Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | +9.90% | ₹2.2 L | L1 | Admitted-Finance |
| 2 | L2₹2.2 L+₹2,180.53 (1.00%)Admitted-Finance | +11.00% | ₹2.2 L+₹2,180.53 (1.00%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 L+₹10,109.73 (4.64%)Admitted-Finance | +15.00% | ₹2.3 L+₹10,109.73 (4.64%) | L3 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹2,500
Closing Date
10 Aug 2026, 6:00 pmClosed
PROJECT OFFICER
OFFICE OF THE PROJECT OFFICER MOONIDIH WASHERY
Urgent Installation of new Crushing Equipment and Strengthening of Existing Equipment at Analytical lab at Moonidih Coal Washery.
2026_BCCL_362769_1
BCCL/PO/MND/EnM/E -Tender/2026-27/E 261
Open Tender
Miscellaneous Works
Percentage
10 days
MOONIDIH WASHERY
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,500
18 Aug 2026
30 Jul 2026
11 Aug 2026
30 Jul 2026
10 Aug 2026
31 Jul 2026
31 Jul 2026 - 6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item Description/ Heading | - | - | - | - |
| 2 | Site preparation/ removal of spilled coal & unwanted material from work site | - | Shifts | 4,264 | - |
| 3 | Fabrication & Erection of MS Structure | - | MT | 32,450 | - |
| 4 | Dismantling work | - | MT | 3,600 | - |
| 5 | Transportation of steel material from plant area to work site and scrap material from work site to scrap yard | - | MT | 1,805 | - |
| 6 | Dismantling , Repairing and Strengthening of V-belt, pulley guard structure and base frame of old Jaw Crusher 12.50mm | - | Shifts | 4,784 | - |
| 7 | Dismantling, Repairing and strengthening of V-belt, pulley guard structure and base frame of motor of old Jaw Crusher 200 X 100 | - | Shifts | 4,784 | - |
| 8 | Dismantling, Repairing and Strengthening and Re-fitting of base frame of motor & gear box of old Double roll Crusher | - | Shifts | 4,784 | - |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level 1:1:5:3 (1 cement:1.5 coarse sand (zone-III) derived from natural sources:3 graded stone aggregate 20mm nominal size derived from natural sources) | 1 | M3 | 6,856.3 | ₹6,849.44 |
| 10 | Demolishing R.C.C. work manually/ by mechanical means disposal of unservicable material with 50 meters lead as per direction of Engineer-In-charge. | 1 | M3 | 2,126.1 | ₹2,123.97 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.44 MB
BOQ_375673.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .