Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹25.5 LAccepted-AOC | ₹25.5 L | 1 | Accepted-AOC LOWEST |
| 2 | 2₹27.6 LRejected-Finance | ₹27.6 L | 2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical l5 |
| 5 | Rejected-Technical | - | - | Rejected-Technical l6 |
| Sl No | Description | Qty | Unit | S.ANILKUMAR L6 | Renjith M L5 | R S SAJITHRAJ L1 | M J Tech Engineering Construction L2 | SYAM SANKER L4 | Mohandas M L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Laying of Pipe line. | |||||||||
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 1,266 | cum | 624.77 ₹7.9 L | 510 ₹6.5 L | 470.72 ₹6.0 L | 509.55 ₹6.5 L | 370 ₹4.7 L | 400 ₹5.1 L |
| 1.00 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 144 | cum | 401.93 ₹57,877.92 | 300 ₹43,200 | 302.83 ₹43,607.52 | 327.8 ₹47,203.20 | 320 ₹46,080 | 290 ₹41,760 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 2.4 | cum | 2,318.66 ₹5,564.78 | 1,929 ₹4,629.60 | 1,746.97 ₹4,192.73 | 1,891.05 ₹4,538.52 | 1,500 ₹3,600 | 1,700 ₹4,080 |
| 1.00 | 100.9.13:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 200 mm nominal outside diameter pipes. | 350 | metre | 315.47 ₹1.1 L | 250 ₹87,500 | 237.69 ₹83,191.50 | 257.29 ₹90,051.50 | 240 ₹84,000 | 210 ₹73,500 |
| 1.00 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 1,200 | metre | 29.51 ₹35,412 | 21 ₹25,200 | 22.23 ₹26,676 | 24.06 ₹28,872 | 25 ₹30,000 | 19 ₹22,800 |
| 1.01 | 100.9.11:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 160 mm nominal outside diameter pipes. | 1,190 | metre | 223.81 ₹2.7 L | 160 ₹1.9 L | 168.63 ₹2.0 L | 182.54 ₹2.2 L | 160 ₹1.9 L | 170 ₹2.0 L |
| 1.01 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. | 500 | metre | 96.09 ₹48,045 | 75 ₹37,500 | 72.4 ₹36,200 | 78.37 ₹39,185 | 60 ₹30,000 | 90 ₹45,000 |
| 1.01 | 100.9.7:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 75 mm nominal outside diameter pipes. | 200 | metre | 96.09 ₹19,218 | 75 ₹15,000 | 72.4 ₹14,480 | 78.37 ₹15,674 | 80 ₹16,000 | 90 ₹18,000 |
| 1.01 | 100.31.2.1:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 80mm diameter, Class II. | 5 | no | 672.54 ₹3,362.70 | 559 ₹2,795 | 506.72 ₹2,533.60 | 548.51 ₹2,742.55 | 650 ₹3,250 | 500 ₹2,500 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
16 Feb 2026, 3:00 pmClosed
EE
HEAD WORKS DIVISION,AVK
KIIFBUtility shifting Deposit works under KRFBKIIFBRWSS to Aruvikkara Grama Panchayath Utility shifting for road development work shifting of pipelines along Aruvikkara dam to Mullalavinmoodu junctionPipeline Work
2026_KWA_835129_1
16/2025-26/HWD/AVK
Open Tender
Civil Works - Water Works
360 days
WORKS
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,257
₹50,000
19 Mar 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
Laying of Pipe line.
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge.
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
100.9.13:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 200 mm nominal outside diameter pipes.
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.9.11:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 160 mm nominal outside diameter pipes.
100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
100.9.7:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 75 mm nominal outside diameter pipes.
100.31.2.1:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 80mm diameter, Class II.
100.31.2.2:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 100mm diameter, Class II.
100.31.2.4:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 150mm diameter, Class II.
OD90111/2025-2026:Interconnection from newly laid 110 mm pipe line to the existing branch lines 110/90/75/63 mm pvc by supplying and fixing equal Tee and connected items.cutting, earthwork excavation, bailing out ,fencing, valve operation ,fixing materials pipes and specials, etc complete all as per direction of Engineer in charge
OD90110/2025-2026:Interconnection from newly laid 160 mm pipe line to the existing branch lines (110/90/75/63/50mm ) by supplying and fixing equal Tee and connected items. including cost of cutting, earthwork excavation, bailing out ,fencing, valve operation ,fixing materials pipes and specials, etc complete all as per direction of Engineer in charge
Supply of Materials
100.98.240:Supply of PVC Pipe, 10kg/cm2, 200mm Dia.
100.98.239:Supply of PVC Pipe, 10kg/cm2, 160mm Dia.
100.98.236:Supply of PVC Pipe, 10kg/cm2, 90mm Dia.
100.98.235:Supply of PVC Pipe, 10kg/cm2, 75mm Dia.
100.98.457:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 80mm.
100.98.458:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 100mm.
100.98.460:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 150mm.
House connection
100.60.8.2:Replacing the chocked / damaged 20mm (3/4 inch) house connection with 20mm (3/4 inch) water meter from existing mains, up to a length of 5m using 25mm Indian Standard Class 6 uPVC pipe and uPVC / Brass specials viz. brass ferrule, Elbow, MTA, FTA, couplers etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, safely removing & re-fixing existing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges but excluding cost of water meter and meter box and excluding charges for cutting the concrete / tarred / bituminous roads and as per the directions of the department officers.
100.60.3.2.1:Providing additional length of house connection pipe using 25mm Indian Standard Class 6 uPVC pipe and specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers
Valve Chamber 1.2m* 1.2m
OD90113/2025-2026:Construction of valve chamber of size 1.2x1.2x1.00 inside including conveying supplying and fixing CI manhole cover of dia 560 mm
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1405035.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tendernotice_2.pdf
PDF • 0.35 MB
BOQ_1405035.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid