| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.5 L+₹11,890.87 (4.94%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹5,940
Closing Date
28 Jul 2026, 6:00 pmClosed
EXEN REW BARAMULLA
BARAMULLA
C/o Road from main road to health centre C/o one no. ghat at Al-Qayam Library at KP Payeen A.Under ADP-PRI Plan for fy 2026-27,halqa kp Payeen A, Block Singhpora.
2026_RDPR_315735_4
99/Xen/Rew/Bla/2026-27 Dated 13/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXEN REW BARAMULLA
₹5,940
Yes
29 Jul 2026
13 Jul 2026
29 Jul 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | - | sqm | 24.12 | - |
| 2 | Earth work in excavation by Manual means for foundation in trenches including dressing of sides, ramming of bottom & disposal of excavated soil up to an avg. lead of 50 Mtrs & lift up to 1.5 Mtrs Directed:all kinds of soil | - | Cum | 479.3 | - |
| 3 | Providing and laying of Nallah muck/Stone soling on road incl carriages of material with an average lead of 27 km M.T from source to site of work complete . | - | Cum | 1,250 | - |
| 4 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) | - | Cum | 5,202.9 | - |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) drain slab | - | Cum | 7,788 | - |
| 6 | Steel reinforcement for R.C.C. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete above plinth level. | - | kgs | 115.35 | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, pillars, piers, abutments, posts and strutsetc. | - | Sqm | 742.55 | - |
| 8 | P/Fixinng vitrified tilles of standard quality Wall Tiles complete job | - | Sqm | 1,395.35 | - |
| 9 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 360 | kgs | 138.2 | ₹49,752 |
| 10 | 12mm thick plaster in Cement Mortar 1:6 mix. | - | Sqm | 266.2 | - |
stage.html
html • 0.02 MB
finance_1025637.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_1025637.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .