Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
18 Sept 2026, 6:00 pmClosed
Executive Engineer, KBC Division No. 2/5, Radhanpur
Repairing of Rain Damages Occurred in kachchh Branch canal 65.759 km to 82.300 km And Its Network for the year 2026-27
344129
8 of 2026-27
Open
Civil Works - Canal
Works
Patan
7 documents required · 7 mandatory
₹4,248
Executive Engineer, Kachchh Branch Canal Division No. 2.5, Radhanpur
₹1.1 L
10 Sept 2026
10 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
Dismantling the R.C.C. work and
disposing off the stuff including stacking
1 of the useful materials etc. complete as Cum 269.986 1732.80
directed.Light Reinforcement ( Main bar
upto 16 mm. dia. )
Excavation for foundation in all sorts of
soil including yellow sandy gravelly soils
,soft & hard murrum etc. in dry condition
including depositing the excavated stuff in
uniform layers in banks or as and where
directed etc. complete for lead up to 500m
and all lift. (BY MACHINERY) (b) Including
dewatering.
Providing & Laying in position "DESIGN
MIX" cement concrete using cement sand
and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary
formwork, centering, scaffolding,
compaction by vibrator, curing as directed
with all lead & lift etc complete without
dewatering and excluding the cost of steel
reinforcement.(a) Concrete grade M-15
and MSA-20 mm
For Column / Beam / Solid Slab of Road
4 Bridge / Barrel / Cutoff wall etc.(q) Cum 186.770 5642.00
Concrete grade M-25 and MSA-20 mm
For Parapet wall of Road Bridge /
5 Structure. Cum 5.887 8023.00
Providing & Placing in position
reinforcement bars including cutting,
6 bending, welding joints where necessary, MT 14.449 71366.00
hooking etc. complete as per drawing for
all lead and lifts.(A)TMT / CRS (FE 500 D)
Backfilling the foundation trenches
7 excavated stuff including watering, Cum 436.871 36.90
ramming, compacting etc. complete. (By
Machinery)
Earth work in embankment from borrow
pits in all sorts of soil and soft murrum or
other suitable strata as directed including
breaking the clods and dressing to the
design sections including cutting the
proud section with lead as under and all
lift including site clearing etc. complete.
(A)For All Canal Capasity
Extra Lead Charges For each additional
km lead or part thereof beyond 1.0 km and
9 upto 5.0 km for embankment work Cum 51.00
including all lifts etc.complete.
Compaction of earthwork in embakment in
uniform layers of optimum moisture
10 content to require dry density including Sqm 8.42
watering, ramming manually etc complete
Trimming of the canal section manually
for preparing sub grade for laying cement
concrete (C.C.) lining in all sorts of soil
and murrum including watering and
compacting bed etc. complete.
Providing & laying 7.5 cms thick cast in
situ C.C. 1:2:4 grade with the use of
crushed aggregates for canal lining works
incl. use of all equipments, scaffolding,
centering form work etc. with finishing as
required to the exposed surface, making
asphalt joints as directed and watering
and curing (without sleepers) with all lead
& lifts etc. complete. 7.5 cm thick lining in
bed & Slope
Providing and laying plain/ reinforced
cement concrete lining of Nominal Mix M-
15(MSA-20 mm) in bed, side slopes and
curvature including mixing, transporting,
13 placing, vibrating, smooth finishing,
curing including dewatering where
required. (MANUALLY WITH
CONVENTIONAL MIXER)
15cm Thick Lining in bed/Slope with
water curing
Providing diversion of road during
construction and maintenance of the same
14 till completion of structure including red Km 0.050
signal.(a) For cart track or V.R
Providing and laying plain/ reinforced
cement concrete lining of Nominal Mix M-
15(MSA-20 mm) in bed, side slopes and
curvature including mixing, transporting,
placing, vibrating, smooth finishing,
curing including dewatering where
required. (MANUALLY WITH
CONVENTIONAL MIXER)
12.5cm Thick Lining in Slope with water
Clearing silt from canal /drain bed by
digging the same to the required bed level
and gradiant incl. depositing the
excavated earth regularly inspoil bank for
utilising the same fo rpreparing the bund
after breaking clods as
and where directed for lead upto
200m&lift up to 3 m as under (excluding
weed cutting).
(b) For canal 20 to 250 Cusecs. cmt 6387.934 177.50
(a) For canal below 20 Cusecs. cmt 2150.398 147.90
Dismantling the C.C. lining including
including disposing off the dismentalled
17 materials as directed etc. complete.A-11(b) Sqm 6197.429 86.50
7.5 cm thick lining.
Dismantling the C.C. lining including
including disposing off the dismentalled
18 materials as directed etc. complete. Sqm 926.950 115.50
A-11 10 cm thick lining
Repair and Test for 1 joint for GRP Pipe
line After the Laying Pipe leakage found
then repair on site Calculation including
cost repair, Desilting, Dewatering and
19 Excavation work etc. complete as directed Nos 10.000 16541.00
(a) 250 mm -500mm Dia.
(b)600mm -1100mm Dia. Nos 10.000 21594.00
/We am/are willing to carry out the work at....................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our tender
works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(A) For Item Rate Tender (For aboveINR 50 Cr.):
ItemN Description of Item Quantity Unit Rate Amount
o (with brief
specificationandreferen In In
cetobookofspecification figures Words
(A)TotalTenderedAmount
(B)Rebateonabovetenderedamount(ifany)%(infigure)………………………………
(inwords)………………………………………………….………………………………………………...
(C)NetTenderedAmount(A-B)(infigure)………………………………
(inwords)………………………………………………….………………………………………………...
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as perGovt.
G.R.: CE(QC)/PB/Mix Design/04/2024 Date:20/01/2024 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original itemat
the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
SBD .pdf
Special instructions.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .