| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC WARD NO 04 NEAR LIC PARASIA PARASIA CHHINDWARA MADHYA PRADESH 480441 | CHHINDWARA | MADHYA PRADESH | 480441 | ₹1.1 Cr Quoted ₹91.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.0 Cr+₹8.2 L (8.98%)Rejected-Finance ANUPPUR M P | ₹1.0 Cr+₹8.2 L (8.98%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical A 49 10 VINDHYA COLONY PINOURA DISTRICT UMARIA MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | - | - | Rejected-Technical Not complied work experience as define in NIT. |
| 4 | Rejected-Technical MAIN ROAD BISHRAMPUR SURAJPUR CG 497226 | SURAJPUR | CHHATTISGARH | 497226 | - | - | Rejected-Technical Not complied work experience as define in NIT. |
| 5 | Rejected-Technical 615 BHAIROTAL BAZA DAFAI BHAIROTAL KORBA CG 495454 | KORBA | CHHATTISGARH | 495454 | - | - | Rejected-Technical Not complied work experience as define in NIT. |
Tender Value
₹1.4 Cr
EMD Value
₹1.8 L
Closing Date
6 Dec 2022, 5:00 pmClosed
SO(Mining) Baikunthpur Area.
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
Cleaning of spillage coal and maintenance of belt conveyor in Seam-I of Katkona 1 and 2 Incline.
2022_SECL_262235_1
SECL/BKP/SO(M)/22-23/K1/eT/50 Dt.14.11.2022
Open Tender
Civil Works - Others
Item Rate
365 days
katkona 1and 2 incline
Please refer Tender document
5 documents required · 5 mandatory
₹1.8 L
28 Jan 2023
16 Nov 2022
8 Dec 2022
17 Nov 2022
6 Dec 2022
17 Nov 2022
17 Nov 2022 - 29 Nov 2022
Amount
Item Description/ Heading (Work period - 365 days).
Maintenance of belt conveyors in underground including jobs like cleaning of spillage coal, levelling, alignment of belt & replacing of top & bottom rollers & repairing of joints etc. ( Tippler belt, TB-1 Belt, TB-2 belt, TB-5 belt, TB-6 belt, TB-7 belt & TB-8 belt). (Working days - 312, Total manpower - 5870).
Maintenance of belt conveyors in underground including jobs like cleaning of spillage coal, levelling, alignment of belt & replacing of top & bottom rollers & repairing of joints etc. ( Incline belt, TB-3 Belt & TB-4 belt). (Working days - 234, Total manpower - 2612).
Total impact of GST for the purpose of CTC
SAI SHREE CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .