Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
7 Aug 2023, 4:00 pmClosed
DGM - M AND D
MFL, MANALI, CHENNAI
APPOINTMENT OF RAILHEAD HANDLING, FOL AND PRIVATE WAREHOUSE CONTRACTORS AT 8 LOCATIONS
2023_MFL_764124_1
ESER/M AND D/IP/RHFOL8 - 2/070823/003 DT.28.07.23
Open Tender
Miscellaneous Services
Works
365 days
MFL, MANALI
EMD DETAILS - REFER ANNEXURE 6
3 documents required · 3 mandatory
₹0
Exempted
7 Sept 2023
28 Jul 2023
8 Aug 2023
28 Jul 2023
7 Aug 2023
28 Jul 2023
Railhead Handling – Schedule of Rates:
Unloading of wagons within specified free time allowed by Railways, stacking at platform, de-stacking at platform and loading into trucks at railhead. (Rs./MT)
Private Warehouse – Schedule of Rates:
Storage charges exclusive of insurance coverage for the products in storage – per calendar month (Rs./MT)
Transportation of the bags from Railhead to warehouse (Rs./MT)
Unloading of bags from trucks & stacking (Rs./MT)
Breaking the stack and loading into trucks (Rs./MT)
FOL – Schedule of Rates (Distance Slab in KMs):
Miscellaneous Items: (Not Considered for Weighted Average Rate)
Transportation of bags from warehouse to railhead and loading into wagons,(Rs./MT)
Standardization of cut / torn / damaged bags including de-stacking, segregation of damaged and sound products, changing of gunnies, machine stitching including cost of thread and stitching. (Rs./MT)
Handling of empty bags per bundle including clearance & transportation from lorry booking offices, unloading and stacking and all other operations until the bags are consumed (bundle = 500 HDPE bags). ( Rs. per bundle)
Stenciling of gunnies per hundred (Rs. per hundred gunnies)
Description of Work / Item(s)
Railhead Handling – Schedule of Rates:
Unloading of wagons within specified free time allowed by Railways, stacking at platform, de-stacking at platform and loading into trucks at railhead. (Rs./MT)
Private Warehouse – Schedule of Rates:
Storage charges exclusive of insurance coverage for the products in storage – per calendar month (Rs./MT)
Transportation of the bags from Railhead to warehouse (Rs./MT)
Unloading of bags from trucks & stacking (Rs./MT)
Breaking the stack and loading into trucks (Rs./MT)
FOL – Schedule of Rates (Distance Slab in KMs):
Miscellaneous Items: (Not Considered for Weighted Average Rate)
Transportation of bags from warehouse to railhead and loading into wagons,(Rs./MT)
Standardization of cut / torn / damaged bags including de-stacking, segregation of damaged and sound products, changing of gunnies, machine stitching including cost of thread and stitching. (Rs./MT)
Handling of empty bags per bundle including clearance & transportation from lorry booking offices, unloading and stacking and all other operations until the bags are consumed (bundle = 500 HDPE bags). ( Rs. per bundle)
Stenciling of gunnies per hundred (Rs. per hundred gunnies)
Description of Work / Item(s)
Railhead Handling – Schedule of Rates:
Unloading of wagons within specified free time allowed by Railways, stacking at platform, de-stacking at platform and loading into trucks at railhead. (Rs./MT)
Private Warehouse – Schedule of Rates:
Storage charges exclusive of insurance coverage for the products in storage – per calendar month (Rs./MT)
Transportation of the bags from Railhead to warehouse (Rs./MT)
Unloading of bags from trucks & stacking (Rs./MT)
Breaking the stack and loading into trucks (Rs./MT)
FOL – Schedule of Rates (Distance Slab in KMs):
Miscellaneous Items: (Not Considered for Weighted Average Rate)
Transportation of bags from warehouse to railhead and loading into wagons,(Rs./MT)
Standardization of cut / torn / damaged bags including de-stacking, segregation of damaged and sound products, changing of gunnies, machine stitching including cost of thread and stitching. (Rs./MT)
Handling of empty bags per bundle including clearance & transportation from lorry booking offices, unloading and stacking and all other operations until the bags are consumed (bundle = 500 HDPE bags). ( Rs. per bundle)
Stenciling of gunnies per hundred (Rs. per hundred gunnies)
Description of Work / Item(s)
Railhead Handling – Schedule of Rates:
Unloading of wagons within specified free time allowed by Railways, stacking at platform, de-stacking at platform and loading into trucks at railhead. (Rs./MT)
Private Warehouse – Schedule of Rates:
Storage charges exclusive of insurance coverage for the products in storage – per calendar month (Rs./MT)
Transportation of the bags from Railhead to warehouse (Rs./MT)
Unloading of bags from trucks & stacking (Rs./MT)
Breaking the stack and loading into trucks (Rs./MT)
FOL – Schedule of Rates (Distance Slab in KMs):
Miscellaneous Items: (Not Considered for Weighted Average Rate)
Transportation of bags from warehouse to railhead and loading into wagons,(Rs./MT)
Standardization of cut / torn / damaged bags including de-stacking, segregation of damaged and sound products, changing of gunnies, machine stitching including cost of thread and stitching. (Rs./MT)
Handling of empty bags per bundle including clearance & transportation from lorry booking offices, unloading and stacking and all other operations until the bags are consumed (bundle = 500 HDPE bags). ( Rs. per bundle)
Stenciling of gunnies per hundred (Rs. per hundred gunnies)
Description of Work / Item(s)
Railhead Handling – Schedule of Rates:
Unloading of wagons within specified free time allowed by Railways, stacking at platform, de-stacking at platform and loading into trucks at railhead. (Rs./MT)
Private Warehouse – Schedule of Rates:
Storage charges exclusive of insurance coverage for the products in storage – per calendar month (Rs./MT)
Transportation of the bags from Railhead to warehouse (Rs./MT)
Unloading of bags from trucks & stacking (Rs./MT)
Breaking the stack and loading into trucks (Rs./MT)
FOL – Schedule of Rates (Distance Slab in KMs):
Miscellaneous Items: (Not Considered for Weighted Average Rate)
Transportation of bags from warehouse to railhead and loading into wagons,(Rs./MT)
Standardization of cut / torn / damaged bags including de-stacking, segregation of damaged and sound products, changing of gunnies, machine stitching including cost of thread and stitching. (Rs./MT)
Handling of empty bags per bundle including clearance & transportation from lorry booking offices, unloading and stacking and all other operations until the bags are consumed (bundle = 500 HDPE bags). ( Rs. per bundle)
Stenciling of gunnies per hundred (Rs. per hundred gunnies)
Description of Work / Item(s)
Railhead Handling – Schedule of Rates:
Unloading of wagons within specified free time allowed by Railways, stacking at platform, de-stacking at platform and loading into trucks at railhead. (Rs./MT)
Private Warehouse – Schedule of Rates:
Storage charges exclusive of insurance coverage for the products in storage – per calendar month (Rs./MT)
Transportation of the bags from Railhead to warehouse (Rs./MT)
Unloading of bags from trucks & stacking (Rs./MT)
Breaking the stack and loading into trucks (Rs./MT)
FOL – Schedule of Rates (Distance Slab in KMs):
Miscellaneous Items: (Not Considered for Weighted Average Rate)
Transportation of bags from warehouse to railhead and loading into wagons,(Rs./MT)
Standardization of cut / torn / damaged bags including de-stacking, segregation of damaged and sound products, changing of gunnies, machine stitching including cost of thread and stitching. (Rs./MT)
Handling of empty bags per bundle including clearance & transportation from lorry booking offices, unloading and stacking and all other operations until the bags are consumed (bundle = 500 HDPE bags). ( Rs. per bundle)
Stenciling of gunnies per hundred (Rs. per hundred gunnies)
Description of Work / Item(s)
Railhead Handling – Schedule of Rates:
Unloading of wagons within specified free time allowed by Railways, stacking at platform, de-stacking at platform and loading into trucks at railhead. (Rs./MT)
Private Warehouse – Schedule of Rates:
Storage charges exclusive of insurance coverage for the products in storage – per calendar month (Rs./MT)
Transportation of the bags from Railhead to warehouse (Rs./MT)
Unloading of bags from trucks & stacking (Rs./MT)
Breaking the stack and loading into trucks (Rs./MT)
FOL – Schedule of Rates (Distance Slab in KMs):
Miscellaneous Items: (Not Considered for Weighted Average Rate)
Transportation of bags from warehouse to railhead and loading into wagons,(Rs./MT)
Standardization of cut / torn / damaged bags including de-stacking, segregation of damaged and sound products, changing of gunnies, machine stitching including cost of thread and stitching. (Rs./MT)
Handling of empty bags per bundle including clearance & transportation from lorry booking offices, unloading and stacking and all other operations until the bags are consumed (bundle = 500 HDPE bags). ( Rs. per bundle)
Stenciling of gunnies per hundred (Rs. per hundred gunnies)
Description of Work / Item(s)
Railhead Handling – Schedule of Rates:
Unloading of wagons within specified free time allowed by Railways, stacking at platform, de-stacking at platform and loading into trucks at railhead. (Rs./MT)
Private Warehouse – Schedule of Rates:
Storage charges exclusive of insurance coverage for the products in storage – per calendar month (Rs./MT)
Transportation of the bags from Railhead to warehouse (Rs./MT)
Unloading of bags from trucks & stacking (Rs./MT)
Breaking the stack and loading into trucks (Rs./MT)
FOL – Schedule of Rates (Distance Slab in KMs):
Miscellaneous Items: (Not Considered for Weighted Average Rate)
Transportation of bags from warehouse to railhead and loading into wagons,(Rs./MT)
Standardization of cut / torn / damaged bags including de-stacking, segregation of damaged and sound products, changing of gunnies, machine stitching including cost of thread and stitching. (Rs./MT)
Handling of empty bags per bundle including clearance & transportation from lorry booking offices, unloading and stacking and all other operations until the bags are consumed (bundle = 500 HDPE bags). ( Rs. per bundle)
Stenciling of gunnies per hundred (Rs. per hundred gunnies)
Sri Vijayaram Transport
G K LOGISTICS
AWAZE LIMITED
LENDI RYOTS MUTUALLY AIDEDMULTIPURPOSE CO OPERATIVE SOCIETY LTD
BSR Roadlines
AWAZE LIMITED
LENDI RYOTS MUTUALLY AIDEDMULTIPURPOSE CO OPERATIVE SOCIETY LTD
Sri Vijayaram Transport
BSR Roadlines
Sri Vijayaram Transport
AWAZE LIMITED
LENDI RYOTS MUTUALLY AIDEDMULTIPURPOSE CO OPERATIVE SOCIETY LTD
BSR Roadlines
G K LOGISTICS
AWAZE LIMITED
LENDI RYOTS MUTUALLY AIDEDMULTIPURPOSE CO OPERATIVE SOCIETY LTD
BSR Roadlines
G K LOGISTICS
AWAZE LIMITED
LENDI RYOTS MUTUALLY AIDEDMULTIPURPOSE CO OPERATIVE SOCIETY LTD
Sri Vijayaram Transport
G K LOGISTICS
AWAZE LIMITED
LENDI RYOTS MUTUALLY AIDEDMULTIPURPOSE CO OPERATIVE SOCIETY LTD
AWAZE LIMITED
LENDI RYOTS MUTUALLY AIDEDMULTIPURPOSE CO OPERATIVE SOCIETY LTD
G K LOGISTICS
BSR Roadlines
AWAZE LIMITED
LENDI RYOTS MUTUALLY AIDEDMULTIPURPOSE CO OPERATIVE SOCIETY LTD
G K LOGISTICS
BSR Roadlines
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .