Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 LAccepted-AOC FLORY NIVAS KADAMKODE CHERUVATHUR PO KASARAGOD 671315 | CHERUVATHUR | KASARAGOD | KERALA | 671315 | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.1 L+₹84,830.95 (4.19%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹26.1 L+₹5.8 L (28.7%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹26.3 L+₹6.1 L (30.1%)Rejected-AOC | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | K.P.JOY L4 | E KRISHNAN L2 | ROY MON K E L3 | ROBERT K J L1 |
|---|---|---|---|---|---|---|---|
| 1.00Protection | |||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 344.75 | cum | 321 ₹1,10,664.75 | 257.63 ₹88,817.94 | 310 ₹1,06,872.5 | 247.27 ₹85,246.33 Lowest |
| 1.00 | 60.47:Unified data for construction of Sea Wall as per Modified Design Suggested by CWPRS Pune - Providing filter of sea wall with woven fabric filter GWF-26-130 weight not less than 130gm/m2 pore size(mm) less than 0.075 with and overlap of 30cm at all joints stitched toghther pulled up in to folds uniformly and sufficiently in both direction for avoiding over extension of fibre of which it is composed and forming the toe to prevent scourage including conveyance and all leads and lifts etc. complete. | 3,014.1 | sqm | 114 ₹3,43,607.4 | 91.76 ₹2,76,573.82 | 110 ₹3,31,551 | 88.07 ₹2,65,451.79 Lowest |
| 1.00 | OD24/2024-2025:Protection against sea erosion by supplying polypropylene non woven Geo textile bags (PET) for 300gms of size size 2mx1m and filling with locally available sea sand filled at site and stitching the same for emergency dumping. Stitching of 3rd side shall be executed at site with required stitching machine or otherwise etc. complete and placed in 6 layers as per drawing and as per the direction of departmental Engineer in charge by mechanical/manual means etc. complete. The cost of supply includes necessary transportation including all stitching charges. | 197 | metre | 11,065 ₹21,79,805 | 8,854.98 ₹17,44,431.06 | 11,000 ₹21,67,000 | 8,498.95 ₹16,74,293.15 Lowest |
Tender Value
₹21.1 L
EMD Value
₹50,000
Closing Date
6 Jun 2026, 6:00 pmClosed
Executive Engineer
Irrigation Division Alappuzha
GENERAL ASE Works Urgent Protection work using Geobag in between CESCP NO 600 to CESCP NO 602 at Kumarakodi in Thrikkunnappuzha Panchayath of Harippad LAC General Civil Work
2026_Irrig_842904_2
IRR/IA/TR/2940/2024_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
Kumaracodi
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
7 Jul 2026
29 May 2026
9 Jun 2026
29 May 2026
6 Jun 2026
29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Protection | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.002 | 60.47:Unified data for construction of Sea Wall as per Modified Design Suggested by CWPRS Pune - Providing filter of sea wall with woven fabric filter GWF-26-130 weight not less than 130gm/m2 pore size(mm) less than 0.075 with and overlap of 30cm at all joints stitched toghther pulled up in to folds uniformly and sufficiently in both direction for avoiding over extension of fibre of which it is composed and forming the toe to prevent scourage including conveyance and all leads and lifts etc. complete. | 1 | sqm | - | - |
| 1.003 | OD24/2024-2025:Protection against sea erosion by supplying polypropylene non woven Geo textile bags (PET) for 300gms of size size 2mx1m and filling with locally available sea sand filled at site and stitching the same for emergency dumping. Stitching of 3rd side shall be executed at site with required stitching machine or otherwise etc. complete and placed in 6 layers as per drawing and as per the direction of departmental Engineer in charge by mechanical/manual means etc. complete. The cost of supply includes necessary transportation including all stitching charges. | - | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1442072.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1442072.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 1.64 MB
NIT.pdf
Tender Documents • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .