Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹13.2 L+₹8,885.19 (0.68%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹13.3 L+₹9,813.49 (0.75%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹13.3 L
EMD Value
₹1.3 L
Closing Date
4 Jul 2026, 2:00 pmClosed
EO
Nagar Panchayat Neoria Husainpur
Nala Nirman works from mofmohammad zafar residence to gulshane Fatima School .
2026_DOLBU_1163855_1
NPNH/NALA/2026-08
Open Tender
Civil Works
Percentage
60 days
Nagar Panchayat Neoria Husainpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,564
Executive Officer
₹1.3 L
Yes
21 Jul 2026
25 Jun 2026
4 Jul 2026
25 Jun 2026
4 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Nala Nirman works gulshane Fatima School to Mohammad Shazar | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 94.08 | Cum | 189 | ₹17,781.12 |
| 1.02 | Cartage of eath Malwa 3 km 55% | 51.74 | Cum | 199 | ₹10,296.26 |
| 1.03 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete | 13.44 | Cum | 1,546.3 | ₹20,782.27 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) 10 graded stone aggregate 40 mm nominal size | 20.16 | Cum | 4,746.3 | ₹95,685.41 |
| 2.01 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources | 69.83 | sqm | 7,902.3 | ₹5,51,817.61 |
| 2.02 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.1 Mild steel and Medium Tensile steel bars | 54.82 | qty | 7,798 | ₹4,27,486.36 |
| 3 | GST 18 % | 1 | GST | 2,02,298 | ₹2,02,298 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.15 MB
BOQ_2181995.xls
BOQ • 0.37 MB
corrigendumnala.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .