Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC | L1 | Accepted-AOC Accepted,BeingL-1 | |
| 2 | L2₹6.2 L+₹6,205.91 (1.01%)Rejected-Finance | L2 | Rejected-Finance Rejected,BeingL-2 | |
| 3 | L3₹8.3 L+₹2.2 L (35.0%)Rejected-Finance | L3 | Rejected-Finance Rejected,BeingL-3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Being Non Responsive |
| Sl No | Description | Qty | Unit | FEROZ KHAN CONRACTOR L2 | RAHUL KUMAR MOURYA L3 | M/S TANISHAQ ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling old damaged existing plaster including disposal of refuse with in distance of 60 m. complete. | 109.6 | Sqm. | 47.5 ₹5,206 | 48 ₹5,260.8 | 47 ₹5,151.2 Lowest |
| 2.00 | Cement plaster in 1:4 (1cement:4coarse sand) mortar including cost of all materials , labour and T&P etc. required for proper completion of work. | 109.6 | Sqm. | 205.58 ₹22,531.57 Lowest | 208 ₹22,796.8 | 205.6 ₹22,533.76 |
| 3.00 | Providing and applying plaster of Paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete including cost of all materials, labour and T&P etc. required for proper completion of work. | 2,334.9 | Sqm. | 109.26 ₹2,55,111.17 | 111 ₹2,59,173.9 | 108 ₹2,52,169.2 Lowest |
| 4.00 | Finishing walls with Acrylic smooth exterior paint two coat of approved make of required shade on old surface by engineer-in-charge to give even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered material including cost of all materials, labour and T&P etc. required for proper completion of work . | 963 | Sqm. | 167.77 ₹1,61,562.51 | 170 ₹1,63,710 | 166 ₹1,59,858 Lowest |
| 5.00 | Distempering Two coats with oil bound distemper of approved brand & manufacture and of required shade on under coated wall surface to give an even shade over an including a priming coat cement primer of approved brand and manufacture such as Burger, J&N Shalimar, Asian etc. after thoroughly brushing the surface free mortar drooping and other foreign matters and also including preparing the surface even with plaster of Paris or approved synthetic material and sand papered smooth including cost of material, labour and T&P etc. required for proper completion of work. | 1,371.8 | Sqm. | 114.95 ₹1,57,688.41 | 117 ₹1,60,500.6 | 114 ₹1,56,385.2 Lowest |
| 6.00 | Painting two coats on wood surface including cleaning the surface of all dirt, dust and other foreign matter, sand papering and stopping i/c. cost of all materials, labour, T&P etc. required for proper completion of work. | 185.1 | Sqm. | 112.1 ₹20,749.71 | 112 ₹20,731.2 | 111 ₹20,546.1 Lowest |
Tender Value
₹6.6 L
EMD Value
₹14,000
Closing Date
17 Sept 2025, 11:00 amClosed
Executive Engineer ,Head works Division, Sarda can
Executive Engineer, Head works Division, Sarda canal Bareilly.
Adhishasi abhiyanta Aawas Avm Camp karyalay 77-Cant Canal colony, bareilly ki Marmmart Avm Rangai Putai ke Karan.
2025_UPIDC_1067624_2
E-Tender Notice No 03/EE/2025-26
Open Tender
Civil Works
Item Rate
45 days
Barelly
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹14,000
Yes
30 Oct 2025
9 Sept 2025
17 Sept 2025
9 Sept 2025
17 Sept 2025
9 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .