Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹55.5 L
EMD Value
₹1.4 L
Closing Date
23 Oct 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Karnataka Power Corporation Limited
Dileep kumar Nayak
Comprehensive maintenance of centralized AC systems of Units 1 to 4 , 400KV ODY control room, Package AC Units at service station building, Package AC Units ESP 1,2 &3, Air washer cum Ventilation System of Unit 1 to 4, various type Split/ tower/window ACs/Cassette AC and water coolers in plant and colony layout through Annual Maintenance Contract at RTPS
KPCL/2026-27/EL/WORK_INDENT4889
KPCL/2026-27/EL/WORK_INDENT4889
Open
Electrical
Two Tender Document System(Two Cover)
KPCL Executive Engineer LT1 Office RTPS Raichur
8 documents required · 4 mandatory · 4 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
The intending bidder should have satisfactorily completed as a prime contractor, at least one similar work such as AMC of operation & maintenance of centralized AC systems of value not less than Rs. 27.8 Lakhs(excluding GST) in the last proceeding five Financial years (i.e 2021-22, 2022-23, 2023-24, 2024-25 and 2025-26).As a proof of this, the bidder should upload a single work order and corresponding work done certificate issued by the Competent Authority (Work done of previous years shall be given weight at 10% per year to bring them to the present price level of the financial year).
The Intending Bidder should be a Manufacturer / service provider of HVAC systems, who have carried out operation & maintenance of centralized AC systems. As a proof of this, the bidder shall furnish a copy of relevant document
The intending bidder in his name should have achieved an average annual financial turnover of Rs. 55.50 Lakhs in at least two financial years during the last five Financial years (i.e., 2021-22, 2022-23, 2023-24,2024-25 and 2025-26).As a proof of this, the bidder shall upload the certified copy of the Profit and Loss account or turnover certificate duly certified by the chartered Accountant. (Financial turnover of previous years shall be given weight of 10% per year to bring them to the present price level of financial year).
₹1,390
₹1.4 L
6 Oct 2026
6 Oct 2026
24 Oct 2026
17 Oct 2026
Comprehensive maintenance of centralized AC systems of Units 1 to 4 , 400KV ODY control room, Package AC Units at service station building, Package AC Units ESP 1,2 &3, Air washer cum Ventilation System of Unit 1 to 4, various type Split/ tower/window ACs/Cassette AC and water coolers in plant and colony layout through Annual Maintenance Contract at RTPS
Routine and Preventive maintenance of centralized AC systems of Unit-1&2 with all auxiliaries as per scope of work. (Optional)
Comprehensive maintenance charges for ACCEL make AC 4-100 compressors with 3 No’s(Unit-3) 180TR as per scope of work.
Overhauling charges for both spares and service of 60.0 TR ACCEL make reciprocating compressor of Unit 3 AC system as per scope of work.
Routine and Preventive maintenance of centralized AC systems of Unit-3&4 with all auxiliaries as per scope of work. (Optional)
Comprehensive maintenance charges for Voltas make AC compressors model: 5h66 Chiller system with all auxiliaries 60TR X 3 No’s(Unit-4 UCB and ESP) 180 TR as per scope of work.
Overhauling charges for both spares and service of 60.0TR VOLTAS Make reciprocating compressor of Unit 4 AC system as per scope of work.
Routine and Preventive maintenance of centralized AC systems at 400kV control Room with all auxiliaries as per scope of work. (Optional)
Comprehensive maintenance charges for ACCEL make AC 8-60 compressors with all auxiliaries.DX system 30 TR X 3 no’s (400kV ODY) 90 TR as per scope of work.
Overhauling charges -for both spares and service, of 30.0 TR ACCEL make Reciprocating compressor of 400kV ODY AC system as per scope of work.
Comprehensive maintenance charges FOR package AC system 3.5 TR X 2 NO’S X 3 UNITS (ESP-3).21 TR as per scope of work.
Comprehensive maintenance charges for package AC system (kirloskar Copeland) with all auxiliaries. DX system 7.5 TR X 6 No’s(ESP-1 & ESP-2) 45.0 TR as per scope of work.
Comprehensive maintainance charges for assorted make Split/Tower/Window/Cassette Acs(Approx. 495 TR) as per scope of work.
Service charges for operation of AC plants for three shifts as per scope of work.
Routine and Preventive maintenance of of Air washer system of Unit-1 to 4 as per scope of work.
Routine and Preventive maintenance of roof extractor fans and exhaust fans of Units-1,2,3&4 as per scope of work.
Supervision of all works by Plant Incharge
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
AC AMC Tender Document final.doc
Tender Document • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .