Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 LAccepted-AOC | ₹3.7 L | 1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L2 |
| 4 | Rejected-Technical WARD 3 KERALA | THRISSUR | KERALA | 680667 | - | - | Rejected-Technical L3 |
Tender Value
₹4.2 L
EMD Value
₹10,574
Closing Date
23 Mar 2026, 6:00 pmClosed
Assistant Executive Engineer Kilimanoor block
Office of the Assisitant Executive Engineer Kilimanoor block
Annual Plan-Kilimanoor BP 2025-26 Pr No 138/26- CONSTRUCTION OF SIDEWALL IN TAKE A BREAK BUILDING-General Civil Work
2026_LSGD_847369_2
11/AEE/LIDEW/KMR/2025-26
Open Tender
Civil Works - Roads
Percentage
180 days
Kilimanoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,574
Yes
19 Aug 2026
16 Mar 2026
25 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
16 Mar 2026 - 23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SIDE WALL CONSTRUCTION | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | 367.72 | ₹367.35 |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | 8,109.18 | - |
| 1.003 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | 8,759.56 | ₹8,750.8 |
| 1.004 | 5.22.2:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire | - | kilogram | 112.18 | - |
| 1.005 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | 394.74 | ₹394.35 |
| 1.006 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | - | kg | 182.39 | - |
| 1.007 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | - | sqm | 168.52 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_1432639.xls
BOQ • 0.24 MB
138.pdf
Tender Documents • 1.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .