | 5,350 | ₹5,350 |
| 1.04 | First class B/w in 1:4 Cement C'sand mortor in S/S including supply of all meterial labour t&P etc required for proper completion of work SI N0. (305+307) | 1.5 | CUM | 5,730 | ₹8,595 |
| 1.05 | 12 mm thick plaster in 1:5 cement & c'sand mortor over brick work minimume thickness not less then 10 mm including all supply of meterial , Labour T&P etc S.I.No. 584(i) | 57 | SQM | 210 | ₹11,970 |
| 1.06 | Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I. | 0.5 | CUM | 7,645 | ₹3,822.5 |
| 1.07 | Fabrication of Mild steel or iron work of grill and stair case railling (When not included in an overall rates) brought to required form including supply of steel and its wastage including cost of bolts, nuts and wastage etc. and there fixing if required for proper completion of work.(S.I.No.502c) | 1 | QTL | 8,500 | ₹8,500 |
| 1.08 | P/Laying 2mm thick plaster of paris putty for proper complition of the work as per Direction of E/I all complete As per D.S.R. No. 13.26 | 156.8 | SQM | 115 | ₹18,032 |
| 1.09 | Finishing walls with Acrylic Smooth exterior paint of required shade New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) as per D.S.R. 13.46.1 | 156.8 | SQM | 94 | ₹14,739.2 |
| 1.1 | Two coat painting with synthetic enamel paints on new plain surface with primer of approved quality of colour by E/I. | 1.7 | SQM | 80 | ₹136 |
stage.html
html • 0.03 MB
technical_2079479.pdf
techsummary_2079479.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.03 MB
BOQ_2079479.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .