Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.0 L+₹11,661.08 (4.10%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.3 L+₹48,156.66 (16.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.4 L+₹53,131.52 (18.7%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹3.4 L+₹54,086.69 (19.0%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.0 L
EMD Value
₹8,000
Closing Date
24 Jul 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW GANDERBAL
EXECUTIVE ENGINEER REW GANDERBAL
Constrution of field channel from graveyard to eidgah at Batwina-A Block Wakura PRI 396
2026_RDPR_316468_39
E NIT No. 33/2026-27 of REW Ganderbal
Open Tender
Civil Works
Percentage
50 days
RDD AND PR
Please refer Tender documents.
3 documents required · 3 mandatory
₹300
Rural Development and Panchayati Raj
₹8,000
30 Jul 2026
17 Jul 2026
25 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labour for clearance of site complete job in all respects | 6 | no | 553 | ₹3,318 |
| 2 | Earthwork in excavation by manual/ mechanical means in trenches for foundations, drains, pipes,cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits, and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of the same as directed in all kinds of soils | 67.7 | cum | 479.3 | ₹32,448.61 |
| 3 | Providing and laying of dry stone soling dully hand packed including watering, dressing, ramming with all carriages, loading, unloading and stacking etc complete | 8.8 | cum | 1,000 | ₹8,800 |
| 4 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:3:6 mix (1cement: 3coarse sand: 6graded stone aggregate with 20mm nominal size) with all carriages, loading, unloading and stacking etc complete job | 36.1 | cum | 5,733.6 | ₹2,06,982.96 |
| 4.1 | 20% plums | 9 | cum | 1,000 | ₹9,000 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.06 | cum | 7,788.4 | ₹16,044.1 |
| 6 | Centring and shuttering including propping, strutting and removal of form work for Foundations, footings, bases for columns | 87.2 | sqm | 268.35 | ₹23,400.12 |
| 7 | Supplying, bending, cutting to shape, fabricating, fixing and tying in position TMT reinforcement steel at alevels and locations | 226.14 | kg | 103 | ₹23,292.42 |
| 8 | 12mm thick cement sand plaster in 1:6 mix | 165.8 | sqm | 266.2 | ₹44,135.96 |
| 9 | Carriage of various materials sand and bajri by MT for an avg. lead of 15 km and HL of 50m complete job | 53.7 | cum | 541.28 | ₹29,066.74 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_1031761.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .