| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | Rejected-Technical | - | Rejected-Technical REJECT |
Tender Value
₹13.1 L
EMD Value
₹32,723
Closing Date
27 Feb 2024, 1:00 pmClosed
Executive Engineer PWD NH Division Kozhikode
PWD NH Division Kozhikode Mananchira
GENERAL-Pre monsoon Work 2024-25 - Clearing drain and culverts cutting and removing branches of trees vegetation on Old NH 766 0-000 5-000 Old Nh 17 and NH 966- General Civil Work
2024_PWD_661782_1
PWD/NH/TR/1118/2024_5_1_1/1
Open Tender
Civil Works - Highways
Item Rate
180 days
mananchira
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹32,723
Yes
15 Mar 2024
21 Feb 2024
29 Feb 2024
21 Feb 2024
27 Feb 2024
21 Feb 2024
Amount
Pre Monsoon works
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD216676/2023-2024:Lifting and removing the RCC slab over drain by engaging heavy load mazdoor and stacking conveniently for reuse and replacing the slab in the same position after clearing the drain
3.1:Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.
3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.7.2:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.09 mm (Type-B) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade, and level to serve as wearing course on a previously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to the required level and grade.
OD217386/2023-2024:engaging wood cutter for cutting branches of trees in smaller pieces for stacking without hindrance to traffic in convenient place along road side
OD217387/2023-2024:engaging man mazdoor for picking up and stacking the logs and for controlling traffic during tree cutting
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
P.P.NOUSHAD ALI
Bidder Name
P.P.NOUSHAD ALI
k v john
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1025524.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .