Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAdmitted-Finance | ₹4.3 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | Beaver Infra Consultants pvt ltd L1 |
|---|---|---|---|---|
| 1.00 | Remuneration for Local Professional Staff
Team Leader cum senior Tunnel Expert | 9 | Staff moths | 3,49,000 ₹31,41,000 Lowest |
| 2.00 | Tunnel Design Expert | 9 | Staff moths | 3,24,000 ₹29,16,000 Lowest |
| 3.00 | Senior Geologist | 9 | Staff moths | 2,90,000 ₹26,10,000 Lowest |
| 4.00 | Senior Geotechnical Engineer | 9 | Staff moths | 2,50,000 ₹22,50,000 Lowest |
| 5.00 | Senior E & M Expert | 8 | Staff moths | 1,90,000 ₹15,20,000 Lowest |
| 6.00 | Senior Survey Engineer | 8 | Staff moths | 1,15,000 ₹9,20,000 Lowest |
| 7.00 | Environmental specialist | 6 | Staff moths | 1,64,000 ₹9,84,000 Lowest |
| 8.00 | Land Acquisition Expert | 8 | Staff moths | 1,45,000 ₹11,60,000 Lowest |
| 9.00 | Material Engineer | 8 | Staff moths | 1,13,000 ₹9,04,000 Lowest |
| 10.00 | Highway cum Pavement Engineer | 6 | Staff moths | 1,13,000 ₹6,78,000 Lowest |
Tender Value
₹4.4 Cr
EMD Value
₹10 L
Closing Date
28 Dec 2024, 11:00 amClosed
Superintending Engineer
7th Circle, HPPWD, Dalhousie
feasibilty study and detailed project report for construction of traffic tunnel of double lane standard on Chowari to Chamba road in District Chamba HP
2024_PWD_96718_1
NIT No. 11181-11210 dated 16.12.2024
Open Tender
Consultancy
Item Rate
270 days
Dalhousie
Please refer Tender documents.
12 documents required · 12 mandatory
₹10,000
₹10 L
18 Jan 2025
18 Dec 2024
28 Dec 2024
18 Dec 2024
28 Dec 2024
18 Dec 2024
18 Dec 2024 - 21 Dec 2024
Amount
Remuneration for Local Professional Staff Team Leader cum senior Tunnel Expert
Tunnel Design Expert
Senior Geologist
Senior Geotechnical Engineer
Senior E & M Expert
Senior Survey Engineer
Environmental specialist
Land Acquisition Expert
Material Engineer
Highway cum Pavement Engineer
Quantity Surveyor cum Documentation expert
Sub Professional staff Staff 1
staff 2
Satff 3
Staff 4
Staff 5
Satff 6
Satff 7
Support Staff Office Manager
Typist
Office Boy
Night Watchman
Tranportation The Vehicles provided by the consultants shall include the cost for rental drivers,operation,maintenance,repairs,insurance,etc for use of consultants
Duty Travel to site (Fixed costs) ( Seven Trips)
Office Rent (Fixed costs) he rent cost includes maintenance,cleaning,repairs,etc
Office Supplies Utilities and Communication (Fixed costs) Office Supplies Drafting
Supplies Computer
Running Costs
Domestic and international cimmunication
office Furniture and Equipments
Reports and document printing Monthly report (3 per month)
Inception Report & QAP
Enviornment and social impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with LA Reports
Draft LA and clearances Report
Final LA and clearances Report
Draft Environmental Assesment report & RAP
Final Environmental Assesment report & RAP
Draft Detailed Design report & Drrawings etc
Draft EMP
Draft Bidding Documments
Final Detailed project report with bill of quantities, cost Estimates Updated Drawings etc
Final EMP
Final Bidiing Documents
Drat 3(a) 3(A) and 3(D) notification for land acquisition (3 copies each)
LA & Clearances II Report
Survey and Investigation Topographic survey including hire changes for equipment and supply of survey Teams composing of project survey field staff etc inclusive of cost of materials labourer
Detailed topographic surveys using mobile/ aenal Lidar or better technology
Investigation (Fixed cost) Road and bridge inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material survey and investigation
Sub grade investigation
traffic survey
social economic and census survey/ studies
Land acquisition studies
Geophysical investigations
Any other investigations/ survey
Sub-Soil Investigation (Boring) Boring in all type of soils (including hard rock)
Network survey and GPR Network survey of the existing Highways as a repository for civil work as per direction from Authority
GPR Survey for detection of under utilities
Cost of supply and fixing boundary pillars Procuring and fixing boundary pillas and its installation, complete in all respect as per IRC 25, 1987 wherever the proposed alignment follows the existing alignment the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of way wherever there is a proposal of realignmentof the existing Highway and construction of new Bypass consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50m interval (lumpsum)
Land acquisition Team including support staff and logistics/transportation Ex-Land revenue inspector/officer or equivalent(1 No.)
EX Kanugoo or equivalent(1 No)
Ex Patwari or equivalent( 1 No).
Typist(2 Nos)
Peon ( 1 No.).
Logistic for Land Acquistion Team Computer including necessary penpherals( 2 Nos.)
Printers ( 2 No).
Vehicle with monthly running limit of 4000 Kms ( 1 No.).
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_142002.xls
BOQ • 0.28 MB
RFP.pdf
Tender Documents • 4.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .