| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-Finance | ₹2.1 L | 1 | Accepted-Finance The lowest amount of Rs 211607.11/- quoted by Sri. MUHAMMED ALI K M is genuine hence accepted |
| 2 | 2₹2.3 L+₹14,030.89 (6.63%)Accepted-Finance | ₹2.3 L+₹14,030.89 (6.63%) | 2 | Accepted-Finance The lowest amount of Rs 211607.11/- quoted by Sri. MUHAMMED ALI K M is genuine hence accepted |
| Sl No | Description | Qty | Unit | AYUB.K.M L2 | MUHAMMED ALI K.M L1 |
|---|---|---|---|---|---|
| 1.00Appendix -A | |||||
| 1.00 | OD53577/2025-2026:Engaging man mazdoor for removing slipped earth | 24 | 1 nos | 1,200 ₹28,800 | 1,082.18 ₹25,972.32 Lowest |
| 1.00 | OD5949/2026-2027:
Hire charges of Hitachi /other hydraulic machineries as per the requirement at site,including Driver bata and Fuel charges etc.complete. | 20 | hour | 1,500 ₹30,000 | 1,468.06 ₹29,361.2 Lowest |
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 74 | each | 750 ₹55,500 | 675.98 ₹50,022.52 Lowest |
| 1.00 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 25 | each | 950 ₹23,750 | 919.09 ₹22,977.25 Lowest |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 6 | each | 12,000 ₹72,000 | 11,391.49 ₹68,348.94 Lowest |
| 1.01 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 12 | each | 1,299 ₹15,588 | 1,243.74 ₹14,924.88 Lowest |
Tender Value
₹2.1 L
EMD Value
₹5,290
Closing Date
5 Aug 2026, 3:30 pmClosed
AEE Irrigation subdivision thalappilly
AEE Irrigation subdivision thalappilly
To cut and remove ,the already fallen trees inside the canal and branches of standing trees and felling trees, which threaten to the life and property, engaging labour and engaging hitachi for removing slipped earth in canal and chiras
2026_Irrig_863515_1
IRR/IA/TR/838/2026_5_18_17/1
Open Tender
Civil Works - Others
Item Rate
180 days
Wadakkanchery
Please refer Tender document
7 documents required · 7 mandatory
₹555
Yes
₹5,290
Yes
24 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
5 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix -A | |||||
| 1.001 | OD53577/2025-2026:Engaging man mazdoor for removing slipped earth | - | 1 nos | - | - |
| 1.002 | OD5949/2026-2027:
Hire charges of Hitachi /other hydraulic machineries as per the requirement at site,including Driver bata and Fuel charges etc.complete. | - | hour | - | - |
| 1.003 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - |
| 1.004 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.005 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | - | each | - | - |
| 1.006 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1460668.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Integritypact.pdf
Other Document • 0.11 MB
Formanddeclarationsandaffidavit.pdf
Other Document • 0.16 MB
SBD.pdf
Tender Documents • 1.64 MB
preliminaryagreeement.pdf
Other Document • 0.17 MB
BOQ_1460668.xls
BOQ • 0.30 MB
Epaymentrequisitionandconditions.pdf
Other Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .