| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | L1 | Accepted-AOC Agreement executed | |
| 2 | L2₹4.9 L+₹9,630 (2.00%)Rejected-Finance | L2 | Rejected-Finance Lowest quoted amount. LoA forwarded | |
| 3 | L3₹5.3 L+₹50,692 (10.5%)Rejected-Finance | L3 | Rejected-Finance Lowest quoted amount. LoA forwarded |
| Sl No | Description | Qty | Unit | Varghese.K.T L2 | k v john L3 | C RAMESHAN L1 |
|---|---|---|---|---|---|---|
| 1.00Appendix A | ||||||
| 1.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 1.45 | Hectare | 53,236.53 ₹77,192.97 | 57,686.64 ₹83,645.63 | 52,192.67 ₹75,679.37 Lowest |
| 1.00 | 3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)<br> | 200 | metre | 77.38 ₹15,476 | 83.85 ₹16,770 | 75.87 ₹15,174 Lowest |
| 1.00 | OD25738/2026-2027:Using 1 cubic meter capacity bucket excavator for removing all kind of unauthorized materials from road. | 20 | hour | 1,538.31 ₹30,766.2 | 1,666.9 ₹33,338 | 1,508.14 ₹30,162.8 Lowest |
| 1.00 | 10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. | 400 | sqm | 56.48 ₹22,592 | 61.2 ₹24,480 | 55.38 ₹22,152 Lowest |
| 1.00 | OD25739/2026-2027:Engaging Man mazdoor for removing soil from the existing drain and chocked culverts and
lifting and refixing the covering slabs of drain | 20 | each | 1,019.58 ₹20,391.6 | 1,104.81 ₹22,096.2 | 999.59 ₹19,991.8 Lowest |
| 1.01 | OD25742/2026-2027:Engaging wood cutter for cutting the branches of tree and damaged tree | 25 | each | 1,128.65 ₹28,216.25 | 1,223 ₹30,575 | 1,106.52 ₹27,663 Lowest |
| 1.01 | OD25743/2026-2027:Engaging Tipper | 4 | Day | 8,779.61 ₹35,118.44 | 9,513.5 ₹38,054 | 8,607.45 ₹34,429.8 Lowest |
| 1.01 | OD25744/2026-2027:Engaging mazdoor for carrying and shifting cut down wooden logs and clearing site | 45 | each | 1,019.58 ₹45,881.1 | 1,104.81 ₹49,716.45 | 999.59 ₹44,981.55 Lowest |
| 1.01 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br> | 47.5 | cum | 73.95 ₹3,512.63 | 80.14 ₹3,806.65 | 72.5 ₹3,443.75 Lowest |
Tender Value
₹5.1 L
EMD Value
₹12,673
Closing Date
13 Jul 2026, 6:00 pmClosed
Assistant Executive Engineer
O/o Office of the Assistant Executive Engineer, NH
GENERAL-GENERAL-Pre-Monsoon work 2025-26-Clearing drain,chocked culvert,providing earthen drain and cutting dangerous branches of trees from km 170/600 to 177/600 of Old NH-66-General civil work
2026_PWD_859461_1
PWD/NH/TR/7621/2026_5_1_1/1
Open Tender
Civil Works - Highways
Item Rate
180 days
KANNUR
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,120
Yes
₹12,673
Yes
8 Sept 2026
7 Jul 2026
16 Jul 2026
7 Jul 2026
13 Jul 2026
7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A | |||||
| 1.001 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | - | Hectare | - | - |
| 1.002 | 3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)<br> | - | metre | - | - |
| 1.003 | OD25738/2026-2027:Using 1 cubic meter capacity bucket excavator for removing all kind of unauthorized materials from road. | - | hour | - | - |
| 1.004 | 10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. | - | sqm | - | - |
| 1.005 | OD25739/2026-2027:Engaging Man mazdoor for removing soil from the existing drain and chocked culverts and
lifting and refixing the covering slabs of drain | - | each | - | - |
| 1.006 | OD25742/2026-2027:Engaging wood cutter for cutting the branches of tree and damaged tree | - | each | - | - |
| 1.007 | OD25743/2026-2027:Engaging Tipper | - | Day | - | - |
| 1.008 | OD25744/2026-2027:Engaging mazdoor for carrying and shifting cut down wooden logs and clearing site | - | each | - | - |
| 1.009 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br> | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1453209.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.64 MB
BOQ_1453209.xls
BOQ • 0.30 MB
preliminary.pdf
Other Document • 0.35 MB
epay.pdf
Additional Documents • 0.07 MB
IntegrityPactandFormofTender.pdf
Additional Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .