| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.9 LAccepted-Finance ABC OF VIJAYPUR SECTION UNDER EDD BAGESHWAR | L1 | Accepted-Finance Accepted | |
| 2 | L2₹75.4 L+₹1.5 L (2.03%)Rejected-Finance SHEESHMAHAL KATHGODAM ALMORA | L2 | Rejected-Finance Rejected | |
| 3 | L3₹75.7 L+₹1.8 L (2.40%)Rejected-Finance NARSINGH MALLA NEAR FCI GODAM KAMALUAGANJA ROAD HALDWANI NAINITAL | NAINITAL | UTTARAKHAND | 244713 | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | J D M ENTERPRISES L2 | GURUKRIPA ENGINEERS AND CONTRACTORS L1 | G R ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00NON-CENTRALIZED MATERIAL (SUPPLY) | ||||||
| 2.00 | Stay Clamp for SP-23 with Nut & Bolt | 25 | Nos | 249 ₹6,225 | 248 ₹6,200 Lowest | 255 ₹6,375 |
| 3.00 | LT Clamp with N&B ST Pole SP-23 | 400 | Nos | 169 ₹67,600 | 165 ₹66,000 Lowest | 168 ₹67,200 |
| 4.00 | Earth wire clamp for SP-23 with N&B | 100 | Nos | 255 ₹25,500 | 249 ₹24,900 Lowest | 251 ₹25,100 |
| 5.00 | Dead End Clamp for AB Cable | 250 | Nos | 255 ₹63,750 | 253 ₹63,250 Lowest | 253 ₹63,250 Lowest |
| 6.00 | Stay Insulator 75x90 mm | 25 | Nos | 55 ₹1,375 | 53 ₹1,325 Lowest | 56 ₹1,400 |
| 7.00 | Piercing Connector for 95 Sq.mm- 120 Sq.mm | 1,280 | Nos | 170 ₹2,17,600 | 169 ₹2,16,320 | 168 ₹2,15,040 Lowest |
| 8.00 | J Hook for AB Cable | 600 | Nos | 260 ₹1,56,000 | 254 ₹1,52,400 Lowest | 264 ₹1,58,400 |
| 9.00 | PG Clamp | 733 | Nos | 203 ₹1,48,799 | 201 ₹1,47,333 Lowest | 205 ₹1,50,265 |
| 10.00 | LT Distrubution Box 1 Phase | 100 | Nos | 4,100 ₹4,10,000 | 3,996 ₹3,99,600 Lowest | 4,050 ₹4,05,000 |
Tender Value
₹74.0 L
EMD Value
₹1.5 L
Closing Date
11 Aug 2025, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
Replacement of Bare Conductor to AB Cable in different Places of 33/11 KV Chaukhutiya and Ganai feeder under EDD Ranikhet
2025_UPCL9_85241_1
EDC(R)-46/2025-26
Open Tender
Electrical Works
Item Wise
90 days
Ranikhet
As per Tender Documents
2 documents required · 2 mandatory
₹5,900
Executive Engineer
₹1.5 L
12 Dec 2025
30 Jun 2025
13 Aug 2025
30 Jun 2025
11 Aug 2025
30 Jun 2025
Amount
NON-CENTRALIZED MATERIAL (SUPPLY)
Stay Clamp for SP-23 with Nut & Bolt
LT Clamp with N&B ST Pole SP-23
Earth wire clamp for SP-23 with N&B
Dead End Clamp for AB Cable
Stay Insulator 75x90 mm
Piercing Connector for 95 Sq.mm- 120 Sq.mm
J Hook for AB Cable
PG Clamp
LT Distrubution Box 1 Phase
LT Distrubiton Box 3 Phase
MS Half clamp for LT Distribution Box
LABOUR PART (WORK)
Excavation of pit for stay set
Erection of LT stay set
Excavation of pit for Pole
Erection of Single SP-23 Pole
Grouting of Pole
Muffing of Pole
Painting of SP-10 Pole
Painting of SP-21/23 Pole
Cartage SP-21/23 Pole, 100-150 KM
Headload Cartage SP-21/23 pole (1-3 Km)
Headload Cartage of material (1-3 Km)
Installation of LT Dist Box (1P & 3P)
Laying of LT XLPE ABC 3x120 + 1x95 + 1x16 Sq.mm
Disconnection & Reconnection of Consumer
Back Cartage of Petty Material, 100-150 Km
Back Head Load Cartage of Petty Mat. 1-3 Km
Fixing of PG Clamp 70-25 Sq.mm
Grouting of Stay Set
J D M ENTERPRISES (BID ID -391867)
G R ENTERPRISES (BID ID -391825)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .