| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAdmitted-Finance | ₹11.8 L | L1 | Admitted-Finance |
| 2 | L2₹12.3 LAdmitted-Finance | ₹12.3 L | L2 | Admitted-Finance |
| 3 | L3₹12.4 LAdmitted-Finance 41 2 2ND FLOOR SANGATHAN SOCIETY OPP SUN RISE PARK DRIVE IN ROAD AHMEDABAD GUJARAT 380052 | AHMEDABAD | AHMADABAD | GUJARAT | 380052 | ₹12.4 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Criteria not full fill |
| 5 | Rejected-Technical | - | - | Rejected-Technical Criteria Not full fill |
| Sl No | Description | Qty | Unit | SMPA ARCHITECTS L2 | JAG DESIGNERS Pvt Ltd L3 | Arck Design Group L1 |
|---|---|---|---|---|---|---|
| 1.00 | 1. Surveys, Investigations & Conceptual Planning: Conduct all necessary site surveys, including geological investigation of soil and rock, and collect requisite data from concerned departments. Prepare conceptual plans with multiple options, incorporating green building concepts as per Medical Health Society, Guidelines, and obtain the approval from the PWD Chief Architect and the client department. 2. Detailed Cost Estimation: Prepare BOQs, detailed cost estimates for Financial sanction, and all related documents. Submit in two (2) hard copies and soft copies (CD/pen drive) as required. 3. 3D Views: Prepare 3D views of the approved conceptual planning, including sufficient perspectives to clearly present the scheme. Finalize elevations and sections based on approved concepts. 4. Architectural & Structural Drawings: Finalize plans, elevations, and sections, 3D Views and prepare complete detailed working drawings. Provide earthquake-resistant structural designs as per SBC Report, with proof checking from IIT/NIT/Government Engineering Colleges at the consultant’s cost. 5. Services Drawings :Prepare all building services drawings (electrical, sanitary, water supply, sewerage, computer networking, electrical substation, EPBX with telephone wiring, CCTV, solar system, fire fighting, and fire detection systems). 6. Site Supervision – To be carried out during Design/construction phase (estimated duration: 18 months) by visiting the site (limited up to max of six visit’s) as directed by PWD officials. 7. As Built Drawings – Prepare as Built Drawings for the project | 1 | Job | 12,25,000 ₹12.3 L | 12,41,000 ₹12.4 L | 11,79,998.82 ₹11.8 L |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
18 Mar 2026, 6:00 pmClosed
EE PWD Dn. BHIM
BHIM
Architectural consultancy services for the Semi District Hospital (SDH) at Deogarh, in Distt.Rajsamand under PWD Division Bhim
2026_CEPWD_544845_1
NIT No. 34/2025-26 EE PWD Dn. BHIM
Open Tender
Consultancy
540 days
BHIM
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Through Chalan
₹30,000
Yes
17 Apr 2026
10 Mar 2026
19 Mar 2026
10 Mar 2026
18 Mar 2026
10 Mar 2026
1. Surveys, Investigations & Conceptual Planning: Conduct all necessary site surveys, including geological investigation of soil and rock, and collect requisite data from concerned departments. Prepare conceptual plans with multiple options, incorporating green building concepts as per Medical Health Society, Guidelines, and obtain the approval from the PWD Chief Architect and the client department. 2. Detailed Cost Estimation: Prepare BOQs, detailed cost estimates for Financial sanction, and all related documents. Submit in two (2) hard copies and soft copies (CD/pen drive) as required. 3. 3D Views: Prepare 3D views of the approved conceptual planning, including sufficient perspectives to clearly present the scheme. Finalize elevations and sections based on approved concepts. 4. Architectural & Structural Drawings: Finalize plans, elevations, and sections, 3D Views and prepare complete detailed working drawings. Provide earthquake-resistant structural designs as per SBC Report, with proof checking from IIT/NIT/Government Engineering Colleges at the consultant’s cost. 5. Services Drawings :Prepare all building services drawings (electrical, sanitary, water supply, sewerage, computer networking, electrical substation, EPBX with telephone wiring, CCTV, solar system, fire fighting, and fire detection systems). 6. Site Supervision – To be carried out during Design/construction phase (estimated duration: 18 months) by visiting the site (limited up to max of six visit’s) as directed by PWD officials. 7. As Built Drawings – Prepare as Built Drawings for the project
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_971863.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.58 MB
NITNo34.pdf
Tender Documents • 6.57 MB
BOQ_971863.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid