Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.9 LAccepted-AOC 135 135A PALANISAMY TOWER DHARMARAJ LAYOUT SOWRIPALAYAM CROSS ROAD RAMANATHAPURAM COIMBATORE 641 045 | COIMBATORE | TAMIL NADU | 641045 | L1 | Accepted-AOC Approved | |
| 2 | L2₹55.9 L+₹3,082.90 (0.06%)Rejected-Finance | L2 | Rejected-Finance Above |
| Sl No | Description | Qty | Unit | TECTUS INFRA PVT LTD L1 | SARASWATHI & CO L2 |
|---|---|---|---|---|---|
| 1.00 | Advance Patch works for making up the Undulation in the Existing B. T Surface to all average Thickness of 50mm to 40mm IRC mm HBG Metal Premixed with the 44 kg of 80/100 Bitumen per cum of Metal including cost and conveyance of all materials to site stacking there to departmental metric gause for Pre- Measurement as directed by the departmental officer and including cost and conveyance of bitumen which will be supplied and procured by the Contractor wise self at his own cost including handling charge for the same at both ends, heating the bitumen premixing layer temping including all labour charges for patch work and line charge for Runing and fuel charges for all loads and plants completed. and all other incedental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 7 | m3 | 3,978.2 ₹27,847.4 Lowest | 3,979 ₹27,853 |
| 2.00 | Providing and laying Tack Coat over Existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 6,334 | m2 | 27.1 ₹1,71,651.4 Lowest | 27.5 ₹1,74,185 |
| 3.00 | Providing and Laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5 | 317 | m3 | 10,304 ₹32,66,368 Lowest | 10,305 ₹32,66,685 |
| 4.00 | Providing and Laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5. | 191 | m3 | 10,925 ₹20,86,675 Lowest | 10,926 ₹20,86,866 |
| 5.00 | Providing and Laying of U/S Gravel including cost and conveyence of the same to work site with an lead of 7Km including Stacking the same to Departmental gauge for Premeasurement including all labour charges for Laying, Spreading etc, Complete and directed by the Departmental Engineer for making up low berms complying with standard Specifications. | 102 | m3 | 333.65 ₹34,032.3 Lowest | 334 ₹34,068 |
Tender Value
₹67 L
EMD Value
₹67,000
Closing Date
6 Aug 2025, 3:00 pmClosed
Executive Officer
Punjaithottakurichi Town Panchayat
NSMT 2025-26 Restoration of BT Road From Thottakurichi School to Sengattanur Popular Muthaliyar Channel NH-7 and Mel Orathai Road to Sengalmalai in Punjai Thottakurichi Town Panchayat, Karur District.
2025_DTP_573025_2
13/2025
Open Tender
Civil Works
Works
180 days
Punjaithottakurichi Town Panchayat
Please refer the tender document
3 documents required · 3 mandatory
₹0
₹67,000
17 Sept 2025
4 Aug 2025
6 Aug 2025
4 Aug 2025
6 Aug 2025
4 Aug 2025
Amount
Advance Patch works for making up the Undulation in the Existing B. T Surface to all average Thickness of 50mm to 40mm IRC mm HBG Metal Premixed with the 44 kg of 80/100 Bitumen per cum of Metal including cost and conveyance of all materials to site stacking there to departmental metric gause for Pre- Measurement as directed by the departmental officer and including cost and conveyance of bitumen which will be supplied and procured by the Contractor wise self at his own cost including handling charge for the same at both ends, heating the bitumen premixing layer temping including all labour charges for patch work and line charge for Runing and fuel charges for all loads and plants completed. and all other incedental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and laying Tack Coat over Existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and Laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and Laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5.
Providing and Laying of U/S Gravel including cost and conveyence of the same to work site with an lead of 7Km including Stacking the same to Departmental gauge for Premeasurement including all labour charges for Laying, Spreading etc, Complete and directed by the Departmental Engineer for making up low berms complying with standard Specifications.
SARASWATHI & CO (BID ID -1422278)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .