| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Fee/PreQual/Technical/Finance GAFOOR P | ₹7.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.6 L+₹41,904.98 (5.83%)Admitted-Fee/PreQual/Technical/Finance | ₹7.6 L+₹41,904.98 (5.83%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.6 L+₹42,753.96 (5.95%)Admitted-Fee/PreQual/Technical/Finance | ₹7.6 L+₹42,753.96 (5.95%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.6 L+₹42,754.09 (5.95%)Admitted-Fee/PreQual/Technical/Finance | ₹7.6 L+₹42,754.09 (5.95%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SAJI K.A. L2 | KAIRALI LABOUR CONTRACT CO-OPERATIVE SOCIETY L4 | SREEJESH R. S. L3 | GAFOOR. P. L1 |
|---|---|---|---|---|---|---|---|
| 1.00Road Work | |||||||
| 1.00 | 3.15.1:Compacting Original Ground (i) Compacting original ground supporting embankment Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 16.8 | cum | 14.79 ₹248.47 | 14.81 ₹248.81 | 14.81 ₹248.81 | 13.97 ₹234.7 Lowest |
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 34.01 | cum | 405.07 ₹13,776.43 | 405.52 ₹13,791.74 | 405.52 ₹13,791.74 | 382.77 ₹13,018.01 Lowest |
| 1.00 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material | 36.86 | cum | 3,073.65 ₹1,13,294.74 | 3,077.04 ₹1,13,419.69 | 3,077.04 ₹1,13,419.69 | 2,904.41 ₹1,07,056.55 Lowest |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 16.8 | cum | 3,446.12 ₹57,894.82 | 3,449 ₹57,943.2 | 3,449.92 ₹57,958.66 | 3,256.37 ₹54,707.02 Lowest |
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 55.5 | sqm | 354.95 ₹19,699.73 | 355 ₹19,702.5 | 355.35 ₹19,721.93 | 335.41 ₹18,615.26 Lowest |
| 1.01 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 27.75 | sqm | 450.17 ₹12,492.22 | 494.52 ₹13,722.93 | 450.67 ₹12,506.09 | 425.38 ₹11,804.3 Lowest |
| 1.01 | 75.5.6.A.1.2pb:Surface Dressing using Bituminous (Penetrations grade / modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100 kN static roller including cleaning the road surface as per Technical Specification Clause 507. (A) By Manual Means Case - I: Nominal Chipping Size 13.2 mm II Bitumen S-65 | 55.5 | sqm | 194.05 ₹10,769.78 | 194 ₹10,767 | 194.27 ₹10,781.99 | 183.37 ₹10,177.04 Lowest |
| 1.01 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 112 | sqm | 128.68 ₹14,412.16 | 128 ₹14,336 | 128.83 ₹14,428.96 | 121.6 ₹13,619.2 Lowest |
| 1.01 | 75.5.2.2pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 555 | sqm | 28.9 ₹16,039.5 | 28 ₹15,540 | 28.94 ₹16,061.7 | 27.31 ₹15,157.05 Lowest |
Tender Value
₹7.6 L
EMD Value
₹19,048
Closing Date
16 Sept 2026, 6:00 pmClosed
Assistant Engineer LID_EW Section Kottur
Assistant Engineer LID_EW Section Kottur
Road Re tarring work
2026_LSGD_868496_1
AE/KTR/ET/16/2026-27
Open Tender
Civil Works - Roads
Item Rate
365 days
Kottur Grama panchayat
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,680
Yes
₹19,048
Yes
18 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
16 Sept 2026
9 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road Work | |||||
| 1.001 | 3.15.1:Compacting Original Ground (i) Compacting original ground supporting embankment Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 16.8 | cum | - | - |
| 1.002 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 34.01 | cum | - | - |
| 1.003 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material | 36.86 | cum | - | - |
| 1.004 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 16.8 | cum | - | - |
| 1.005 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 55.5 | sqm | - | - |
| 1.006 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 27.75 | sqm | - | - |
| 1.007 | 75.5.6.A.1.2pb:Surface Dressing using Bituminous (Penetrations grade / modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100 kN static roller including cleaning the road surface as per Technical Specification Clause 507. (A) By Manual Means Case - I: Nominal Chipping Size 13.2 mm II Bitumen S-65 | 55.5 | sqm | - | - |
| 1.008 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 112 | sqm | - | - |
| 1.009 | 75.5.2.2pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 555 | sqm | - | - |
stage.html
html • 0.02 MB
finance_1470896.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD_92.pdf
Tender Documents • 1.78 MB
Sampleforms.pdf
Other Document • 0.59 MB
BOQ_1470896.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .