Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical NON RESPONSIVE |
Tender Value
Refer Docs
Closing Date
23 Jul 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
PWD COMPLEX BARAMULLA 193101
Renewal coat Macadamisation and maintenance of road from Bhuroo Mandir to Hajibal Package No. JK03_47 Length 14.00 Kms PMGSY Division Baramulla.
2021_KSRRD_111664_1
NIT 04 SE PMGSY Bla e_TENDERING OF 2021_22 JK03_47
Open Tender
CIVIL
Item Rate
60 days
BARAMULLA
Please refer Tender documents.
18 documents required · 18 mandatory
₹10,000
ACCOUNTS OFFICER PMGSY KASHMIR
Exempted
OFFICE OF THE SUPERINTENDING ENGINEER PMGSY BLA
31 Jul 2021
5 Jul 2021
24 Jul 2021
5 Jul 2021
23 Jul 2021
9 Jul 2021
8 Jul 2021
30 days
Amount
Earth Work
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Protection Works(Create work)
Earth work in Excauation for foundation Structures upto3m depth as per drawing and technical specificationClause 1104 including setting out, construction of shoring and bracing, removel of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (item No. 9.1 No. 33 of SOR)
Providing and laying of Boulder apron laid in wire crates 4mm dia black Anealed wire confirming to IS 280and IS 4826 in 100mmx100mm mesh (Woven Diagonally ) including 10%extra for lapes and joints laid with quarry stones weighing not less than 25kg each as per Drawings and technical Specification Clause 1301 stones to be taken out staked and reusing complete job (Avalable Stones)
Providing and laying of Boulder apron laid in wire crates 4mm dia black Anealed wire confirming to IS 280and IS 4826 in 100mmx100mm mesh (Woven Diagonally ) including 10%extra for lapes and joints laid with quarry stones weighing not less than 25kg each as per Drawings and technical Specification Clause 1301
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8, including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete)
Protection Works ( Rwalls/ B walls)
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Providing and laying plain/reinforced cement concrete in open grade in leveling course PCC Grade M-10 as per drawing and MORD technical specification clause 802,803,1202 and 1203 including cost of form work and cost and carriage of all meterials from approved source to site of work with all leads,lifts loading un-loading and octori (Finished work to be measured)
Stone masonry in (1:5) cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 including cost of form work and cost and carriage of all meterials from approved source to site of work with all leads,lifts loading un-loading and octori (Finished work to be measured) including dismentling ,stacking and reusing complete job Available stones
Stone masonry in (1:5) cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 including cost of form work and cost and carriage of all meterials from approved source to site of work with all leads,lifts loading un-loading and octori (Finished work to be measured)
Providing PCC M20 architectural coping on the top of wing walls return walls etc. complete as per drawing and technical specification clause 615,710 and 1204.3.11. (0.15m thick) including cost of form work and cost and carriage of all meterials from approved source to site of work with all leads,lifts loading un-loading and octori (Finished work to be measured)
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8, including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete)
Pavement
Scarifying Existing Bituminous Surface to the depth of 150mm and disposal of scrified material with a lift upto 3m and lead upto 1000m as per technical specificatiobn clause 301.4
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
Granular sub-base course with local material (Table 400.13 )by, mix in place method normal construction of granular sub base by providing local material spreading in uniform layers with motor grader on prepared surface mixing by mix in place method , with rotavator at OMC , and compacting with smooth wheel roller to achieve the desired density, complete as per MORD technical . Specification. Clause 408. Using naturally occurring gravel, including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete)
Providing, laying, spreading and compacting graded stone aggregates to wet mix macadam specification including primixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed materail by tipper to site, laying in uniform layers in sub base/base course on a well prepaied sub base and compacting with smooth wheel roller of 80-100 kN weight to achive the desired density including lighting, baricading adn maintenance of diversion, etc as per table 400.11 and 400.12 and Technical Specification Clause 406.by mechanical means with 1 Km lead. (including cost of Scerifying Existing Payment) including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete)
Providing & applying Low Porosity primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface & spraying primer at the rate of (0.70 – 1.0) Kg/Sqmt. using mechanical means as per MORD technical Specification Clause 502.,including cost and carriage of material from source to site of work, with all leads, lifts, loading unloading and octori. (Finished work to be measured, complete)
Providing & laying Bituminous macadam, 50 mm thick, with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site including all leads,liftsf, laid over a previously prepared surface with paver finisher to the required grade, level & alignment and rolled to achieve the desired compaction as per MORD technical Specification Clause 504,including cost and carriage of material from source to site of work, with all leads, lifts, loading, unloading and octori. (Finished work to be measured, complete)
Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 Kgs per Sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MORD technical specifications clause 503.,including cost and carriage of material from source to site of work, with all leads, lifts, loading unloading and octori. (Finished work to be measured, complete)
Providing, laying semi-dence Bituminious concrete using crushed stone aggregate of specified grading, premixed binder and filler , transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade,level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete as per directions of Engineer-in- Charge. 25mm compacted thickness with bitumin of grade VG-10@5%(percentage by weight of total mix) and lime filler @2%(percentage by weight of Aggregate) prepared in Batch Type Hot Mix plant of 100-120 TPH Capacity
Providing and laying 6mm. seal coat ( by mechanical means) sealing the voids in a bituminious surface laid to the specified levels grade and cross fall using Type B, bitumen(S-90) as per MORD technical specification Clause 510. including cost and carriage of materials from source to site of work, with all leads, lifts, loading unloading and octrio. (Finished work to be measured, complete)
Construction of shoulders with approved material and source obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1
Maintenance for Five Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
The Contractor has to quote the rates for Construction part without GST and GST @12% shall be added at the time of Allotment.
Sharp Construction Co.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .