Loading…
Loading…
Tender ID
Tender Value
₹2.9 Cr
EMD Value
₹3.0 L
Closing Date
25 Mar 2026, 6:00 pmClosed
The Executive Engineer
Protection work of canal embankment providing Gabion Wall at U/S of CR/CSY at Ch. 11900 m of LBC for year 2025-26
283032
52 of 2025-26
Open
Civil Works - Canal
Works
Surendranagar
6 documents required · 6 mandatory
₹4,248
Yes
Executive Engineer SBC Dn No.4/1 Limbdi
₹3.0 L
Yes
5 Mar 2026
5 Mar 2026
5 Mar 2026
25 Mar 2026
5 Mar 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer
may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all construction plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered in
the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the
contract documentation shall be made before entering rates or prices against each item
in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Canal work Road and Bridge works. For building works
specifications for building are to be followed work.
9. Errors will be corrected by the Employer for any arithmetic error pursuant to Clause
29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed air
drilling for its removal, and which cannot be extracted by ripping with a tractor of at
least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Name of Division: Executive Engineer, S.B.C. Dn. No. 4/1, Limbdi.
Name of Work: - Protection work of canal embankment providing Gabion Wall at U/S of
CR/CSY at Ch. 11900 m of LBC for year 2025-26
Description of Item Quantity Unit Amount in Rs.
Exacavation in all sort of strata and 2227.50 83.00 Cum
formations incl. depositing the unuseful
excavated stuff as and where directed
incl. sorting and stacking useful materials
as directed upto 30 m. lead etc. incl.
(Depth 0 to 3 m.)
(For all type canal & foundation trenches
(A) In over burden incl. Hard Murrum
Earthwork / Back filling with selected 25628.00 141.00 Cum
earth brought from out side borrow area
or from excavated useful material incl.
watering ramming, Compaction with
pneumatic temping and all lead and lift
Dewatering the foundation trenches 3600.00 45.80 Hp/Hr
during excavation of canals, drains,
foundation tranches, concrete, masonary
etc. till completion and diversion of
3 surface and sub surface water by using
pumps of suitable capacity either diesel or
electrical driven including cost of labour,
pipelines etc. for delivery distance
beyond 50 meters.
Supplying and Laying rubble stones 4340.00 464.60 MT
weighing upto 500 kg (class 'C' stones) in
the section of break water or such other
structure as per drawing or as directed
including quarrying, blastings, loading at
4 quarry site, transporting, unloading at
work site and arranging in layer with the
help of crane of required capacity etc.
complete with all labour, machinery,
royalty, quarry lease charges etc.
Providing and laying Non Woven Geo 3875.00 86.40 Sqmt
Fabric Filter over the excavated surface
5 as per specification including stitching
with overlap to design profile as directed
in tidal range etc. complete.
Providing and supplying mechanically
double twisted highly galvanized with
(PVC) Polyvinyl Chloride coating
gabions made of mesh size 10 x 12 cm
woven wire (3.7 mm dia Zn +PVC
coated), tying with lacing wire (3.2 mm
dia Zn+ PVC coated), as per ASTM
A975-97, size of gabion, including
providing and laying stones in the
gabions and arranging them in a required
manner in the section or such other
structure with arranging in required layer
thickness and arranging gabions, with the
crane if required (if required as per
drawings or as directed ) with all material
, labour , tools, lead and lift etc. comp.
(i) 1 m x 1 m x 1 m Size (Stone Weight 5775.00 3417.00 No.
(ii) 1 m x 1 m x 0.3 m Size (Stone Weight 2720.00 1126.00 No.
Providing and Laying in position 66.00 4452.00 Cum
Nominal mix cement concrete using
cement, sand and crushed aggregate by
mass and machine mix for C.C. work
7 incl. necessary form work, centering,
scaffolding, compaction by mechanical
vibrator curing as directed with all lead
and lift etc. complete for general purpose
(E) concrete 1:1.5:3 and msa 20 mm
Total Amount 2,94,04,201.50/-
Total Amount 2,94,04,201.50/-
I/We am/are willing to carry out the work at…...................... %above/below percent (Should
be written in figures and words) of the estimated rate mentioned above Amount of my /our tender
works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item(with Quantity Unit Rate Amount
No brief specification and
reference to book of In In
specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure) ……………………………
(C)Net Tendered Amount(A-B) (in figure) …………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour-cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer, Quality
Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is a change
as per Nominal mix the cost of difference of cement consumption have been deducted from
the rate of original item at the rate of input rate (i.e. 5448.53 Rs / MT for OPC) mentioned in
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Final Canal Embankment DTP Dt.02.03.2026.pdf
Tender Notice 11900 Csy Canal embankment.pdf
BOQ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .