Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
9 Oct 2026, 6:00 pm
Executive Engineer Junagadh Irrigation Project Division junagadh
Yearly Unit Rates Of Composite Items For Maintenance And Repairs Works Of Irrigation Schemes Under Jurisdiction of Junagadh Irrigation Project Division, Junagadh For The Year 2026-2027
348075
Online E-Tender Notice No. 4 of 2026-27
Open
Civil - All
Works
Junagadh
6 documents required · 6 mandatory
₹900
executive engineer junagadh irrigation project division, junagadh
₹15,000
25 Sept 2026
25 Sept 2026
25 Sept 2026
9 Oct 2026
25 Sept 2026
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
1 Clearing the seat of earthen dam including seat of spillway and HR including removing 1.00 Hac.
the trees, shrubs, bushes etc and depositing the materials outside the seat of dam
beyond 50mt from the toe line and upto 200mt lead as directed.
2 Stripping the seat of dam in all sorts of soils including soft murrum and hard 1.00 Cum.
murrum,and including depositing the materials as & where directed for dam seat &
inspection road etc with lead upto 1.0km and all lifts etc complete.
3 Excavation in all sort of strata and formations including depositing the unuseful 1.00 Cum.
excavated stuff as and where directed includingsorting and stacking useful materials in
measurable conditions as directed upto 200mt lead and all lift etc. complete including
dewatering. (A) IN OVERBURDEN including HARD MURRUM.
4 Excavation in all sort of strata and formations including depositing the unuseful 1.00 Cum.
excavated stuff as and where directed includingsorting and stacking useful materials in
measurable conditions as directed upto 200mt lead and all lift etc. complete including
dewatering.(B) IN SOFT ROCK.
5 Excavation in all sort of strata and formations including depositing the unuseful 1.00 Cum.
excavated stuff as and where directed includingsorting and stacking useful materials in
measurable conditions as directed upto 200mt lead and all lift etc. complete including
dewatering. (C) IN HARD ROCK.
6 Excavation in all sort of strata and formations including depositingthe unuseful 1.00 Cum.
excavated stuff as and where directed includingsorting and stacking useful materials in
measurable conditions as directed upto 200mt lead and all lift etc. complete including
dewatering. (D) IN BHAT ROCK.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
7 Transporting including rehandling and spreading of the useful excavated materials of 1.00 Cum.
C.O.T.,Spillway foundation, Approach channel, Tail channel,HR,inspection road,approch
road, etc for embankment raising including spreading in uniform layers of specified
thickness, dressing, breaking clods & rolling at requisite moisture content to required
dry density with suitable type of roller and watering at OMC for lead upto 1.0 km and
all lift etc complete.
8 Quaring,transporting & spreading selected materials from borrow area for raising of 1.00 Cum.
embankment work in homogeneous section in uniform layers of specified thickness
(up to 23cm) as directed including dressing breaking clods and rolling at requisite
moisture contents to required dry density with roller of suitable type and watering at
OMC for lead upto 1.0 km and all lifts etc complete.
9 Quaring,transporting & spreading selected materials from borrow area for raising of 1.00 Cum.
embankment work in casing zone section in uniform layers of specified thickness (up
to 23cm)as directed includingdressing breaking clods and rolling at requisite moisture
contents to required dry density with roller of suitable type and watering at OMC for
lead upto 1.0 km and all lifts etc complete.
10 Quaring,transporting & spreading selected materials from borrow area for raising of 1.00 Cum.
embankment work in filling of COT and hearting zone in uniform layers of specified
thickness(up to 23cm) as directed including dressing breaking clods and rolling at
requisite moisture contents to required dry density with roller of suitable type and
watering at OMC for lead upto 1.0 km and all lifts etc complete.
11 Extra lead charges for transporting the borrow area/excavated usable materials for 1.00 Km/ Cum.
earthen dam beyond the basic lead of 1.0 km and up to 5.0 km for each additional Km
or part there of inclusive of all lift etc. complete.
12 Quarring,trasporting & laying horizontal and inclind sand filter of required gradation 1.00 Cum.
in earthen dam in layers of specified thickness includingrequired watering, light rolling
for all lead and lift etc complete.
13 Compaction of embankment work at requisite moisture content to the required dry 1.00 Cum.
density using rollers of suitable type at OMC standard inclusive of necessary spreading,
dressing, rolling as directed with all lead and lifts etc complete.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
14 Watering charges for consolidation at OMC inclusive of all cost of materials and labour 1.00 Cum.
with all lead and lifts etc complete.
15 Providing and laying dry rubble pitching with 20 cms gravel/metal and 20 cms sand 1.00 Sq. Mt.
layers as base of inverted graded filter with providing and fixing precast conc. M-15
header stone,hand packing,trimming & dressing ofslopes etc complete. (a) 30 cms
thick stone pitching (H.S.size 15x15x45cm)
16 Providing and laying dry rubble pitching with 20 cms gravel/metal and 20 cms sand 1.00 Sq. Mt.
layers as base of inverted graded filter with providing and fixing precast conc. M-15
header stone,hand packing,trimming & dressing ofslopes etc complete. (b) 45 cms
thick stone pitching (H.S.size 15x15x60cm)
17 Providing and laying dry rubble pitching with 20 cms gravel/metal and 20 cms sand 1.00 Sq. Mt.
layers as base of inverted graded filter with providing and fixing precast conc. M-15
header stone,hand packing,trimming & dressing ofslopes etc complete. (c) 60 cms
thick stone pitching (H.S.size 15x15x60cm)
18 Providing and laying dry rubble pitching with 20 cms gravel/metal and 20 cms sand 1.00 Sq. Mt.
layers as base of inverted graded filter and without headers stone but including hand
packing trimming and dressing of slopes etc. complete (a) 30 cms thick stone pitching.
19 Providing and laying dry rubble pitching with 20 cms gravel/metal and 20 cms sand 1.00 Sq. Mt.
layers as base of inverted graded filter and without headers stone but including hand
packing trimming and dressing of slopes etc. complete (b) 45 cms thick stone pitching.
20 Providing and laying dry rubble pitching with 20 cms gravel/metal and 20 cms sand 1.00 Sq. Mt.
layers as base of inverted graded filter and without headers stone but including hand
packing trimming and dressing of slopes etc. complete (c) 60 cms thick stone pitching.
21 Providing and laying dry rubble stone pitching without base, inverted filter and header 1.00 Sq. Mt.
stone but with 10 cms thick murrum layer (for base) including hand packing &
trimming & dressing slopes etc complete (a) 15 cm thick stone pitching.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
22 Providing and laying dry rubble stone pitching without base, inverted filter and header 1.00 Sq. Mt.
stone but with 10 cms thick murrum layer (for base) including hand packing &
trimming & dressing slopes etc complete (b) 23 cm thick stone pitching.
23 Providing and laying dry rubble stone pitching without base, inverted filter/murrum 1.00 Sq. Mt.
bedding and header stone including hand packing & trimming & dressing slopes etc
complete (a) 15 cm thick stone pitching.
24 Providing and laying dry rubble stone pitching without base, inverted filter/murrum 1.00 Sq. Mt.
bedding and header stone including hand packing & trimming & dressing slopes etc
complete (b) 23 cm thick stone pitching.
25 Providing and laying dry rubble stone pucca pitching without base, inverted filter and 1.00 Sq. Mt.
header stone but with 10 cms. thick murrum layer (for base) including hand packing
and trimming & dressing slopes etc complete (a) 15 cms thick stone pitching with
pointing in C.M. 1:2.
26 Providing and laying dry rubble stone pucca pitching without base, inverted filter and 1.00 Sq. Mt.
header stone but with 10 cms. thick murrum layer (for base) including hand packing
and trimming & dressing slopes etc complete (b) 23 cm thick stone pitching with
pointing in C.M. 1:2 .
27 Providing and laying dry rubble stone pucca pitching without base, inverted filter and 1.00 Sq. Mt.
header stone but with 10 cms. thick murrum layer (for base) including hand packing
and trimming and dressing slopes etc complete (c) 30 cm thick stone pitching with
pointing in C.M. 1:2.
28 Providing and laying CAGE stone pitching with mechanically double twisted galvanized 1.00 Sq. Mt.
wire mesh size not more than 75x75 mm and woven wire without base of inverted
filter and header stone but with 10 cms thick murrum bedding including hand packing
and trimming & dressing slopes etc. (a) 45 cm thick pitching
29 Providing and laying CAGE stone pitching with mechanically double twisted galvanized 1.00 Sq. Mt.
wire mesh size not more than 75x75 mm and woven wire without base of inverted
filter and header stone but with 10 cms thick murrum bedding including hand packing
and trimming & dressing slopes etc. (b) 60 cm thick pitching
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
30 Providing & laying dry rubble stone pucca pitching with panel (of size not more than 1.00 Sq. Mt.
10Sq. Mt. ) of stone masonry 45cm thick wall in C.M. 1:5, without base , inverted filter
and header stone but with 10 cms thick murrum layer (for base ) incl hand packing
and trimming and dressing slopes etc. (a) 45 cms thick stone pitching with pointing in
31 Providing & laying dry rubble stone pucca pitching with panel (of size not more than 1.00 Sq. Mt.
10Sq. Mt. ) of stone masonry 45cm thick wall in C.M. 1:5, without base , inverted filter
and header stone but with 10 cms thick murrum layer (for base ) incl hand packing
and trimming and dressing slopes etc. (B) 30 cms thick stone pitching with pointing in
32 Providing & laying dry rubble stone pucca pitching with panel (of size not more than 1.00 Sq. Mt.
10Sq. Mt. ) of stone masonry 45cm thick wall in C.M. 1:5, without base , inverted filter
and header stone but with 10 cms thick murrum layer (for base ) incl hand packing
and trimming and dressing slopes etc. (c) 23 cms thick stone pitching with pointing in
33 Providing and laying 60cm dia half round cement pipe for catch water drain and chute 1.00 Rmt.
drain on berms and down stream slopes of earthen dam incl necessary excavation and
back filling etc complete.
34 Providing and laying longitudinal open surface drain and gutter on top of earthen dam 1.00 Rmt.
incl excavation,P.C.C.M-15 bed concrete,brick masonry in C.M. 1:6,12 MM thick plaster
in C.M. 1:3 with necessary pipe and kerbing etc complete with curing
and all lead and lift.
35 Providing and laying plastered brick masonry for longitudinal collecting drain and 1.00 Rmt.
catch water drains with side slope of 1:1 on d/s side of earthen dam etc complete as
per drawing and design.
36 Providing and laying RCC NP-2 Pipe for chute on rear slope incl excavation and back 1.00 Rmt.
filling,jointing prior with collars,curing etc complete in C.M. 1:1 (a) 225mm dia pipe
37 Providing and laying RCC NP-2 Pipe for chute on rear slope incl excavation and back 1.00 Rmt.
filling,jointing prior with collars,curing etc complete in C.M. 1:1 (b) 300mm dia pipe
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
38 Providing and laying RCC NP-2 Pipe for chute on rear slope incl excavation and back 1.00 Rmt.
filling,jointing prior with collars,curing etc complete in C.M. 1:1 (c) 450mm dia pipe
39 Providing and constructing 23 cm thick brick masonry KUNDIS' of size 70x70x90 cms 1.00 No.
at the junction of chute pipe and catch water drains in C.M.1:5 with 12mm thick plaster
in C.M. 1:3 on both side incl excavation ,back filling finishing etc complete.
40 Quarring,transporting and laying rock fill for ROCK TOE using hard stone in layers 1.00 Cum.
directed including graded filter,necessary hand packing of stones for adjusting sides to
correct design slopes etc using light hammer driven wedges between rubble on
exposed face for all lead and all lifts etc comp.
41 Providing buried toe drain below rock toe or out side the d/s toe as per design and 1.00 Rmt.
drawing with excavation of drain in all sort of soil incl hard strata and depositing the
excavated material as directed with all lead, dressing the slopes, laying filter layer as
per drawing, laying open jointed 300 mm dia RCC NP-2 class Hume pipe and laying
rubble stones etc complete as per drawing.
42 Providing and laying open toe drain as per drawing, out side and adjoining d/s toe of 1.00 Rmt.
earthen dam with 30cm thick stone pitching with graded filter etc complete with
excavation of drain in all sort of strata incl hard strata and disposing the excavated
material as directed with all lead & lift.
43 Providing 1.0 (one ) meter wide steps in brick masonry in c.m. 1:5 on earthen dam as 1.00 Rmt.
per drawing with all lead and lift.
44 Providing 1.0 (one ) meter wide steps in on rip rap with Trade 30cm, 15cm rise in 1.00 Rmt.
brick masonry in C.M.1:5 with 23cm wide Parapet on both the side incl 10mm thick
plaster in C.M. 1:3 on expose faces incl 10cm thick foundation concrete M-10, as per
drawing with all lead and lift.
45 Dewatering for earthen dam and allied works, foundation areas,pits,trenches etc incl 1.00 HP-Hrs.
cost of pumping machineries, pipe lines,labours diesel/electricity/DG set, etc complete.
46 Cleaning the bed of C.O.T for foundation mapping,with air and water jet incl removal of 1.00 Sq. Mt.
all loose materials/debris etc complete.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
47 Providing and constructing MANHOLE as per drawing in brick masonry in C.M.1:3 1.00 No.
includingrequired C.I. frame with cover,foot steps of 16mm dia.M.S. bar,NP-2class
cement pipe of dia.300 mm of required length for inlet and outlet,back filling with
selected material incl jointing the pipes in C.M 1:1 etc complete with bedding
concrete,coping and 12mm thick plaster.
48 Providing and fixing gauge post with M.S.Channel of size 150x75x5mm of required 1.00 Rmt.
length as per design with necessary foundation and with painted enameled plate and
fixing it on MS channel etc complete with necessary oil paint.
49 Providing turfing to the D/S slope of earthen dam with necessary selected soil 1.00 Sq. Mt.
covering, bio-organic manure, watering etc. complete.
50 Providing and laying longitudinal open surface drain of size 0.3x0.45mt(inside) on top 1.00 Rmt.
of earthen dam with RCC M-15(MSA- 20mm) concrete including excavation, bottom
slab of thickness 15 cms,inside wall of thickness 23cms and outer wall of 15 cm
thickness with reinforcement and outlet RCC pipe of dia 225mm of length 30cms at
every 90mt c/c etc complete with curing finishing & back filling with compaction and
all lead and lift.( As per drawing )
51 Providing and laying RCC M-15 (MSA-20mm) for longitudinal collecting drain and 1.00 Rmt.
catch water drains with bottom slab & side walls of thickness 15cms and with
necessary reinforcement on d/s side of earthen dam etc complete as per drawing and
52 Re-handling the excavated stuff inlcuding stacking as and where directed for all sort of 1.00 Cum
soil, soft murrum, hard murrum, soft rock, hard rock etc. for specified lead as under &
all lift including loading unloading transportation etc complete without rolling and
watering. (a) Lead up to 200 Mt..
53 Re-handling the excavated stuff including stacking as and where directed for all sort of 1.00 Cum
soil, soft murrum, hard murrum, soft rock, hard rock etc. for specified lead as under &
all lift including loading unloading transportation etc complete without rolling and
watering. (b) Lead 200 Mt. to 500 Mt..
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
54 Re-handling the excavated stuff including stacking as and where directed for all sort of 1.00 Cum
soil, soft murrum, hard murrum, soft rock, hard rock etc. for specified lead as under &
all lift including loading unloading transportation etc complete without rolling and
watering. (c) Lead 500 mt to 1 Km.
55 Earthwork / Back filling with selected earth brought from out side borrow area or 1.00 Cum.
from excavated useful material including watering ramming, Compaction with
pneumatic temping and all lead and lift etc complete.
56 Preparation of spillway and allied works foundations including removal of loose 1.00 Sq. Mt.
weathered material including hard rock by wedging, chiseling with all labours,tools
and materials for cleaning the foundations with compressed air and water jetting as
required etc complete.
57 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks ,compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel . For foundation concrete. (A) Concrete grade M-10 and MSA-40mm
58 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks ,compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel . For foundation concrete. (B) Concrete grade M-10 and MSA-80mm
59 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks ,compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel . For foundation concrete. (C) Concrete grade M-15 and MSA-40mm
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
60 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks ,compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel . For foundation concrete. (D) Concrete grade M-15 and MSA-80mm
61 Prov.& Laying in position controlled cement concrete using cement sand & gravel by 1.00 Cum.
machine mix for PCC including necessary formworks, compaction, ramming ,curing as
directed with all lead and lift etc complete. For foundation concrete / other general
purpose (A) Concrete grade M-10 and MSA- 63mm (Graded)
62 Prov.& Laying in position controlled cement concrete using cement sand & gravel by 1.00 Cum.
machine mix for PCC including necessary formworks, compaction, ramming ,curing as
directed with all lead and lift etc complete. For foundation concrete / other general
purpose (B) Concrete grade M-15 and MSA- 63mm (Graded)
63 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks, compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. training wall, side wall and general purpose. (A) Concrete grade M-15
and MSA-40mm (Graded)
64 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks, compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. training wall, side wall and general purpose. (B) Concrete grade M-15
and MSA-80mm (Graded)
65 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks, compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. training wall, side wall and general purpose. (C) Concrete grade M-20
and MSA-40mm (Graded)
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
66 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks, compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. training wall, side wall and general purpose. (D) Concrete grade M-20
and MSA-80mm (Graded)
67 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (i) For bucket and end sill etc (a) Concrete grade M-20 and MSA-
68 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (i) For bucket and end sill etc (b) Concrete grade M-20 and MSA-
69 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (i) For bucket and end sill etc (c) Concrete grade M-25 and MSA-
70 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (i) For bucket and end sill etc (d) Concrete grade M-25 and MSA-
71 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (ii) For ogee crest, u/s and d/s face skin concrete. (e) Concrete grade
M-20 and MSA-40mm(Graded)
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
72 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (ii) For ogee crest, u/s and d/s face skin concrete. (f) Concrete grade
M-20 and MSA-80mm(Graded)
73 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (ii) For ogee crest, u/s and d/s face skin concrete. (g) Concrete grade
M-25 and MSA-40mm(Graded)
74 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (ii) For ogee crest, u/s and d/s face skin concrete. (h) Concrete grade
M-25 and MSA-80mm(Graded)
75 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (iii) For pier concrete (I) Concrete grade M-20 and MSA-
76 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (iii) For pier concrete (J) Concrete grade M-20 and MSA-
77 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (iii) For pier concrete (K) Concrete grade M-25 and MSA-
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
78 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (iii) For pier concrete (L) Concrete grade M-25 and MSA-
79 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (iv) For conduits & gallaries,shafts and similar works (M) Concrete
grade M-20 and MSA-20mm(Graded)
80 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (iv) For conduits & gallaries,shafts and similar works (N) Concrete
grade M-20 and MSA-40mm(Graded)
81 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (iv) For conduits & gallaries,shafts and similar works (O) Concrete
grade M-25 and MSA-20mm(Graded)
82 Providing & Laying in position controlled cement concrete using cement sand & 1.00 Cum.
crushed metal aggregate by machine mix including necessary formworks compaction
by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding
the cost of steel. (iv) For conduits & gallaries,shafts and similar works (P) Concrete
grade M-25 and MSA-40mm(Graded)
83 Providing & Laying in position 'NOMINAL MIX' cement concrete using cement sand 1.00 Cum.
and crushed aggregate by machine mix including necessary formworks ,centering
,scaffolding compaction by mechanical vibrator curing as directed with all lead & lift
etc. (A) Concrete grade 1:3:6 and MSA-40mm(Graded)
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
84 Providing & Laying in position 'NOMINAL MIX' cement concrete using cement sand 1.00 Cum.
and crushed aggregate by machine mix including necessary formworks ,centering
,scaffolding compaction by mechanical vibrator curing as directed with all lead & lift
etc. (B) Concrete grade 1:3:6 and MSA-80mm(Graded)
85 Providing & Laying in position 'NOMINAL MIX' cement concrete using cement sand 1.00 Cum.
and crushed aggregate by machine mix including necessary formworks ,centering
,scaffolding compaction by mechanical vibrator curing as directed with all lead & lift
etc. (C) Concrete grade 1:2:4 and MSA-40mm(Graded)
86 Providing & Laying in position 'NOMINAL MIX' cement concrete using cement sand 1.00 Cum.
and crushed aggregate by machine mix including necessary formworks ,centering
,scaffolding compaction by mechanical vibrator curing as directed with all lead & lift
etc. (D) Concrete grade 1:2:4 and MSA-80mm(Graded)
87 Providing & Laying in position 'NOMINAL MIX' cement concrete using cement sand 1.00 Cum.
and crushed aggregate by machine mix including necessary formworks ,centering
,scaffolding compaction by mechanical vibrator curing as directed with all lead & lift
etc. (E) Concrete grade 1:1.5:3 and MSA-20mm(Graded)
88 Providing & Laying in position 'NOMINAL MIX' cement concrete using cement sand 1.00 Cum.
and crushed aggregate by machine mix including necessary formworks ,centering
,scaffolding compaction by mechanical vibrator curing as directed with all lead & lift
etc. (F) Concrete grade 1:1.5:3 and MSA-40mm(Graded)
89 Providing, cutting, bending, binding and fixing in position as per drawing M.S.STEEL 1.00 M.T.
BAR reinforcement for R.C.C Works and anchor bars including cost of black annealed
16 to 18 BWG M.S. Wire etc. complete with all lead and lift.
90 Providing, cutting, bending, binding and fixing in position as per drawing H.Y.S.D. BAR 1.00 M.T
reinforcement for R.C.C. works and anchor bars including cost of black annealed 16 to
18 BWG M.S. wire etc complete with all lead and lift.
91 Providing, cutting, bending, binding and fixing in position as per drawing. TMT BAR, 1.00 M.T
reinforcement for R.C.C. works and anchor bars including cost of black annealed 16 to
18 BWG M.S. Wire etc. complete with all lead and lift. (a) Fe
92 Providing, cutting, bending, binding and fixing in position as per drawing. TMT BAR, 1.00 M.T
reinforcement for R.C.C. works and anchor bars including cost of black annealed 16 to
18 BWG M.S. Wire etc. complete with all lead and lift. (b) Fe
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
93 Providing, cutting, bending, binding and fixing in position as per drawing. TMT BAR, 1.00 M.T
reinforcement for R.C.C. works and anchor bars including cost of black annealed 16 to
18 BWG M.S. Wire etc. complete with all lead and lift. (c) Fe
94 Providing and laying un-coursed rubble masonry in cement and sand mortar by mass 1.00 Cum.
and machine mixing including use of header and bond stones etc. and including
scaffolding and finishing to required shape and batter end steps etc. as per drawing
and racking out the joints curing etc. complete in all respect. For all lead lifts (a) in
C.M. 1:5 for foundation and superstructure
95 Providing and laying un-coursed rubble masonry in cement and sand mortar by mass 1.00 Cum.
and machine mixing including use of header and bond stones etc. and including
scaffolding and finishing to required shape and batter end steps etc. as per drawing
and racking out the joints curing etc. complete in all respect. For all lead lifts (B) In
C.M. 1:3 for super structure
96 Providing and laying brick masonry using std. modular brunt bricks (2nd class) and 1.00 Cum.
cement mortar by mass incl striking out joints,curing,finishing and scaffolding etc.
complete. (a) IN C.M. 1:5 For all lead and lift.
97 Providing and laying brick masonry using locally available traditional (2nd class) 1.00 Cum.
bricks and cement mortar by mass including striking out joints, curing, finishing and
scaffolding etc. complete. (a) IN C.M. 1:5 For all lead and lift.
98 Providing and laying Fly ash brick masonry using comman burnt fly ash bricks , having 1.00 Cum.
strenght not less than 35 kg /sq.cm. in cement mortar by mass incl striking out
joints,curing,finishing and scaffolding etc. complete. (a) IN C.M. 1:5 For all lead and lift.
99 Cement plaster 20 mm thick in single coat to stone masonry in C.M. 1:3 including 1.00 Sq. Mt.
finishing, curing, scaffolding etc. complete. (a) UPTO 6.00 Mt. HEIGHT
100 Cement plaster 20 mm thick in single coat to stone masonry in C.M. 1:3 including 1.00 Sq. Mt.
finishing curing scaffolding etc. complete. (b) ABOVE 6.00 Mt. HEIGHT
101 Cement plaster 15mm thick in single coat to brick masonry in C.M. 1:3 incl 1.00 Sq. Mt.
finishing,curing,scaffolding etc complete. (a) UPTO 6.0 Mt HEIGHT
102 Cement plaster 15mm thick in single coat to brick masonry in C.M. 1:3 incl 1.00 Sq. Mt.
finishing,curing,scaffolding etc complete. (b) Above 6.0 Mt. HEIGHT
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
103 Cement plaster 12mm thick in single coat to CC/RCC / masonry work in C.M. 1:3 1.00 Sq. Mt.
including finishing curing scaffolding etc complete. (a) UPTO 6.00 Mt. HEIGHT
104 Cement plaster 12mm thick in single coat to CC/RCC / masonry work in C.M. 1:3 1.00 Sq. Mt.
including finishing, curing scaffolding etc complete. (b) ABOVE 6.00 Mt. HEIGHT
105 Cement plaster 10mm thick in single coat to CC/RCC work and brick work on fair side 1.00 Sq. Mt.
in C.M. 1:3 including finishing,curing,scaffolding etc complete. (a) UPTO 6.00 Mt.
106 Cement plaster 10mm thick in single coat to CC/RCC work and brick work on fair side 1.00 Sq. Mt.
in C.M. 1:3 including finishing,curing,scaffolding etc complete. (b) ABOVE 6.00 Mt.
107 Sand face type cement plaster 20mm thick in two coat (i) Backing coat 12mm thick in 1.00 Sq. Mt.
C.M. 1:3 and (ii) Finishing coat 8mm thick in C.M.1:2 including finishing curing
scaffolding etc complete. (a) UPTO 6.0 Mt. HEIGHT
108 Sand face type cement plaster 20mm thick in two coat (i) Backing coat 12mm thick in 1.00 Sq. Mt.
C.M. 1:3 and (ii) Finishing coat 8mm thick in C.M.1:2 including finishing curing
scaffolding etc complete. (b) Above 6.0 Mt. HEIGHT
109 Wire Mesh Cement plaster 20mm thick in C.M.1:3 with mesh of 90X90mm and wire 1.00 Sq. Mt.
2.5mm dia. including cost of anchor/holding bars fixed in the Masonry/CC/RCC at
specified spacing including drilling holes and grouting for retrofitting & repairing
including racking out joints, scaffolding curing etc complete.
110 Cement pointing in C.M.1:3 to stone masonry after racking out joints 20mm deep incl 1.00 Sq. Mt..
scaffolding ,watering and curing etc complete. (a) UPTO 6.0 Mt. HEIGHT
111 Cement pointing in C.M.1:3 to stone masonry after racking out joints 20mm deep incl 1.00 Sq. Mt..
scaffolding ,watering and curing etc complete. (b) Above 6.0 Mt. HEIGHT
112 Cement pointing in C.M.1:2 to stone masonry after racking out joints 20mm deep incl 1.00 Sq. Mt..
scaffolding ,watering and curing etc complete. (a) UPTO 6.0 Mt. HEIGHT
113 Cement pointing in C.M.1:2 to stone masonry after racking out joints 20mm deep incl 1.00 Sq. Mt..
scaffolding ,watering and curing etc complete. (b) Above 6.0 Mt. HEIGHT
114 Drilling 75 or 100 mm dia drainage holes by Mechanical Rotary (Dimond Bits) Drill 1.00 Rmt.
tools upto 6.0 mt or as specified depth below bucket including cleaning and washing
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
115 Drilling 50mm dia holes by callyx method & mechanical cutting tools at 3.0 mt c/c or 1.00 Rmt.
as specified upto 3.0mt depth in spillway below bucket for anchor bars including
cleaning holes.
116 Labour chages for Fixing 25mm diameter Anchor bars as per drawing in foundation 1.00 Rmt.
below bucket including making ring at bottom & filling the holes with C.M.1:1 etc.
complete. Excluding cost of steel.
117 Drilling 75mm dia. Drainage holes by callyx method and mechanical cutting tools upto 1.00 Rmt.
10mt depth at 5.0mt c/c or as directed for the spillway including washing and cleaning
holes etc. complete.
118 Drilling for 35 mm or specified diameter Holes by mechanical rotary (Diamond bits) 1.00 Rmt.
drilling tools for P-TEST for spillway masonry.
119 Washing the test holes before P - TEST as directed etc. complete. 1.00 No.
120 Taking permeability test (P-TEST ) at 7 kg/cm2 pressure (max.) with packers for dam 1.00 No.
masonry as directed etc. complete.
121 Drilling 75mm or as specified dia. Exploratory bore holes using diamond core drilling 1.00 Rmt.
machine(hydraulic feeder machine) in all formations including masonry and concrete
with providing necessary standard core boxes of non teak wood with marking etc.
122 Providing & laying 225 mm dia. Half round NP-2 class RCC drainage pipe at 5.0mt c/c 1.00 Rmt.
or as specified below bucket as directed etc. complete.
123 Providing & laying 300 mm dia. Half round NP-2 class RCC Transverse collecting pipe 1.00 Rmt.
at 3.0mt c/c or as specified below bucket as directed etc comp
124 Providing & laying 150mm dia. G.I. (B-Class medium duty) outfall pipe at 5.0mt c/c or 1.00 Rmt.
as specified for drainage purpose as directed etc complete.
125 Providing and laying 600 mm dia NP-3 class drainage collection RCC hume pipe along 1.00 Rmt.
spillway length and making joints with drainage holes and porous blank shaft as
directed etc complete.
126 Providing and laying 200 mm dia ( internal diameter ) drainage shaft with pre cast 1.00 Rmt.
porous cement block in cement : aggregate ( 1:3 ) of size 40x40x20 cms etc complete.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
127 Providing and laying graded filters of sand,gravel/metal and over size metal ( 100 to 1.00 Cum.
150 mm) behind the retaining wall & wing walls as directed as per approved drawing
with all lead and lifts etc complete.
128 Providing & fixing in position double contraction joints in masonry/concrete at 1.00 Rmt.
specified intervals including installation of 1.5 mm copper strips & PVC diaphragm incl
embedding the same within concrete at sides and bottoms and filling the joints with
asphalt in the manner specified as per approved drawing including necessary
materials,labours etc .
129 Providing and fixing G.I. Pipe railing (B-class medium duty) as per design of 1.0 Mt. 1.00 Rmt.
height using 75X75X10mm size M.S Angle at 2.0 Mt., c/c for vertical posts and 38 mm
dia. G.I .Pipe for 4 horizontal rows including one coat of red oxide primer & two coats
of oil paint etc complete.
130 Providing and fixing in position 100/110 mm dia A.C. Pipe weep holes in the retaining 1.00 Rmt.
131 Providing and fixing in position 100/110 mm dia PVC Pipe weep holes in the retaining 1.00 Rmt.
132 Providing and fixing in position non return flap valve of approved design and make. (a) 1.00 No.
133 Providing and fixing in position non return flap valve of approved design and make. 1.00 No.
134 Providing & filling in contraction joints with 12mm thick bitumen sheet of approved 1.00 Sq. Mt.
quality as directed.
135 Providing and supplying anchor rods of size, shape and length as shown in the drawing 1.00 M.T.
or as directed for spillway gates including cutting,bending,threading, machining etc
complete with nuts and wishers and required treatment as directed etc.
136 Labour charges for fixing in position, horizontal and vertical anchor rods as per design 1.00 M.T.
& drawing including cost of providing necessary supports, templates and all required
accessories etc complete.
137 Dewatering of foundation area, pits & trenches of head works and allied works with 1.00 Hp-hr
diesel or electrical pumping arrangement including cost of pipe lines, other materials,
labours etc complete as directed with all lifts.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
138 Providing & fixing in position rock bolting incl supplying steel bars and drilling holes 1.00 Rmt.
of required diameter upto 50mm in all formation of rock strata,bolting,grouting with
cement mortar,curing etc complete.
139 Cleaning the bed of Spillway foundation prior to mapping, with air and water jet incl 1.00 Sq. Mt.
removal of all loose materials/debris etc complete.
SPILLWAY BRIDGE
140 Prov. & Laying. in position controlled cement concrete using cement,sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks
centering scaffolding compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Pier Cap and Bed
block. (1/a) Concrete grade M-20 and MSA-20mm (Graded)
141 Prov. & Laying. in position controlled cement concrete using cement,sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks
centering scaffolding compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Pier Cap and Bed
block. (1/b) Concrete grade M-20 and MSA-40mm (Graded)
142 Prov. & Laying. in position controlled cement concrete using cement,sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks
centering scaffolding compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Pier Cap and Bed
block. (1/c) Concrete grade M-25 and MSA-20mm (Graded)
143 Prov. & Laying. in position controlled cement concrete using cement,sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks
centering scaffolding compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Pier Cap and Bed
block. (1/d) Concrete grade M-25 and MSA-40mm (Graded)
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
144 Prov. & Laying. in position controlled cement concrete using cement,sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks
centering scaffolding compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Deck Slab (1/e)
Concrete grade M-20 and MSA-20mm (Graded)
145 Prov. & Laying. in position controlled cement concrete using cement,sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks
centering scaffolding compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Deck Slab (1/f)
Concrete grade M-20 and MSA-40mm (Graded)
146 Prov. & Laying. in position controlled cement concrete using cement,sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks
centering scaffolding compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Deck Slab (1/g)
Concrete grade M-25 and MSA-20mm (Graded)
147 Prov. & Laying. in position controlled cement concrete using cement,sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks
centering scaffolding compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Deck Slab (1/h)
Concrete grade M-25 and MSA-40mm (Graded)
148 Prov. & Laying. in position controlled cement concrete using cement,sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks
centering scaffolding compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Main & Cross Girder
(1/i) Concrete grade M-20 and MSA-20mm (Graded)
149 Prov. & Laying. in position controlled cement concrete using cement,sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks
centering scaffolding compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Main & Cross Girder
(1/j) Concrete grade M-20 and MSA-40mm (Graded)
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
150 Prov. & Laying. in position controlled cement concrete using cement,sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks
centering scaffolding compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Main & Cross Girder
(1/k) Concrete grade M-25 and MSA-20mm (Graded)
151 Prov. & Laying. in position controlled cement concrete using cement,sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks
centering scaffolding compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Main & Cross Girder
(1/l) Concrete grade M-25 and MSA-40mm (Graded)
152 Prov. & Laying. in position controlled cement concrete using cement, sand and crushed 1.00 Rmt.
metal aggregate by machine mix for R.C.C work including necessary formworks,
centering, scaffolding, compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Parapet upto 15 cms
thick & 1.0 mt height (2/a) Concrete grade M-20 and MSA - 20mm (Graded)
153 Prov. & Laying. in position controlled cement concrete using cement, sand and crushed 1.00 Rmt.
metal aggregate by machine mix for R.C.C work including necessary formworks,
centering, scaffolding, compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Parapet upto 15 cms
thick & 1.0 mt height (2/b) Concrete grade M-25 and MSA - 20mm (Graded)
154 Prov. & Laying. in position controlled cement concrete using cement, sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks,
centering, scaffolding, compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Wearing coat 75 mm
thick.Filling expantion joint with asphalt (2/c) Concrete grade M-20 and MSA - 20mm
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
155 Prov. & Laying. in position controlled cement concrete using cement, sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks,
centering, scaffolding, compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Wearing coat 75 mm
thick.Filling expantion joint with asphalt (2/d) Concrete grade M-25 and MSA - 20mm
156 Prov. & Laying. in position controlled cement concrete using cement, sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks,
centering, scaffolding, compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Kerbing (2/e)
Concrete grade M-20 and MSA - 20mm (Graded)
157 Prov. & Laying. in position controlled cement concrete using cement, sand and crushed 1.00 Cum.
metal aggregate by machine mix for R.C.C work including necessary formworks,
centering, scaffolding, compaction by mechanical vibrator,curing as directed with all
lead & lift etc complete Excluding the cost of reinforcement. For Kerbing (2/f)
Concrete grade M-25 and MSA - 20mm (Graded)
158 Providing and fixing galvanized iron /cast iron 100mm dia water spouts incl necessary 1.00 No.
iron fittings as per design and drawing etc complete.
159 Providing and fixing metal expansion joints with M.S. Angle 35x35x6 mm and M.S.Plate 1.00 Rmt.
100x6mm as per design and drawing etc complete.
160 Providing and fixing in position ELASTOMER BEARING of size 480x310x48mm 1.00 Cu. Cms.
(nominal) incl elastomer pads adhesive, steel plates etc complete incl cost of materials
and labour and testing charges etc. as per drawing and design.
161 Providing and fixing in position white marble plate of size 60x45x1.8 cm including 1.00 No.
ingraving the letters as per drawing/as directed etc complete.
162 Providing and fixing in position Black granite plate of size 60x45x1.8 cm including 1.00 No.
ingraving the letters as per drawing/as directed etc complete.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
163 Prov. & Laying in position controlled cement concrete using cement, sand and crushed 1.00 Cum.
aggregate by machine mix for R.C.C/CC work including necessary formworks centering
scaffolding compaction by mechanical vibrator,curing as directed with all lead & lift etc
complete Excluding the cost of reinforcement For Staunching ring,coping,stilling basin
etc and other general purpose.(2/A) Concrete grade M-15 and MSA-20mm
164 Prov. & Laying in position controlled cement concrete using cement, sand and crushed 1.00 Cum.
aggregate by machine mix for R.C.C/CC work including necessary formworks centering
scaffolding compaction by mechanical vibrator,curing as directed with all lead & lift etc
complete Excluding the cost of reinforcement For Staunching ring,coping,stilling basin
etc and other general purpose.(2/B) Concrete grade M-15 and MSA-40mm
165 Prov. & Laying in position controlled cement concrete using cement, sand and crushed 1.00 Cum.
aggregate by machine mix for R.C.C/CC work including necessary formworks centering
scaffolding compaction by mechanical vibrator,curing as directed with all lead & lift etc
complete Excluding the cost of reinforcement For Staunching ring,coping,stilling basin
etc and other general purpose.(2/C) Concrete grade M-20 and MSA-20mm
166 Prov. & Laying in position controlled cement concrete using cement, sand and crushed 1.00 Cum.
aggregate by machine mix for R.C.C/CC work including necessary formworks centering
scaffolding compaction by mechanical vibrator,curing as directed with all lead & lift etc
complete Excluding the cost of reinforcement For Staunching ring,coping,stilling basin
etc and other general purpose.(2/D) Concrete grade M-20 and MSA-40mm
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
167 Prov. & Laying in position controlled cement concrete using cement, sand and crushed 1.00 Cum.
aggregate by machine mix for R.C.C/CC work including necessary formworks centering
scaffolding compaction by mechanical vibrator,curing as directed with all lead & lift etc
complete Excluding the cost of reinforcement FOR WALLS, TOP & BOTTOM OUTLET
OF SLUICE GATE,ETC.(2/E) Concrete grade M-15 and MSA-20mm
168 Prov. & Laying in position controlled cement concrete using cement, sand and crushed 1.00 Cum.
aggregate by machine mix for R.C.C/CC work including necessary formworks centering
scaffolding compaction by mechanical vibrator,curing as directed with all lead & lift etc
complete Excluding the cost of reinforcement FOR WALLS, TOP & BOTTOM OUTLET
OF SLUICE GATE,ETC.(2/F) Concrete grade M-15 and MSA-40mm
169 Prov. & Laying in position controlled cement concrete using cement, sand and crushed 1.00 Cum.
aggregate by machine mix for R.C.C/CC work including necessary formworks centering
scaffolding compaction by mechanical vibrator,curing as directed with all lead & lift etc
complete Excluding the cost of reinforcement FOR WALLS, TOP & BOTTOM OUTLET
OF SLUICE GATE,ETC.(2/G) Concrete grade M-20 and MSA-20mm
170 Prov. & Laying in position controlled cement concrete using cement, sand and crushed 1.00 Cum.
aggregate by machine mix for R.C.C/CC work including necessary formworks centering
scaffolding compaction by mechanical vibrator,curing as directed with all lead & lift etc
complete Excluding the cost of reinforcement FOR WALLS, TOP & BOTTOM OUTLET
OF SLUICE GATE,ETC.(2/H) Concrete grade M-20 and MSA-40mm
171 Providing and laying IRS-NP-4 Pipes for conduit incl laying in position and making 1.00 Rmt.
joint in C.M.1:1 including curing,testing etc complete as per approved drawing with all
lead and lift. (A) 900 mm internal diameter.
172 Providing and laying IRS-NP-4 Pipes for conduit incl laying in position and making 1.00 Rmt.
joint in C.M.1:1 including curing,testing etc complete as per approved drawing with all
lead and lift. (B) 1100 mm internal diameter.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
173 Providing and laying IRS-NP-4 Pipes for conduit incl laying in position and making 1.00 Rmt.
joint in C.M.1:1 including curing,testing etc complete as per approved drawing with all
lead and lift. (C) 1200 mm internal diameter.
174 Providing and fixing air vent pipe to RCC hume pipe and fixing in the body of HR etc 1.00 Rmt.
complete (a) 225 mm dia.
175 Providing and fixing air vent pipe to RCC hume pipe and fixing in the body of HR etc 1.00 Rmt.
complete (b) 300 mm dia.
176 Providing & fixing chequarred plate (6mm thick) platform over RSJ steel beam as per 1.00 Sq. Mt.
approved drawing and design incl all necessary accessories for fixing the platform
with finishing the edge of plate and welding ,primer & epoxy paint etc complete.
177 Providing, laying & fixing M.S. grill made from 20mm dia bars fixed at 22cm c/c both 1.00 Sq. Mt.
ways by welding incl keeping necessary opening & supports with one coat of primer &
two coat of approved anti corrosive paint etc complete in all respect.
178 Providing, fabricating and erecting 60cms wide steel ladder of M.S. angle 50x50x6mm 1.00 Rmt.
for HR well as per drawing and design incl one coat of primer and two coat of anti
corrosive paints etc complete.
179 Providing, fabricating and erecting in position service gate and emergency gate incl 1.00 Sq. Mt.
cost of embedded parts, hoisting arrangement, finishing etc as per design and drawing
with one coat of primer and two coats of anti corrosive black epoxy paints etc
180 Providing, bending in shape and fixing in position 25mm dia (20+60+20cm long) 1.00 No.
M.S.bar for steps in HR well incl cutting,bending and fixing in position by drilling the
hole in RCC and grouting the same with cement mortar etc complete.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
181 Prov. & Laying in position "NOMINAL MIX" cement concrete using cement , sand & 1.00 Cum.
H.B.METAL by mass and machine mix for PCC including necessary formworks,
compaction, raming, curing as directed with all lead and lift etc complete. For
foundation concrete / other general purpose. Concrete (1:3:6) Metal Size- 63mm
(cement level 220 kg/cum)
182 Prov. & Laying in position "NOMINAL MIX" cement concrete using cement , sand & 1.00 Cum
gravel by mass and machine mix for PCC including necessary formworks, compaction,
raming, curing as directed with all lead and lift etc complete. For foundation concrete /
other general purpose. Concrete (1:3:6) Metal Size- 40mm to 63mm (cement level
183 Prov. & Laying in position cement concrete using cement, sand and crushed metal 1.00 Cum
coarse aggregate by mass and machine mix for PCC/RCC including necessary
formworks compaction by vibrator, curing as directed with all lead & lift etc complete.
(Excluding cost of steel) FOR BODYWALL, APRON, TRAINING WALL, SIDE WALL,
SPLAY WALL, KEY WALL, CUT OF WALL ETC. (4/a) Concrete (1:3:6) and MSA-40mm
(Cement level 220 kg/cum)
184 Prov. & Laying in position cement concrete using cement, sand and crushed metal 1.00 Cum
coarse aggregate by mass and machine mix for PCC/RCC including necessary
formworks compaction by vibrator, curing as directed with all lead & lift etc complete.
(Excluding cost of steel) FOR BODYWALL, APRON, TRAINING WALL, SIDE WALL,
SPLAY WALL, KEY WALL, CUT OF WALL ETC. (4/b) Concrete (1:3:6) and MSA-80mm
(Cement level 200 kg/cum)
185 Prov. & Laying in position cement concrete using cement, sand and crushed metal 1.00 Cum
coarse aggregate by mass and machine mix for PCC/RCC including necessary
formworks compaction by vibrator, curing as directed with all lead & lift etc complete.
(Excluding cost of steel) FOR BODYWALL, APRON, TRAINING WALL, SIDE WALL,
SPLAY WALL, KEY WALL, CUT OF WALL ETC. (4/c) Controlled Concrete grade M-15
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
186 Prov. & Laying in position cement concrete using cement, sand and crushed metal 1.00 Cum
coarse aggregate by mass and machine mix for PCC/RCC including necessary
formworks compaction by vibrator, curing as directed with all lead & lift etc complete.
(Excluding cost of steel) FOR BODYWALL, APRON, TRAINING WALL, SIDE WALL,
SPLAY WALL, KEY WALL, CUT OF WALL ETC. (4/d) Controlled Concrete grade M-15
187 Prov. & Laying in position cement concrete using cement, sand and crushed metal 1.00 Cum
coarse aggregate by mass and machine mix for PCC/RCC including necessary
formworks compaction by vibrator, curing as directed with all lead & lift etc complete.
(Excluding cost of steel) FOR BODYWALL, APRON, TRAINING WALL, SIDE WALL,
SPLAY WALL, KEY WALL, CUT OF WALL ETC. (4/e) "Nominal Mix" Concrete grade
1:2:4 and MSA-40mm
188 Prov. & Laying in position cement concrete using cement, sand and crushed metal 1.00 Cum
coarse aggregate by mass and machine mix for PCC/RCC including necessary
formworks compaction by vibrator, curing as directed with all lead & lift etc complete.
(Excluding cost of steel) FOR BODYWALL, APRON, TRAINING WALL, SIDE WALL,
SPLAY WALL, KEY WALL, CUT OF WALL ETC. (4/f) "Nominal Mix" Concrete grade
1:2:4 and MSA-80mm
189 Providing and laying 15 cm thick STONE SOILING below apron using stone weighing 1.00 Sq. Mt.
not less than 20 kg or as specified as per design and drawing including hand packing
etc complete with all lead and lift.
190 Providing and laying STONE LOANCHING APRON by using 50% stone which having 1.00 Cum.
weighing not less than 40 kg or as specified including hand packing and filling the
interstices by spouls etc complete with all lead and lift.
191 Providing and placing in position 18 gauge G.I. Sheet strip of width 30 cm at 1.00 Rmt.
contraction joints as shown in the drawing or as directed.
192 Providing and fixing in position white marble plate of size 45x45x1.8 cm incl ingraving 1.00 No.
the letters as per drawing/as directed etc complete.
193 Labour charge for conveying and fixing the concrete needles in position and filling the 1.00 No.
earth between two rows of needles incl temping and watering etc complete as
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
194 Labour charges for removing concrete needles from check dam and caring and 1.00 No.
stacking the same as directed.
195 Providing and supplying, the precast- RCC concrete grade M-20 sleepers of thickness 1.00 No.
5cms as per design and drawing with all lead and lift and stacking the same in the
store or safe as directed and incl the cost of reinforcement.(sleeper
size:1.65x0.15x0.05mt)
196 Drilling 25 mm dia. holes at distance as specified and depth up to 3.0 Mt. for check- 1.00 Rmt.
dam foundation & fixing anchor bars of specified diameter with cement grout
including cleaning holes as directed etc. ( excluding cost of bars )
197 Prov. & Laying in position cement concrete using cement, sand and crushed metal 1.00 Cum.
(40mm MSA) coarse aggregate by mass and machine mix for PCC including necessary
compaction by hand tamping, curing as directed with all lead & lift etc complete. C.C IN
1:4:8 FOR FOUNDATION LEVELING COURSE
198 Excavation in all sorts of strata and formations including depositing the un-useful 1.00 Cum.
excavated stuff as and where directed including sorting and stacking useful materials
as directed up to 30 Mt. lead etc complete including dewatering. (depth 0 to 3.00 Mt.)
(For all type Canal and foundation trenches of C.D. works) (A) IN OVERBURDEN
INCLUDING HARD MURRUM.
199 Excavation in all sorts of strata and formations including depositing the un useful 1.00 Cum.
excavated stuff as and where directed including sorting and stacking useful materials
as directed up to 30 Mt. lead etc complete including dewatering. (depth 0 to 3.00 Mt)
(For all type Canal and foundation trenches of C.D. works) (B) IN SOFT ROCK
200 Excavation in all sorts of strata and formations including depositing the un useful 1.00 Cum.
excavated stuff as and where directed including sorting and stacking useful materials
as directed up to 30 Mt. lead etc complete including dewatering. (depth 0 to 3.00 Mt)
(For all type Canal and foundation trenches of C.D. works) (C) IN HARD ROCK
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
201 Excavation in all sorts of strata and formations including depositing the un useful 1.00 Cum.
excavated stuff as and where directed including sorting and stacking useful materials
as directed up to 30 Mt. lead etc complete including dewatering. (depth 0 to 3.00 Mt)
(For all type Canal and foundation trenches of C.D. works) (D) IN BHAT ROCK
202 Excavation in all sorts of strata and formations including depositing the un useful 1.00 Cum.
excavated stuff as and where directed including sorting and stacking useful materials
as directed up to 30 Mt. lead etc complete including dewatering. (depth 3.00 to
Mt) (For all type Canal and foundation trenches of C.D. works) (A) IN OVERBURDEN
INCLUDING HARD MURRUM.
203 Excavation in all sorts of strata and formations including depositing the un useful 1.00 Cum.
excavated stuff as and where directed including sorting and stacking useful materials
as directed up to 30 Mt. lead etc complete including dewatering. (depth 3.00 to
Mt) (For all type Canal and foundation trenches of C.D. works) (B) IN SOFT ROCK
204 Excavation in all sorts of strata and formations including depositing the un useful 1.00 Cum.
excavated stuff as and where directed including sorting and stacking useful materials
as directed up to 30 Mt. lead etc complete including dewatering. (depth 3.00 to
Mt) (For all type Canal and foundation trenches of C.D. works) (C) IN HARD ROCK
205 Excavation in all sorts of strata and formations including depositing the un useful 1.00 Cum.
excavated stuff as and where directed including sorting and stacking useful materials
as directed up to 30 Mt. lead etc complete including dewatering. (depth 3.00 to
Mt) (For all type Canal and foundation trenches of C.D. works) (D) IN BHAT ROCK
206 Excavation in all sorts of strata and formations including depositing the un useful 1.00 Cum.
excavated stuff as and where directed including sorting and stacking useful materials
as directed up to 30 Mt. lead etc complete including dewatering. (depth Above
Mt) (For all type Canal and foundation trenches of C.D. works) (A) IN OVERBURDEN
INCLUDING HARD MURRUM.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
207 Excavation in all sorts of strata and formations including depositing the un useful 1.00 Cum.
excavated stuff as and where directed including sorting and stacking useful materials
as directed up to 30 Mt. lead etc complete including dewatering. (depth Above
Mt) (For all type Canal and foundation trenches of C.D. works) (B) IN SOFT ROCK
208 Excavation in all sorts of strata and formations including depositing the un useful 1.00 Cum.
excavated stuff as and where directed including sorting and stacking useful materials
as directed up to 30 Mt. lead etc complete including dewatering. (depth Above
Mt) (For all type Canal and foundation trenches of C.D. works) (C) IN HARD ROCK
209 Excavation in all sorts of strata and formations including depositing the un useful 1.00 Cum.
excavated stuff as and where directed including sorting and stacking useful materials
as directed up to 30 Mt. lead etc complete including dewatering. (depth Above
Mt) (For all type Canal and foundation trenches of C.D. works) (D) IN BHAT ROCK
210 Earth work in embankment from borrow pits in all sort of soil and soft murrum or 1.00 Cum.
other suitable strata as directed including breaking clods and dressing to the design
section with lead as under and all lift including site clearance etc comp. For all canal
capacity & without rolling and watering. 0 to 30 Mt. lead
211 Earth work in embankment from borrow pits in all sort of soil and soft murrum or 1.00 Cum.
other suitable strata as directed including breaking clods and dressing to the design
section with lead as under and all lift including site clearance etc comp. For all canal
capacity & without rolling and watering. 30 to 200 Mt. lead
212 Earth work in embankment from borrow pits in all sort of soil and soft murrum or 1.00 Cum.
other suitable strata as directed including breaking clods and dressing to the design
section with lead as under and all lift including site clearance etc comp. For all canal
capacity & without rolling and watering. 200 to 1000 Mt. lead
213 Compaction of earth work in embankment in layers of 15 to 23 cms at OMC to required 1.00 Cum.
dry density incl necessary rolling with vibratory rollers of 10 to 12 tones capacity.
214 Dry rolling of earth work with light rollers of up to 2.0 tones capacity as directed with 1.00 Cum.
all lift etc complete.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
215 Extra rate for watering the earth work in embankment at OMC as directed etc 1.00 Cum.
216 Providing dummy bunds and gutter along the canal in all type of soil and murrum for 1.00 Cum.
proper drainage and using the excavated materials as directed etc complete with all
leads and lifts.
217 Prov. & Laying in position "Nominal Mix" cement concrete using cement , sand & Hand 1.00 Cum.
Broken Metal by mass and machine mix for PCC including necessary formworks,
compaction, ramming ,curing as directed with all lead and lift etc complete.For
foundation concrete / other general purpose (B) Concrete grade 1:2:4 and MSA -
218 Prov. and laying in position "NOMINAL MIX" cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete. FOR GENERAL PURPOSE (a) Concrete grade
1:3:6 and MSA-40 mm (cement level 220 Kg/cum)
219 Prov. and laying in position "NOMINAL MIX" cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for C.C. work including necessary
formworks centering, scaffolding, compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete. FOR GENERAL PURPOSE (a) Concrete
grade 1:3:6 and MSA-80 mm (cement level 200 Kg/cum)
220 Prov. and laying in position "NOMINAL MIX" cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete. FOR GENERAL PURPOSE (c) Concrete
Grade 1:2:4 and MSA-40 mm
221 Prov. and laying in position "NOMINAL MIX" cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete. FOR GENERAL PURPOSE (d) Concrete
Grade 1:2:4 and MSA-80 mm
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
222 Prov. and laying in position "NOMINAL MIX" cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete. FOR GENERAL PURPOSE (e) Concrete
Grade 1:1.5:3 and MSA-20 mm
223 Prov. and laying in position "NOMINAL MIX" cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete. FOR GENERAL PURPOSE (f) Concrete
Grade 1:1.5:3 and MSA-40 mm
224 Providing and laying in position controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by vibrator, curing as directed with all
lead and lift etc complete Excluding the cost of reinforcement FOR PLINTH COURSE &
COPING (a) Concrete grade M-15 and MSA-20 mm
225 Providing and laying in position controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by vibrator, curing as directed with all
lead and lift etc complete Excluding the cost of reinforcement FOR PLINTH COURSE &
COPING (b) Concrete grade M-15 and MSA-40 mm
226 Providing and laying in position controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by vibrator, curing as directed with all
lead and lift etc complete Excluding the cost of reinforcement FOR PLINTH COURSE &
COPING (c) Concrete grade M-20 and MSA-20 mm
227 Providing and laying in position controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by vibrator, curing as directed with all
lead and lift etc complete Excluding the cost of reinforcement FOR PLINTH COURSE &
COPING (d) Concrete grade M-20 and MSA-40 mm
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
228 Prov. And Laying in position controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator, curing as
directed with all lead & lift etc complete Excluding the cost of reinforcement FOR
SLABS AND LOFTS (a) Concrete grade M-25 and MSA-20mm
229 Prov. And Laying in position controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator, curing as
directed with all lead & lift etc complete Excluding the cost of reinforcement FOR
SLABS AND LOFTS (b) Concrete grade M-25 and MSA-40mm
230 Prov. And Laying in position controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator, curing as
directed with all lead & lift etc complete Excluding the cost of reinforcement FOR
SLABS AND LOFTS (c) Concrete grade M-20 and MSA-20mm
231 Prov. And Laying in position controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator, curing as
directed with all lead & lift etc complete Excluding the cost of reinforcement FOR
SLABS AND LOFTS (d) Concrete grade M-20 and MSA-40mm
232 Prov. and Laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator,curing as directed
with all lead & lift etc complete Excluding the cost of reinforcement. FOR COLUMN
AND BEAMS (A) Concrete grade M-25 and MSA-20mm
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
233 Prov. and Laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator,curing as directed
with all lead & lift etc complete Excluding the cost of reinforcement. FOR COLUMN
AND BEAMS (B) Concrete grade M-25 and MSA-40mm
234 Prov. and Laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator,curing as directed
with all lead & lift etc complete Excluding the cost of reinforcement. FOR COLUMN
AND BEAMS (C) Concrete grade M-20 and MSA-20mm
235 Prov. and Laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator,curing as directed
with all lead & lift etc complete Excluding the cost of reinforcement. FOR COLUMN
AND BEAMS (D) Concrete grade M-20 and MSA-40mm
236 Prov. and Laying in position Controlled cement concrete using cement, sand and 1.00 Rmt.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator, curing as
directed with all lead & lift etc complete Excluding the cost of reinforcement. FOR
PARAPET UP TO 15 CMS THICK & HT. 1.0 MT. (A) Concrete grade M-20 and MSA-
237 Prov. and Laying in position Controlled cement concrete using cement, sand and 1.00 Rmt.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator, curing as
directed with all lead & lift etc complete Excluding the cost of reinforcement. FOR
PARAPET UP TO 15 CMS THICK & HT. 1.0 MT. (B) Concrete grade M-25 and MSA-
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
238 Providing and laying in position controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete Excluding the cost of reinforcement FOR
PIER AND ABT. (a) Concrete grade M-15 and MSA-40 mm
239 Providing and laying in position controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete Excluding the cost of reinforcement FOR
PIER AND ABT. (b) Concrete grade M-20 and MSA-40 mm
240 Prov. and Laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator, curing as
directed with all lead & lift etc complete Excluding the cost of reinforcement FOR PIER
AND ABT. CAP (A) Concrete grade M-20 and MSA- 20mm
241 Prov. and Laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator, curing as
directed with all lead & lift etc complete Excluding the cost of reinforcement FOR PIER
AND ABT. CAP (B) Concrete grade M-25 and MSA- 20mm
242 Providing and laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete Excluding the cost of reinforcement for skin
concrete, friction blocks, stilling basin (a) Concrete grade M-20 and MSA-20 mm
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
243 Providing and laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete Excluding the cost of reinforcement for skin
concrete, friction blocks, stilling basin (b) Concrete grade M-20 and MSA-40 mm
244 Providing and laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete Excluding the cost of reinforcement for skin
concrete, friction blocks, stilling basin (c) Concrete grade M-25 and MSA-20 mm
245 Providing and laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete Excluding the cost of reinforcement for skin
concrete, friction blocks, stilling basin (d) Concrete grade M-25 and MSA-40 mm
246 Providing and laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete Excluding the cost of reinforcement FOR
SOLID SLAB OF ROAD BRIDGE (a) Concrete grade M-20 and MSA-20 mm
247 Providing and laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete Excluding the cost of reinforcement FOR
SOLID SLAB OF ROAD BRIDGE (b) Concrete grade M-20 and MSA-40 mm
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
248 Providing and laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete Excluding the cost of reinforcement FOR
SOLID SLAB OF ROAD BRIDGE (c) Concrete grade M-25 and MSA-20 mm
249 Providing and laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C./C.C. work including necessary
formworks centering scaffolding compaction by Mechanical vibrator, curing as
directed with all lead and lift etc complete Excluding the cost of reinforcement FOR
SOLID SLAB OF ROAD BRIDGE (d) Concrete grade M-25 and MSA-40 mm
250 Prov. and Laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator,curing as directed
with all lead & lift etc complete Excluding the cost of reinforcement. FOR CSY & DSY
BARREL (A) Concrete grade M-20 and MSA-20mm
251 Prov. and Laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator,curing as directed
with all lead & lift etc complete Excluding the cost of reinforcement. FOR CSY & DSY
BARREL (B) Concrete grade M-25and MSA-20mm
252 Prov. and Laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator, curing as
directed with all lead & lift etc complete Excluding the cost of reinforcement. FOR
BEAMS OF MINOR BRIDGE (A) Concrete grade M-20 and MSA-20mm
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
253 Prov. and Laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator, curing as
directed with all lead & lift etc complete Excluding the cost of reinforcement. FOR
BEAMS OF MINOR BRIDGE (B) Concrete grade M-25and MSA-20mm
254 Prov. and Laying in position Controlled cement concrete using cement, sand and 1.00 Cum.
crushed aggregate by mass and machine mix for R.C.C/CC work including necessary
formworks centering scaffolding compaction by mechanical vibrator, curing as
directed with all lead & lift etc complete Excluding the cost of reinforcement but filling
the expansion joint with asphalt. FOR WEARING COATS. Concrete grade M-20and MSA-
255 Prov. & Laying in position Controlled cement concrete using cement, sand and crushed 1.00 Sq. Mt..
aggregate by mass and machine mix for C.C work in canal lining including necessary
formworks centering scaffolding compaction by plate vibrator,curing as directed with
all lead & lift etc complete incl dressing the bed and trimming the canal section if
required and minor filling with murrum / earth as per site condition to the correct
profile,incl providing bitumen joints as per drawing and specified interval. ( Without
using paver machineries.) (A) For 10cms thick cast-in-citu canal lining in M-10 grade
of conc.with MSA-20mm incl providing pair of horizontal and transverse sleepers of
size 150x75mm and 3.0 mt c/c in c.c. M-10 grade concrete.
256 Prov. & Laying in position Controlled cement concrete using cement, sand and crushed 1.00 Sq. Mt..
aggregate by mass and machine mix for C.C work in canal lining including necessary
formworks centering scaffolding compaction by plate vibrator,curing as directed with
all lead & lift etc complete incl dressing the bed and trimming the canal section if
required and minor filling with murrum / earth as per site condition to the correct
profile,incl providing bitumen joints as per drawing and specified interval. (Without
using paver machineries.) (B) For 10cms thick cast-in-citu canal lining in M-10 grade
of conc.with MSA-20mm without sleepers.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
257 Prov. & Laying in position Controlled cement concrete using cement, sand and crushed 1.00 Sq. Mt..
aggregate by mass and machine mix for C.C work in canal lining including necessary
formworks centering scaffolding compaction by plate vibrator,curing as directed with
all lead & lift etc complete incl dressing the bed and trimming the canal section if
required and minor filling with murrum / earth as per site condition to the correct
profile,incl providing bitumen joints as per drawing and specified interval. (Without
using paver machineries.) (C) For 7.50cms thick cast-in-citu canal lining in M-10 grade
of conc. with MSA-20mm incl providing pair of horizontal and transverse sleepers of
size 150x75mm and 3.0 mt c/c in c.c. M-10 grade concrete.
258 Providing and laying in position control cement concrete using cement, sand and 1.00 Sq. Mt..
crushed aggregate by mass and machine mix for C.C. work in canal lining including
necessary formwork centering scaffolding compaction by plate vibrator, curing as
directed with all lead and lift etc complete including dressing the bed and trimming the
canal section if required and minor filling with murrum / earth as per site condition to
the correct profile, including providing bitumen joints as per drawing and specified
interval. (without using paver machineries) (d) For 7.50 cms. thick cast-in-situ canal
lining in M-10 grade of conc. with MSA-20 mm without sleepers
259 Prov. & Laying in position Controlled cement concrete using cement, sand and crushed 1.00 Sq. Mt..
aggregate by mass and machine mix for C.C work in canal lining including necessary
formworks centering scaffolding compaction by plate vibrator,curing as directed with
all lead & lift etc complete incl dressing the bed and trimming the canal section if
required and minor filling with murrum / earth as per site condition to the correct
profile,incl providing bitumen joints as per drawing and specified interval. ( Without
using paver machineries.) (A) For 10cms thick cast-in-citu canal lining in M-15 grade
of conc.with MSA-20mm incl providing pair of horizontal and transverse sleepers of
size 150x75mm and 3.0 mt c/c in c.c. M-15 grade concrete.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
260 Prov. & Laying in position Controlled cement concrete using cement, sand and crushed 1.00 Sq. Mt..
aggregate by mass and machine mix for C.C work in canal lining including necessary
formworks centering scaffolding compaction by plate vibrator,curing as directed with
all lead & lift etc complete incl dressing the bed and trimming the canal section if
required and minor filling with murrum / earth as per site condition to the correct
profile,incl providing bitumen joints as per drawing and specified interval. (Without
using paver machineries.) (B) For 10cms thick cast-in-citu canal lining in M-15 grade
of conc.with MSA-20mm without sleepers.
261 Prov. & Laying in position Controlled cement concrete using cement, sand and crushed 1.00 Sq. Mt..
aggregate by mass and machine mix for C.C work in canal lining including necessary
formworks centering scaffolding compaction by plate vibrator,curing as directed with
all lead & lift etc complete incl dressing the bed and trimming the canal section if
required and minor filling with murrum / earth as per site condition to the correct
profile,incl providing bitumen joints as per drawing and specified interval. (Without
using paver machineries.) (C) For 7.50cms thick cast-in-citu canal lining in M-15 grade
of conc. with MSA-20mm incl providing pair of horizontal and transverse sleepers of
size 150x75mm and 3.0 mt c/c in c.c. M-15 grade concrete.
262 Providing and laying in position control cement concrete using cement, sand and 1.00 Sq. Mt..
crushed aggregate by mass and machine mix for C.C. work in canal lining including
necessary formwork centering scaffolding compaction by plate vibrator, curing as
directed with all lead and lift etc complete including dressing the bed and trimming the
canal section if required and minor filling with murrum / earth as per site condition to
the correct profile, including providing bitumen joints as per drawing and specified
interval. (without using paver machineries) (d) For 7.50 cms. thick cast-in-situ canal
lining in M-15 grade of conc. with MSA-20 mm without sleepers
263 Providing,supplying,cutting and fixing in position by spot welding,,10 SWG 1.00 Sq. Mt.
reinforcement cage of 1.5 kg per Sq. Mt. weight for RCC Trough with all lead and lift etc
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
264 Providing local stone or such other hard stone bela or block in course dressed sand 1.00 Cum.
stone /lime stone masonry in super structures incl striking out joints curing etc
complete as directed in C.M. 1:5
265 Providing motorable service road during construction period as directed with 1.00 K.M.
necessary earth work, jungle cutting and maintenance as required etc complete.
266 Providing, supplying at site, laying and fixing in position under ground R.C.C Hume 1.00 Rmt.
pipe of NP-2 class of BIS standard including filling the joints with cement mortar 1:1
with providing necessary collars etc complete with inclusive of testing with working
pressure and all lead and lift. (a) 150 mm dia.
267 Providing, supplying at site, laying and fixing in position under ground R.C.C Hume 1.00 Rmt.
pipe of NP-2 class of BIS standard including filling the joints with cement mortar 1:1
with providing necessary collars etc complete with inclusive of testing with working
pressure and all lead and lift. (b) 225 mm dia.
268 Providing, supplying at site, laying and fixing in position under ground R.C.C Hume 1.00 Rmt.
pipe of NP-2 class of BIS standard including filling the joints with cement mortar 1:1
with providing necessary collars etc complete with inclusive of testing with working
pressure and all lead and lift. (c) 300 mm dia.
269 Providing, supplying at site, laying and fixing in position under ground R.C.C Hume 1.00 Rmt.
pipe of NP-2 class of BIS standard including filling the joints with cement mortar 1:1
with providing necessary collars etc complete with inclusive of testing with working
pressure and all lead and lift. (d) 450 mm dia.
270 Providing, supplying at site, laying and fixing in position under ground R.C.C Hume 1.00 Rmt.
pipe of NP-2 class of BIS standard including filling the joints with cement mortar 1:1
with providing necessary collars etc complete with inclusive of testing with working
pressure and all lead and lift. (e) 600 mm dia.
271 Providing, supplying at site, laying and fixing in position under ground R.C.C Hume 1.00 Rmt.
pipe of NP-2 class of BIS standard including filling the joints with cement mortar 1:1
with providing necessary collars etc complete with inclusive of testing with working
pressure and all lead and lift. (f) 750/800 mm dia.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
272 Providing, supplying at site, laying and fixing in position under ground R.C.C Hume 1.00 Rmt.
pipe of NP-2 class of BIS standard including filling the joints with cement mortar 1:1
with providing necessary collars etc complete with inclusive of testing with working
pressure and all lead and lift. (g) 900 mm dia.
273 Providing, supplying at site, laying and fixing in position under ground R.C.C Hume 1.00 Rmt.
pipe of NP-2 class of BIS standard including filling the joints with cement mortar 1:1
with providing necessary collars etc complete with inclusive of testing with working
pressure and all lead and lift. (h) 1100 mm dia.
274 Providing, supplying at site, laying and fixing in position under ground R.C.C Hume 1.00 Rmt.
pipe of NP-2 class of BIS standard including filling the joints with cement mortar 1:1
with providing necessary collars etc complete with inclusive of testing with working
pressure and all lead and lift. (i) 1200 mm dia.
275 Providing, supplying at site, laying and fixing in position under ground R.C.C Hume 1.00 Rmt.
pipe of NP-2 class of BIS standard including filling the joints with cement mortar 1:1
with providing necessary collars etc complete with inclusive of testing with working
pressure and all lead and lift. (j) 1500 mm dia.
276 Providing & Laying in position non cohesive layers of locally available 1.00 Cum.
material(Selected soil) inclusive of required finishing & light compaction with all lead
277 Backfilling with appropriate excavated material behind the structure or refilling the 1.00 Cum.
trenches with excavated useful material including watering ramming consolidation etc.
complete with all lead & lift.
278 Earth work in embankment Using excavated stuff including spreading in uniform 1.00 Cum.
layers, breaking clods and dressing to design section for all sorts of soil and soft
murrum, hard murrum for different leads as under and all lifts above GL etc. complete
but without rolling and watering (a) Lead up to 200 Mt.
279 Earth work in embankment Using excavated stuff including spreading in uniform 1.00 Cum.
layers, breaking clods and dressing to design section for all sorts of soil and soft
murrum, hard murrum for different leads as under and all lifts above GL etc. complete
but without rolling and watering (b) Lead 200 to 1000 Mt..
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
280 Providing, supplying, Lowering, and laying ISI Standard R.C.C. NP-3 Class pipes in 1.00 Rmt.
standard lengths of following Diameter suitable for either collar joints or rubber ring
joints including all taxes, insurance, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to Site, and jointing in proper position, grade
and alignment at all level as directed by Engineer-in-charge including all labour, giving
hydraulic testing as per ISI code.
NOTE:- One collar should be supplied with each full length plain ended RCC pipe, cost
included in rates below. One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below. (C) 300mm dia.
281 Providing, supplying, Lowering, and laying ISI Standard R.C.C. NP-3 Class pipes in 1.00 Rmt.
standard lengths of following Diameter suitable for either collar joints or rubber ring
joints including all taxes, insurance, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to Site, and jointing in proper position, grade
and alignment at all level as directed by Engineer-in-charge including all labour, giving
hydraulic testing as per ISI code.
NOTE:- One collar should be supplied with each full length plain ended RCC pipe, cost
included in rates below. One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below. (D) 450mm dia.
282 Providing, supplying, Lowering, and laying ISI Standard R.C.C. NP-3 Class pipes in 1.00 Rmt.
standard lengths of following Diameter suitable for either collar joints or rubber ring
joints including all taxes, insurance, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to Site, and jointing in proper position, grade
and alignment at all level as directed by Engineer-in-charge including all labour, giving
hydraulic testing as per ISI code.
NOTE:- One collar should be supplied with each full length plain ended RCC pipe, cost
included in rates below. One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below. (E) 600mm dia.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
283 Providing, supplying, Lowering, and laying ISI Standard R.C.C. NP-3 Class pipes in 1.00 Rmt.
standard lengths of following Diameter suitable for either collar joints or rubber ring
joints including all taxes, insurance, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to Site, and jointing in proper position, grade
and alignment at all level as directed by Engineer-in-charge including all labour, giving
hydraulic testing as per ISI code.
NOTE:- One collar should be supplied with each full length plain ended RCC pipe, cost
included in rates below. One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below. (F) 750/800mm dia.
284 Providing, supplying, Lowering, and laying ISI Standard R.C.C. NP-3 Class pipes in 1.00 Rmt.
standard lengths of following Diameter suitable for either collar joints or rubber ring
joints including all taxes, insurance, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to Site, and jointing in proper position, grade
and alignment at all level as directed by Engineer-in-charge including all labour, giving
hydraulic testing as per ISI code.
NOTE:- One collar should be supplied with each full length plain ended RCC pipe, cost
included in rates below. One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below. (G) 900mm dia.
285 Providing, supplying, Lowering, and laying ISI Standard R.C.C. NP-3 Class pipes in 1.00 Rmt.
standard lengths of following Diameter suitable for either collar joints or rubber ring
joints including all taxes, insurance, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to Site, and jointing in proper position, grade
and alignment at all level as directed by Engineer-in-charge including all labour, giving
hydraulic testing as per ISI code.
NOTE:- One collar should be supplied with each full length plain ended RCC pipe, cost
included in rates below. One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below. (H) 1100mm dia.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
286 Providing, supplying, Lowering, and laying ISI Standard R.C.C. NP-3 Class pipes in 1.00 Rmt.
standard lengths of following Diameter suitable for either collar joints or rubber ring
joints including all taxes, insurance, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to Site, and jointing in proper position, grade
and alignment at all level as directed by Engineer-in-charge including all labour, giving
hydraulic testing as per ISI code.
NOTE:- One collar should be supplied with each full length plain ended RCC pipe, cost
included in rates below. One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below. (I) 1200mm dia.
287 Providing, supplying, Lowering, and laying ISI Standard R.C.C. NP-3 Class pipes in 1.00 Rmt.
standard lengths of following Diameter suitable for either collar joints or rubber ring
joints including all taxes, insurance, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to Site, and jointing in proper position, grade
and alignment at all level as directed by Engineer-in-charge including all labour, giving
hydraulic testing as per ISI code.
NOTE:- One collar should be supplied with each full length plain ended RCC pipe, cost
included in rates below. One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below. (J) 1400mm dia.
SPECIALISED ITEMS OF WORK
288 Providing 40 mm thick guniting in cement mortar (1:2) for spillway works by using 1.00 Sq. Mt.
guniting equipment and air compressor & accessories including finishing, curing etc.
comp. with cost of materials and labours but excluding cost of IRC fabric reinforcement
with all leads and lifts.
289 Providing and fixing in position I.R.C. Fabrics of mesh 6" x 6" &10 gauge, reinforcement 1.00 Sq. Mt.
with necessary nailing in position, overlap etc as directed with all lead and lift etc
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
290 Providing and placing in position by cranes/manual, mechanically doubly twisted 1.00 Sq. Mt.
highly galvanized, without PVC coating "GABIONS" of size mention below, made of
mesh size 10x12mm woven wire as per ASTMA-975-97 including providing and laying
stones of size not less than 25 kg in the gabions and arranging the same as instructed
in the breached section or such other locations/ structures,etc complete incl dressing
the slope,minor earth filling. 1.0x1.0x1.0 mt (Total weight=1664.00 Kg)
291 Providing and placing in position by cranes/manual, mechanically doubly twisted 1.00 Sq. Mt.
highly galvanized, without PVC coating "GABIONS" of size mention below, made of
mesh size 10x12mm woven wire as per ASTMA-975-97 including providing and laying
stones of size not less than 25 kg in the gabions and arranging the same as instructed
in the breached section or such other locations/ structures,etc complete incl dressing
the slope,minor earth filling. 1.0x1.0x0.6 mt (Total weight=999.00 Kg)
292 Providing and placing in position by cranes/manual, mechanically doubly twisted 1.00 Sq. Mt.
highly galvanized, without PVC coating "GABIONS" of size mention below, made of
mesh size 10x12mm woven wire as per ASTMA-975-97 including providing and laying
stones of size not less than 25 kg in the gabions and arranging the same as instructed
in the breached section or such other locations/ structures,etc complete incl dressing
the slope,minor earth filling.1.0x1.0x0.3 mt (Total weight=499.00 Kg)
293 Crack filling in RCC/PCC irrigation structure's components with epoxy based putty 1.00 Rmt.
including racking the cracks cleaning curing etc complete. Prime coat done with
material of Resin + Hardener mixing of BIS standard quality material & quality that
works in wetted condition. Pointing done with water plugging BIS Standard quality
material in first coat and after that second coat done with epoxy base putty of Resin+
Hardener mixing (1 part Resin+1 part Hardener + 8 part Silica). The rate includes cost
of materials labours scaffolding equipments etc.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
294 Nipple fixing including drilling the holes of diameter 22mm.( minimum 15mm internal 1.00 Nos.
diameter of nipples) and 20cm in depth in RCC/PCC irrigation structure's components
including fixing of nipple by applying prime coat done with BIS Standard quality
material of Resin + Hardener mixing material and quality that works in wetted
condition. Pointing done with water plugging BIS Standard quality material in first
coat and after that second coat done with epoxy base putty of Resin+ Hardener mixing
(1 part Resin+1 part Hardener +8 part Silica) and sealing the nipple hole with
appropriate material and process after grouting.
295 Grouting done by injection process in RCC/PCC irrigation structure's components 1.00 1.00 Kg of
through Nipples with pressure 3 to 7 kg/cm2 and as per instruction, with materials (1 dry
bag cement of 50 kg of 53 grade with Sika latex or FBR or equivalent quality 2Lit + Sika cement.
4A or equivalent quality 1Lit + FL 40 or equivalent quality 8kg + Fair add or Intra plast
or equivalent quality 400 grams with sufficient water for easy grout). The rate includes
cost of materials, labours scaffolding, equipments etc. and material to be used of BIS
296 Providing epoxy plaster 6 to 8 mm min. thickness including filling of all pot- 1.00 Sq. Mt.
holes/ditches with epoxy mortar up to req. depth by using resin: hardener: aggregates
confirming to IS-9162 in proportion 0.7:0.3:6.5,by weight on exposed damaged old
and rough surface of spillway/canal structure with proper application of necessary
primer coat of resin and hardener in proportion of 2:1 by weight confirming to IS-
9197 to give proper bond between old surface and epoxy plaster including necessary
cleaning, cheeping of old surface including scaffolding, tools bars for the job with
labour including all lead and lift etc complete in all condition dry and wet.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
297 OPEN WEAVE JUTE GEOTEXTILES (FOR RIVER BANK PROTECTION- COUNTRY SIDE)- 1.00 Sq. Mt.
500gsm Supplying, testing and installation of open weave jute geotextiles (JGT) having
overall weight of 500 gm/sqm, thickness 5 mm, width 1220 mm, no. of threads/dm=
6.5 x 4.5, tensile strength of 10 x 7.5 kN/m both in warp & weft direction on slopes of
embankments dressed & cut to a stable gradient for control of surface soil erosion,
duly secured to sub-grade by U-shaped m.s. staples (11 gauge) at an interval of
mm providing side lapping of 100 mm and horizontal lapping of 300 mm as per
direction complete. (Payment of this item will be made on the basis of finished area of
298 WOVEN JUTE GEOTEXTILES (FOR RIVER BANK PROTECTION- RIVER SIDE) 1.00 Sq. Mt.
Supplying, testing and installation of 100 cm wide woven jute geotextiles (JGT)
gm/sqm with treatment possessing tensile strength of 20 kN/m both in MD and CD
with a porometry range of 150-400 micron, no. of threads/dm= 85 x 32, Elongation at
break (%)= 8 x 8, Permittivity at 50cm water head (Sec-1)= 350 x 10-3 , Puncture
resistance (kN)= 0.400, JGT will be treated with suitable eco-friendly additive. Jute
fabric will be laid with overlaps of 100 mm cross-wise and 300 mm longitudinally duly
secured by U-shaped m.s. staples (11 gauge)/ round head country nail of 150 mm
length at an interval of 750 mm as per direction of the Engineer-in-Charge. (Payment
of this item will be made on the basis of finished area of JGT)
299 Clearing silt from canal/drain bed by digging the same to the required bed level and 1.00 Cum.
gradient including depositing the excavated earth regularly in spoil bank for utilizing
the same for preparing the bund after breaking clods as and where directed for lead up
to 30 Mt. & lift as under (Excluding weed cutting) (a) depth 0 to 3.0 Mt.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
300 Clearing silt from canal, drain bed by digging the same to the required bed level and 1.00 Cum.
gradient including depositing the excavated earth regularly in spoil bank for utilizing
the same for preparing the bund after breaking clods as and where directed for lead up
to 30 Mt. & lift as under (Excluding weed cutting) (b) depth 3.0 to 6.0 Mt.
301 Clearing silt from canal, drain bed by digging the same to the required bed level and 1.00 Cum.
gradient including depositing the excavated earth regularly in spoil bank for utilizing
the same for preparing the bund after breaking clods as and where directed for lead up
to 30 Mt. & lift as under (Excluding weed cutting) (c) depth 6.0 Mt to 9.0 Mt
302 Clearing silt from canal, drain bed by digging the same to the required bed level and 1.00 Cum.
gradient including depositing the excavated earth regularly in spoil bank for utilizing
the same for preparing the bund after breaking clods as and where directed for lead up
to 30 Mt. & lift as under (Excluding weed cutting) (d) For every additional lift 3.00 Mt.
303 Clearing the shrubs like Akadas, weeds & other vegetation including depositing the 1.00 K.M.
same out side and buring etc. complete from canal bed and both side slopes and upto
outer toe of the banks. (For Canal and drains) (A) Up to 0.56 cumecs
304 Clearing the shrubs like Akadas, weeds & other vegetation including depositing the 1.00 K.M.
same out side and buring etc. complete from canal bed and both side slopes and upto
outer toe of the banks.(For Canal and drains) (B) above 0.56 to 7.00 cumecs
305 Clearing the shrubs like Akadas, weeds & other vegetation including depositing the 1.00 K.M.
same outside and burning etc. complete from canal bed and both side slope and up to
outer toe of the banks. (For Canal and drains) (C) Above 7 cumecs
306 Desilting of various structures of canal and distribution system including depositing 1.00 Cum.
the same as directed with all lifts and lead for canal syphone, air-vent, Turn Out
Kundies etc. complete.
307 Providing and fixing 20mm dia. M.S. Bar 1.0 Mt. long for steps in canal structures 1.00 Nos.
including cutting, bending, fixing and painting etc complete.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
308 Jungle clearance of specified category and bushes for canal/dam work as directed with 1.00 Sq. Mt.
depositing materials etc. complete. (Excluding tree of girth above 0.5 Mt.) (A) Up to
Year old. (a) For Light Dense
309 Jungle clearance of specified category and bushes for canal/dam work as directed with 1.00 Sq. Mt.
depositing materials etc. complete. (Excluding tree of girth above 0.5 Mt.) (A) Up to
Year old. (b) For Medium Dense
310 Jungle clearance of specified category and bushes for canal/dam work as directed with 1.00 Sq. Mt.
depositing materials etc. complete. (Excluding tree of girth above 0.5 Mt.) (A) Up to
Year old. (c) For Heavy Dense
311 Jungle clearance of specified category & bushes for canal/dam work as directed with 1.00 Sq. Mt.
depositing materials etc. comp.(Excluding tree of girth above 0.5 Mt.)(B) More than
years old. (a) For Light Dense
312 Jungle clearance of specified category and bushes for canal/dam work as directed with 1.00 Sq. Mt.
depositing materials etc. comp. (Excluding tree of girth above 0.5 Mt.) (B) More than
years old. (b) For Medium Dense
313 Jungle clearance of specified category and bushes for canal/dam work as directed with 1.00 Sq. Mt.
depositing materials etc. comp. (Excluding tree of girth above 0.5 Mt.) (B) More than
years old. (c) For Heavy Dense
314 Maintenance of earthen dam by Cleaning the slope of E.dam within the dam boundary 1.00 Sq. Mt.
incl. gutter (Drains) by removing the bushes, shrubs, girth and small trees including per year.
depositing the materials as and where directed up to 50 Mt. lead and all lift etc
complete.( Throughout the year)
315 Spreading the murrum in uniform layer with all lift & as & where directed etc. 1.00 Cum.
316 Filling the empty bag filled with good selected earth or sand including stitching 1.00 No.
and laying or stacking as and where directed with all lead and lift etc. complete.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
317 Painting two coats of Black epoxy paint one intermediate coat of 150 micron thickness 1.00 Sq. Mt.
and one finishing coat of 150 micron thickness over two coats of zinc rich primer
(Grade-II) of total thickness of 70 micron including, cleaning the surface with sand
blasting and cleaning all dirt, dust, old paint corrosion etc complete with all material
labour tools, consumables, scaffolding etc for skin plat of gates and its embedded parts
and /or as directed by engineer in charge (Full scheduled coat painting)
318 Providing & Fixing H.R. & C.R. gates for canal including all materials , labours, 1.00 Kg.
fabrication transporting fixing to site of work all lead & lift including one coat of
primer and two coats of oil painting as directed including square threaded screw,
bearing, nuts, handles, and locking arrangements etc. complete.
319 Cleaning the canal bed and both side slopes (in muddy condition) scrapping out the 1.00 Sq. Mt.
shovel, pine, luies, Kadusalo and other vegetation by means of manual including silt
and depositing the same up to lead of 30 Mt. and all lift etc. complete.
320 Earth work in embankment from borrow pits in all sorts of soil and soft murrum 1.00 Cum.
including spreading, braking clods, dressing to design section with lead up to 50 Mt.
and all height of embankment above G.L. for isolated works, repair works and manual
works ( for emergency situation only)
321 Providing Fixing mild steel grill over canal syphone well etc. with 50*50*5mm angle 1.00 Sq. Mt.
with 16mmdia. M.S. bars at 20 cm c/c both way with one window size 60cm * 60cm
with two hinges and locking arrangement The grill shell be fixed in masonry or
concrete wall with minimum 10 cm over lap.including applying one coat of primer and
two coats of epoxy paint as directed. The item shell be measured for clear visible
dimension of the grill.
322 Providing murrum including spreading the same and dressing the side slopes and top 1.00 Cum.
surface in required grade and camber with lead up to 5.0 K.M. and all lifts etc.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
323 Strengthening and repairing to cracks in masonry and concrete structures of dam like 1.00 One Kg of
waste weir H.R. piers, bridge, etc. by injecting neat epoxy resin and hardeners in ratio epoxy
2:1 under pressure 3 to 7 kg/cm2 pointing with silica motors with proportation in material.
(1:1/2:6 (1 Resin, 1/2 hardener and 6 Silica) etc complete.
324 Providing dry rubble masonry as per requirement including hand packing filling with 1.00 Cum.
chips etc. completed.
325 Cutting down trees of different girth (periphery) to be measured at 1.00 Mt. above 1.00 No.
ground level including rubbing and removing the roots completely and back filling
with earth and compaction including depositing the material as and where directed up
to lead of 500.00 Mt. etc. complete. (a). 30 cm to 50 cm.
326 Cutting down trees of different girth (periphery) to be measured at 1.00 Mt. above 1.00 No.
ground level including rubbing and removing the roots completely and back filling
with earth and compaction including depositing the material as and where directed up
to lead of 500.00 Mt. etc. complete. (b). 50 cm to 75 cm.
327 Cutting down trees of different girth (periphery) to be measured at 1.00 Mt. above 1.00 No.
ground level including rubbing and removing the roots completely and back filling
with earth and compaction including depositing the material as and where directed up
to lead of 500.00 Mt. etc. complete. (c). 75 cm to 100 cm.
328 Cutting & removing green water grass (pine) with silt under slushy condition 1.00 Sq. Mt.
from canal bed or bucket including dispose off and cleaning the surface including
removal of silt, debris etc for all lead & lift etc complete as directed.
329 Clearing Slushy soil and mud including silt, boulders, grass etc. from canal bed 1.00 Cum.
depositing under water lifting out the same from deep canal section by mechanical
means or other equipment, including depositing the lifted material in spoil bank as and
where directed for lead up to 30 Mt. etc. complete. (a) Depth 0.0 to 3.0 Mt.
330 Clearing Slushy soil and mud including silt, boulders, grass etc. from canal bed 1.00 Cum.
depositing under water lifting out the same from deep canal section by mechanical
means or other equipment, including depositing the lifted material in spoil bank as and
where directed for lead up to 30 Mt. etc. complete. (b) Depth Additional 3.0 Mt.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
331 Providing and fixing guard stone of precast C.C. M-15 IRC standard design 75 x 20 x 1.00 No.
20 cm. including white washing etc. complete. (a) In Earth
332 Providing and fixing Boundary stone of precast C.C. M-15 IRC standard design 75 x 20 1.00 No.
x 20 cm. including white washing etc. complete. (a) In Earth
333 Providing and fixing ordinary Kilometre stone of precast C.C. 1:2:4 including necessary 1.00 No.
reinforcement as per I.R.C. type design in C.C. 1:4:8 including painting, lettering etc.
complete (For O.D. road V.R.)
334 Jungle clearance (Ganda Baval etc) of Light /heavy dense (work done by manually or 1.00 Sq. Mt.
by machinery ) including grabbing of & removing the roots & girth completely from
the ground & back fill with earth & making surface good as directed including
depositing & removing the material away from the site of work at own risk and cost as
and where directed etc completed for following. (a) Light density
335 Jungle clearance (Ganda Baval etc) of Light /heavy dense (work done by manually or 1.00 Sq. Mt.
by machinery ) including grabbing of & removing the roots & girth completely from
the ground & back fill with earth & making surface good as directed including
depositing & removing the material away from the site of work at own risk and cost as
and where directed etc completed for following. (b) Heavy density
336 Clearing the canal by cleaning/removing the thick weed, shrubs and all other 1.00 K.M.
vegetations including silt up to 10 cm thickness, stones, debris etc from canal bed and
side slope of canal up to outer toe of canal bank and disposing as directed. (a) For
canal capacity up to 2.00 cusecs.
337 Clearing the canal by cleaning/removing the thick weed, shrubs and all other 1.00 K.M.
vegetations including silt up to 10 cm thickness, stones, debris etc from canal bed and
side slope of canal up to outer toe of canal bank and disposing as directed. (b) For
canal capacity from 2.00 to 5.0 cusecs.
338 Clearing the canal by cleaning/removing the thick weed, shrubs and all other 1.00 K.M.
vegetations including silt up to 10 cm thickness, stones, debris etc from canal bed and
side slope of canal up to outer toe of canal bank and disposing as directed. (c) For
canal capacity from 5.0 to 10.0 cusecs.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
339 Clearing the canal by cleaning/removing the thick weed, shrubs and all other 1.00 K.M.
vegetations including silt up to 10 cm thickness, stones, debris etc from canal bed and
side slope of canal up to outer toe of canal bank and disposing as directed. (d) For
canal capacity from 10.0 to 25.0 cusecs.
340 Clearing the canal by cleaning/removing the thick weed, shrubs and all other 1.00 K.M.
vegetations including silt up to 10 cm thickness, stones, debris etc from canal bed and
side slope of canal up to outer toe of canal bank and disposing as directed. (e) For
canal capacity from 25.0 to 50.0 cusecs.
341 Clearing the canal by cleaning/removing the thick weed, shrubs and all other 1.00 K.M.
vegetations including silt up to 10 cm thickness, stones, debris etc from canal bed and
side slope of canal up to outer toe of canal bank and disposing as directed. (f) For canal
capacity from 50.0 to 100.0 cusecs.
342 Clearing the canal by cleaning/removing the thick weed, shrubs and all other 1.00 K.M.
vegetations including silt up to 10 cm thickness, stones, debris etc from canal bed and
side slope of canal up to outer toe of canal bank and disposing as directed. (g) For
canal capacity from 100.0 to 200.0 cusecs.
343 Clearing the canal by cleaning/removing the thick weed, shrubs and all other 1.00 K.M.
vegetations including silt up to 10 cm thickness, stones, debris etc from canal bed and
side slope of canal up to outer toe of canal bank and disposing as directed. (h) For
canal capacity from 200.0 to 300.0 cusecs.
344 Clearing the canal by cleaning/removing the thick weed, shrubs and all other 1.00 K.M.
vegetations including silt up to 10 cm thickness, stones, debris etc from canal bed and
side slope of canal up to outer toe of canal bank and disposing as directed. (i) For canal
capacity from 300.0 to 400.0 cusecs.
345 Clearing the canal by cleaning/removing the thick weed, shrubs and all other 1.00 K.M.
vegetations including silt up to 10 cm thickness, stones, debris etc from canal bed and
side slope of canal up to outer toe of canal bank and disposing as directed. (j) For canal
capacity from 400 cusecs and above.
346 Removing old M.S. steel plate by gas cutter and providing new M.S. plate of required 1.00 Kg.
size and thickness and fixing it in proper position by welding etc. complete with
cleaning, finishing, gridding and two coat of anti corrosive primer and epoxy paint as
per existing surrounding area.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
347 Providing 'fiber glass reinforced plastic' gauge plate of 4mm thickness and of following 1.00 Rmt.
size with Engraving/pesting bands & figures of following size with necessary clips and
fastners and fixing the same at the site of work etc complete
as directed including scrubbing the wall surface to remove the deposits gathered at
gauge plate by chiseling where required. As per drawing Width of plate 30cm., Band
width 1.0cm. Column width 1.0cm., Height of figures 7.0cm.
348 Cleaning of the spillway gates, leaf arms, tonion and it’s assembly, foot bridge, DHU etc. 1.00 Gate Per
ones per month, throughout the year with necessary material, equipment, scaffolding Year.
etc. complete. Radial Gate size 9.14 x 6.10 Mt. (30’ x 20’)
349 Cleaning of the spillway gates, leaf arms, tonion and it’s assembly, foot bridge, DHU etc. 1.00 Gate Per
ones per month, throughout the year with necessary material, equipment, scaffolding Year.
etc. complete. Vertical Gate size 9.10 x 3.05 Mt. (30’ x 10’)
350 Excavation for deepening of pond/check dam including depositing excavated material 1.00 Cum.
Lead up to 1 Km. With all lift.etc complited as per instruction of engineer in charge.
351 Providing services for security of canal system and maintaining smoothly irrigation 1.00 Ha/Day
water distribution including operating canal regulators and outlets in suitable
shifts/round the clock as per instruction of Engineer-in-charge.
352 Cleaning of the honey comb / Female wasp from dam, spillway gates, its assembly, foot 1.00 No.
bridge, platform, H.R. gates, and canal structures and buildings and any other
structures one time of honey comb one no.
353 Labour charges for the pre-monsoon clearing, servicing, grease, and replacing oil 1.00 Gate Per
C.D.U., E.R.U. mechanism turn bukle trunion, roller, side roller, guide roller, D.H.U. gear Year
boxes, turnion buckets hoist mechanism etc. all other movable parts for the spillway
gates size 30' x 20' & D.H.U. unit and replacing cardium compound to wire rope etc.
complete for Spillway gates. Radial Gate size 9.14 x 6.10 (30' x 20')
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
354 Labour charges for the pre-monsoon clearing, servicing, grease, and replacing oil 1.00 Gate Per
C.D.U., E.R.U. mechanism turn bukle trunion, roller, side roller, guide roller, D.H.U. gear Year
boxes, turnion buckets hoist mechanism etc. all other movable parts for the spillway
gates size 30' x 10' & D.H.U. unit and replacing cardium compound to wire rope etc.
complete for Spillway gates. Vertical Gate size 9.10 x 3.05 (30' x 10')
355 Labour charges for cleaning, servicing and applying grease to stem rod with clams, 1.00 Gate Per
screw rod, gear box with replacing oil and all other movable parts for H.R. gate all size Year
etc. complete. For H.R.gates
356 Labour charges for cleaning of maholes including disilting, removing grass, 1.00 Nos per
clearing inlet and outlet pipe in manhole including depositing the materials as year
and where directed up to 50 mt. lead and all lift etc. complete. (Throughout
357 Providing & Supplying of Empty Cement Bag at site. 1.00 Nos.
DEMOLITION WORK
358 Dismantling road surface including sorting & Stacking of useful and unuseful material 1.00 Cum.
from the dismantled materials as directed under detailed specification etc complete.(a)
Cement Concrete
359 Dismantling road surface including sorting & Stacking of useful and unuseful material 1.00 Cum.
from the dismantled materials as directed under detailed specification etc
complete.(b) Asphalt including W.B.M.
360 Dismantling road surface including sorting & Stacking of useful and unuseful material 1.00 Cum.
from the dismantled materials as directed under detailed specification etc complete.
361 Dismantling road surface including sorting & Stacking of useful and unuseful material 1.00 Cum.
from the dismantled materials as directed under detailed specification etc
complete.(d) Metal
362 Dismantling stone/brick masonry and stacking of useful and un-useful material from 1.00 Cum.
the dismantled materials as directed etc complete (a) in cement mortar.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
363 Dismantling stone/brick masonry and stacking of useful and un-useful material from 1.00 Cum.
the dismantled materials as directed etc complete (a) in lime mortar
364 Dismantling riprap pitching, sorting and stacking of useful and un-useful materials 1.00 Sq. Mt.
from the dismantled materials in lead up to 200 Mt. As directed etc complete. (a)
cm thick pitching with filter
365 Dismantling riprap pitching, sorting and stacking of useful and un-useful materials 1.00 Sq. Mt.
from the dismantled materials in lead up to 200 Mt. As directed etc complete. (b)
cm thick pitching with filter
366 Dismantling C.C. foundation or flooring sorting and stacking useful and unuseful 1.00 Cum.
material in lead up to 200 Mt. as directed etc comp.
367 Removing plaster including racking out joints 20mm deep etc complete (a) Cement 1.00 Sq. Mt.
368 Removing plaster including racking out joints 20mm deep etc complete (b) Lime 1.00 Sq. Mt.
369 Removing cement pointing including racking out joints 20mm deep etc complete. 1.00 Sq. Mt.
370 Dismantling of RCC work viz. slab, beam, lintel, barrel, satire case, etc including 1.00 Cum.
removing the steel from the dismantled portion without damage to reinforcement
sorting and stacking of useful and un-useful material from the dismantled material as
directed etc comp.
371 Removing the damaged precast CC block lining including breaking the joints, removing 1.00 Sq. Mt.
the same sorting and stacking of useful and unuseful material in measureable
conditions from the dismantled material upto lead of 200mt as directed Up to 7.50 cm
thick incl all.
372 Dismantling the rubble pitching including sorting out stacking of useful materials at 1.00 Sq. Mt.
site upto lead 200 mt.measureable conditions including removing the rubbish as
directed etc. complete.(a) 23 cm thick pitching
373 Dismantling the rubble pitching including sorting out stacking of useful materials at 1.00 Sq. Mt.
site upto lead 200 mt.measureable conditions including removing the rubbish as
directed etc. complete.(b) 30 cm thick pitching
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
374 Dismantling the rubble pitching including sorting out stacking of useful materials at 1.00 Sq. Mt.
site upto lead 200 mt.measureable conditions including removing the rubbish as
directed etc. complete.(c) 45 cm thick pitching
375 Dismantling the rubble pitching including sorting out stacking of useful materials at 1.00 Sq. Mt.
site upto lead 200 mt.measureable conditions including removing the rubbish as
directed etc. complete.(d) 60 cm thick pitching
376 Dismantling the existing RCC pipes including sorting out and stacking of the useful 1.00 Rmt.
material (pipe) measureable conditions up to lead 200 Mt. as directed under the
specification. (i) 255 mm to 400 mm diameter.
377 Dismantling the existing RCC pipes including sorting out and stacking of the useful 1.00 Rmt.
material (pipe) measureable conditions up to lead 200 Mt. as directed under the
specification. (ii) 450 mm to 600 mm diameter.
378 Dismantling the existing RCC pipes including sorting out and stacking of the useful 1.00 Rmt.
material (pipe) measureable conditions up to lead 200 Mt. as directed under the
specification. (iii) 650 mm to 900 mm diameter.
379 Dismantling the existing RCC pipes including sorting out and stacking of the useful 1.00 Rmt.
material (pipe) measureable conditions up to lead 200 Mt. as directed under the
specification. (iv) 1000 mm to 1200 mm diameter.
380 Surveying by TOTAL STATION including measuring of alingment of earthan dam/canal 1.00 K.M.
and creating the cross section and longitudinal section profile at 30mt interval/or
closer as directe and plotting etc complete.The survey work shall be carried out for
150mt distance on both side.
381 Supplying of rubble at work site 1.00 Cum.
382 Providing Skilled Labour Services for Emergency Works on Dam & Canal Sites. 1.00 Man Day
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
383 Providing Un-Skilled Labour Services for Emergency Works on Dam & Canal Sites. 1.00 Man Day
384 Hire charges for JCB - 80 excavator machine( Rate including operator + consumable + 1.00 Hrs.
fuel) etc complete
385 Hire charges for tractor with trailer (40 BHP and 3.0 cum capacity) Rate including 1.00 Hrs.
operator + consumable + fuel) etc complete
386 Hire charges for cranes (Calls) including fuel charges oil and all necessary materials for 1.00 Hours
lifting gates including loading and unloading for spillway with operator, cleaner and
including all taxes and insurance etc complete. (a) Cranes (Calls)
387 Cleaning The Roller Bucket in muddy condition by means of manual including Silt and 1.00 Cum.
depositing the same with all lead & lift etc complete.
Signature of Contractor Executive Engineer
Junagadh Irrigation Project Division.
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Item Description of S.O.R. Item Quantity Unit Estimated Rate As per Sanction Reg. S.O.R.
No. 2024-25 (Without GST) in Rs.
I am/we are willing to carry out the work at ......... % above / below ….. % (Should be written in figures and words) of the estimated rates mentioned above.
Amount of my / our Tender works out as under :-
Estimated amount put to tender Rs. Estimated amount put to tender Rs.
Deduct ……..% below Add. .........................% above
Note-1:- The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment
Note-2:- The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note-3:- GST and Income tax TDS will be deducted at a source while making payments of bills
Note-4:- In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated
in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of contractor Executive Engineer
Junagadh Irrigation Project Division
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Junagadh Irrigation Project Division,
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Nine Thousand Three
Hundred Thirty Two Only
Rupees Forty One Only
Rupees Seventy Nine Only
Rupees One Hundred Seventy
Rupees Five Hundred Ninety
Rupees Six Hundred Fifty Two
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Eighty Four Only
Rupees One Hundred Sixteen
Rupees One Hundred Sixteen
Rupees One Hundred Sixteen
Rupees Twenty One & Paise
Rupees Five Hundred Thirty
Rupees Thirteen & Paise
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Fifteen & Paise Thirty
Rupees Five Hundred Sixty
Rupees Seven Hundred Sixty
Rupees Nine Hundred Twenty
Rupees Five Hundred Twenty
Rupees Seven Hundred Twenty
Rupees Eight Hundred Seventy
Rupees Two Hundred Thirty
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Two Hundred Ninety
Rupees One Hundred Seventy
Rupees Two Hundred Fifty
Rupees Three Hundred Forty
Rupees Four Hundred Twenty
Rupees Five Hundred Forty
Rupees Eight Hundred Thirty
Rupees One Thousand Eighty
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Nine Hundred Forty
Rupees Eight Hundred Thirty
Rupees Seven Hundred Twenty
Rupees Five Hundred Eighty
Rupees Three Thousand Five
Hundred Eighty Five Only
Rupees Two Thousand Eighty
Rupees Five Hundred Thirty
Rupees Six Hundred Thirty
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees One Thousand Eighty
Rupees Five Thousand Three
Hundred Ninety Eight Only
Rupees Five Hundred Eighty
Rupees One Thousand Seven
Hundred Sixty Four Only
Rupees One Thousand Five
Hundred Eighty Six Only
Rupees Two Thousand Nine
Hundred Sixty Nine Only
Rupees Two Thousand Five
Hundred Ninety Eight Only
Rupees Twenty Seven Only
Rupees Eight & Paise Ninety
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Thirty Two Thousand
Two Hundred Seventeen Only
Rupees Eight Hundred Twenty
Rupees Sixty Six & Paise Fifty
Rupees Two Thousand Forty
Rupees One Thousand Two
Hundred Ninety Six Only
Rupees Fifty Seven Only
Rupees Fifty Eight Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Fifty Nine & Paise Fifty
Rupees One Hundred Forty
Rupees Eight & Paise Ninety
Rupees Three Thousand Eighty
Rupees Two Thousand Nine
Hundred Forty Five Only
Rupees Three Thousand Five
Hundred Forty Four Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Three Thousand Two
Hundred Fifty Two Only
Rupees Two Thousand Six
Hundred Forty Six Only
Rupees Two Thousand Nine
Hundred Nine Only
Rupees Four Thousand Three
Hundred Sixty Nine Only
Rupees Four Thousand Twenty
Rupees Four Thousand Seven
Hundred Twenty Nine Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Four Thousand Five
Hundred Thirty Four Only
Rupees Four Thousand Six
Hundred Seventy Three Only
Rupees Four Thousand Four
Hundred Seventy Eight Only
Rupees Four Thousand Eight
Hundred Ninety Only
Rupees Four Thousand Six
Hundred Ninety Six Only
Rupees Four Thousand Seven
Hundred Twenty Nine Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Four Thousand Five
Hundred Thirty Four Only
Rupees Four Thousand Nine
Hundred Forty Six Only
Rupees Four Thousand Seven
Hundred Fifty Two Only
Rupees Five Thousand One
Hundred Three Only
Rupees Four Thousand Eight
Hundred Ninety Two Only
Rupees Five Thousand Three
Hundred Thirty Nine Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Five Thousand One
Hundred Twenty Eight Only
Rupees Five Thousand Five
Hundred Forty Nine Only
Rupees Five Thousand One
Hundred Fifty Three Only
Rupees Five Thousand Seven
Hundred Three Only
Rupees Five Thousand Three
Hundred Eighty Nine Only
Rupees Three Thousand Three
Hundred Forty Six Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Three Thousand Two
Hundred Six Only
Rupees Three Thousand Eight
Hundred Twenty Two Only
Rupees Three Thousand Five
Hundred Twenty Two Only
Rupees Four Thousand Four
Hundred Fifty Eight Only
Rupees Four Thousand One
Hundred Thirty Eight Only
Rupees Fifty Eight Thousand
Five Hundred Eighty One Only
Rupees Seventy Five Thousand
Seven Hundred Eighty Nine
Rupees Sixty Six Thousand
Two Hundred Sixty Eight Only
Rupees Seventy Six Thousand
Five Hundred Seventy Four
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Ninety Five Thousand
Six Hundred Seventeen Only
Rupees Two Thousand Seven
Hundred Seven Only
Rupees Three Thousand Two
Hundred One Only
Rupees Five Thousand Five
Hundred Seven Only
Rupees Four Thousand Eight
Hundred Seventy Seven Only
Rupees Five Thousand One
Hundred Forty Six Only
Rupees Two Hundred Sixty
Rupees Two Hundred Sixty
Rupees Two Hundred Sixteen
Rupees Two Hundred Twenty
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees One Hundred Eighty
Rupees One Hundred Eighty
Rupees One Hundred Fifty One
Rupees One Hundred Fifty
Rupees Two Hundred Seventy
Rupees Two Hundred Eighty
Rupees Five Hundred Eleven
Rupees One Hundred Thirty
Rupees One Hundred Forty
Rupees One Hundred Forty
Rupees One Hundred Forty
Rupees One Thousand One
Hundred Forty Nine Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Six Hundred Sixty Nine
Rupees Two Hundred Sixteen
Rupees One Thousand One
Hundred Sixty Eight Only
Rupees Six Hundred Sixty Nine
Rupees One Hundred Twenty
Rupees One Hundred Twenty
Rupees One Thousand Six
Hundred Forty Only
Rupees Three Hundred Eighty
Rupees Four Hundred Seventy
Rupees Eight Hundred Forty
Rupees One Thousand Nine
Hundred Sixty Two Only
Rupees Five Hundred Five Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Five Hundred Thirty
Rupees Nineteen Thousand
Rupees One Thousand Nine
Hundred Forty Two Only
Rupees One Hundred Forty
Rupees Three Hundred Fifty
Rupees One Thousand Two
Hundred One Only
Rupees One Thousand Five
Hundred Twenty Nine Only
Rupees Seven Hundred Two
Rupees Fifty Nine Thousand
Five Hundred Fifty Eight Only
Rupees Twelve Thousand One
Hundred Sixty Five Only
Rupees Twenty Seven Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees One Thousand Three
Hundred Thirty Eight Only
Rupees Eight & Paise Ninety
Rupees Five Thousand Four
Hundred Sixty Seven Only
Rupees Five Thousand Seventy
Rupees Five Thousand Six
Hundred Eighteen Only
Rupees Five Thousand Three
Hundred Nine Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Five Thousand Six
Hundred Sixty Six Only
Rupees Five Thousand Two
Hundred Seventy Only
Rupees Five Thousand Eight
Hundred Twenty Only
Rupees Five Thousand Five
Hundred Six Only
Rupees Five Thousand Seven
Hundred Sixty Six Only
Rupees Five Thousand Three
Hundred Fifty Five Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Five Thousand Nine
Hundred Twenty Six Only
Rupees Five Thousand Five
Hundred Ninety Nine Only
Rupees One Thousand Four
Hundred Sixty Only
Rupees One Thousand Five
Hundred Twenty Two Only
Rupees Four Thousand Five
Hundred Forty Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Four Thousand Six
Hundred Sixty Only
Rupees Four Thousand Nine
Hundred Thirty Seven Only
Rupees Five Thousand Eighty
Rupees Two Hundred Seventy
Rupees Six Hundred Thirty
Rupees One & Paise Twenty
Rupees One Thousand Four
Hundred Eleven Only
Rupees Two Thousand Four
Hundred Sixteen Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Four Thousand Six
Hundred One Only
Rupees Four Thousand Three
Hundred Five Only
Rupees Five Thousand Thirty
Rupees Four Thousand Six
Hundred Sixty Six Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Four Thousand Seven
Hundred Ninety Two Only
Rupees Four Thousand Four
Hundred Eighty Five Only
Rupees Five Thousand Two
Hundred Forty One Only
Rupees Four Thousand Eight
Hundred Sixty One Only
Rupees Four Thousand Three
Hundred Twenty One Only
Rupees Four Thousand Nine
Hundred Forty Two Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Seven Thousand One
Hundred Ninety Four Only
Rupees Five Hundred Thirteen
Rupees Five Hundred Eighty
Rupees Ten Thousand One
Hundred Seventy Six Only
Rupees Two Thousand One
Hundred Forty Two Only
Rupees One Thousand One
Hundred Thirteen Only
Rupees Two Lac Eighty
Thousand Thirty Five Only
Rupees Two Hundred Sixty Six
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Two Thousand Eight
Hundred Twenty Nine Only
Rupees Two Thousand Six
Hundred Forty Six Only
Rupees Two Thousand Nine
Hundred Forty Six Only
Rupees Two Thousand Eight
Hundred Six Only
Rupees Three Thousand Four
Hundred Twenty Three Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Three Thousand One
Hundred Twenty Three Only
Rupees Three Thousand Four
Hundred Sixty Five Only
Rupees Three Thousand One
Hundred Sixty Five Only
Rupees One Hundred Sixty Six
Rupees Seven Hundred Sixty
Rupees One Hundred Eighty
Rupees One Thousand Three
Hundred Fifty Only
Rupees One Hundred Sixty
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Ninety Eight & Paise
Rupees Four Hundred Only
Rupees Two Hundred Fifty
Rupees Two Thousand Seven
Hundred Sixty Two Only
Rupees Eighty Three Only
Rupees One Hundred Eighty
Rupees Five Hundred Ninety
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Six Hundred Sixty One
Rupees Ninety Three Only
Rupees One Hundred Eighty
Rupees Six Hundred Twenty
Rupees Six Hundred Ninety
Rupees Ninety Five Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees One Hundred Ninety
Rupees Six Hundred Thirty
Rupees Six Hundred Ninety
Rupees Seventy Five Only
Rupees Seventy Six Only
Rupees Seventy Eight Only
Rupees Twenty Five & Paise
Rupees Eight Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Thirteen & Paise Eighty
Rupees One Hundred Sixty
Rupees Three Thousand Ninety
Rupees Three Thousand Two
Hundred Seventy Seven Only
Rupees Three Thousand One
Hundred Thirty Nine Only
Rupees Three Thousand Eight
Hundred Sixteen Only
Rupees Three Thousand Five
Hundred Sixteen Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Four Thousand Four
Hundred Fifty Two Only
Rupees Four Thousand One
Hundred Thirty Two Only
Rupees Four Thousand Three
Hundred Three Only
Rupees Four Thousand Thirty
Rupees Four Thousand Six
Hundred Ninety Eight Only
Rupees Four Thousand Three
Hundred Sixty Three Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Five Thousand Three
Hundred Seventy Two Only
Rupees Five Thousand Eighty
Rupees Five Thousand Two
Hundred Thirty Only
Rupees Four Thousand Eight
Hundred Sixty Five Only
Rupees Five Thousand Two
Hundred Sixty Seven Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Four Thousand Nine
Hundred Seventy Seven Only
Rupees Five Thousand One
Hundred Twenty Five Only
Rupees Four Thousand Seven
Hundred Sixty Only
Rupees One Thousand Four
Hundred Sixty Only
Rupees One Thousand Five
Hundred Twenty Two Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Four Thousand Seven
Hundred Sixty Six Only
Rupees Five Thousand One
Hundred Fifty Seven Only
Rupees Four Thousand Nine
Hundred Twelve Only
Rupees Five Thousand Forty
Rupees Five Thousand One
Hundred Twenty Five Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Four Thousand Seven
Hundred Sixty Only
Rupees Five Thousand Two
Hundred Sixty Seven Only
Rupees Four Thousand Nine
Hundred Seventy Seven Only
Rupees Five Thousand Four
Hundred Forty Eight Only
Rupees Five Thousand Sixty
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Five Thousand Five
Hundred Ninety Six Only
Rupees Five Thousand Two
Hundred Fifty Five Only
Rupees Five Thousand Seven
Hundred Sixty Six Only
Rupees Five Thousand Nine
Hundred Twenty Six Only
Rupees Five Thousand Seven
Hundred Sixty Six Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Five Thousand Nine
Hundred Twenty Six Only
Rupees Four Thousand Five
Hundred Forty Only
Rupees Four Hundred Seven
Rupees Three Hundred Ninety
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Three Hundred Thirty
Rupees Three Hundred One
Rupees Four Hundred Sixty
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Four Hundred Forty
Rupees Three Hundred Seventy
Rupees Three Hundred Forty
Rupees Eighty Nine Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Three Thousand Nine
Hundred Twenty Six Only
Rupees Thirteen Thousand One
Hundred Ninety Only
Rupees Four Hundred Five
Rupees Five Hundred Two
Rupees Five Hundred Eighty
Rupees Nine Hundred Eighty
Rupees One Thousand Three
Hundred Forty Four Only
Rupees One Thousand Seven
Hundred Ninety Two Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
mated Rate As per Sanction Reg. S.O.R.
2024-25 (Without GST) in Rs.
Rupees Two Thousand Two
Hundred Fourteen Only
Rupees Two Thousand Seven
Hundred Ninety Six Only
Rupees Three Thousand Eighty
Rupees Three Thousand Six
Hundred Twenty Six Only
Rupees One Hundred Forty
Rupees Eighty Four Only
Rupees Eighty Five Only
Rupees Ninety Four Only
E:\TENDER\UNIT RATE\YEARLY RATE\Unit Rate as per SOR Year 2025-26 (JID)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD.pdf
sch b.pdf
SPECIAL CONDITION.pdf
TENDER NOTICE 4.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .