Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.6 LAdmitted-Finance | -33.00% | ₹15.6 L | L1 | Admitted-Finance |
| 2 | L2₹15.8 L+₹23,252.92 (1.49%)Admitted-Finance | -32.00% | ₹15.8 L+₹23,252.92 (1.49%) | L2 | Admitted-Finance |
| 3 | L3₹16.1 L+₹54,644.36 (3.51%)Admitted-Finance | -30.65% | ₹16.1 L+₹54,644.36 (3.51%) | L3 | Admitted-Finance |
| 4 | L4₹16.7 L+₹1.1 L (7.31%)Admitted-Finance | -28.10% | ₹16.7 L+₹1.1 L (7.31%) | L4 | Admitted-Finance |
| 5 | L5₹17.1 L+₹1.5 L (9.82%)Admitted-Finance | -26.42% | ₹17.1 L+₹1.5 L (9.82%) | L5 | Admitted-Finance |
Tender Value
₹23.3 L
EMD Value
₹46,500
Closing Date
3 Aug 2026, 1:00 pmClosed
xen headquarter
jda jodhpur
maintenance work of green space for 01 year at marwar international centre(annual contract 2026-27)
2026_JDAJO_576221_1
JoDA/Nit-19/HQ/2026-27
Open Tender
Civil Works
Percentage
365 days
jda jodhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
secretary jda jodhpur and md risl jaipur
₹46,500
Yes
4 Aug 2026
21 Jul 2026
3 Aug 2026
21 Jul 2026
3 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of lawn Irrigation of lawn | 288 | Per hect. Per day | 1,440 | ₹4,14,720 |
| 2 | Moving manually / with power machines with power machine | 87 | Per Hect | 1,200 | ₹1,04,400 |
| 3 | Uprooting weeds from the lawn plots and trenched area after 10 to 15 days of its flooding with including disposal of uprooted vegetation. | 2,88,000 | 100 Sqm. | 240 | ₹6,91,20,000 |
| 4 | Prunning & trumming and cutting of old big trees on the road side The contractor will deposit the cut wood in the Deptt. | 150 | Per Tree | 120 | ₹18,000 |
| 5 | Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc.Good soil of earth | 300 | Cum. | 240 | ₹72,000 |
| 6 | Supply of dry manure including loading unloading,transportation & stacking at site. Vermi compost | 100 | Per 50 kg Bag | 250 | ₹25,000 |
| 7 | Supply of dry manure including loading unloading,transportation & stacking at site.Goat dungmanure. | 25 | Cum. | 1,200 | ₹30,000 |
| 8 | Spreading of manure , good earth in required thickness (cost of manure and good earth to be separately ) | 325 | Cum. | 24 | ₹7,800 |
| 9 | Mixing earth and manure in per portion as specified or directed for pots | 325 | Cum. | 42 | ₹13,650 |
| 10 | Supply of Chemical Fertilizers at store in bags weighing not less than 50 kg each including loading unloading & transportation Urea | 150 | Per 50 Kg. Bag | 400 | ₹60,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
maintenancework.pdf
Tender Documents • 1.58 MB
BOQ_1024491.xls
BOQ • 0.30 MB
corrigendumhq.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .