Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 LAccepted-Finance | ₹22.5 L | L1 | Accepted-Finance OK |
| 2 | L1₹22.5 LAccepted-Finance | ₹22.5 L | L1 | Accepted-Finance OK |
| 3 | L1₹22.5 LAccepted-Finance | ₹22.5 L | L1 | Accepted-Finance OK |
Tender Value
₹22.5 L
EMD Value
₹22,600
Closing Date
9 Jun 2026, 5:00 pmClosed
BDO, GURUNDIA
AT/PO- GURUNDIA DIST. SUNDARGARH PIN-770043
Construction of MPCC Buidling at Sanburda, Jarda GP
2026_PRGU_129595_1
01/2026-27 GURUNDIA
Open Tender
Civil Works - Buildings
Percentage
180 days
JARDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹22,600
Yes
4 Jul 2026
26 May 2026
10 Jun 2026
26 May 2026
9 Jun 2026
26 May 2026
26 May 2026 - 9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Ground Floor | |||||
| 2 | Earth work in excavation of foundation inhard soilwithin intial lead of 50m.and 1.5m.intial lift including rough dressing and leveling the bed as directed by the Engineer-in-charge. | 48.2 | cum | 276.9 | ₹13,346.58 |
| 3 | Filling in Foundation and plinth with sand well watered and rammed including cost carriage and royality of materials etc. complete as per the direction Engineer-in-charge | 46.5 | cum | 1,100.6 | ₹51,177.9 |
| 4 | Cement Concrete (1:3:6)with 4cm .. Size H.G.C.B metal including cost ,carriage & royalityof materials etc complete as per the direction Engineer-in-charge | 11.6 | cum | 6,642 | ₹77,047.2 |
| 5 | Brick masonary work with Fly Ash bricks(23CM*11CM*8CM) size in cement mortar(1:6) F&P including cost , carriage and royality of materials etc. complete as per the direction Engineer-in-charge. | 11.4 | cum | 5,882.5 | ₹67,060.5 |
| 6Brick masonary work with Fly Ash bricks(23*CM*11CM*8CM) size in cement mortar(1:6) super structure including cost , carriage and royality of materials etc. complete as per the direction Engineer-in-charge. | |||||
| 6.01 | GROUND FLOOR | 20.2 | cum | 5,915.8 | ₹1,19,499.16 |
| 6.02 | First floor | 17.4 | cum | 6,294.2 | ₹1,09,519.08 |
| 6.03 | Second floor | 7.6 | cum | 6,729.3 | ₹51,142.68 |
| 7 | Brick masonary work with Fly Ash bricks(23*CM*11CM*8CM) size in cement mortar(1:4) super structure including cost , carriage and royality of materials etc. complete as per the direction Engineer-in-charge. | 1.7 | cum | 6,122 | ₹10,407.4 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_592133.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_592133.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].