| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-AOC | ₹2.9 L | 1 | Accepted-AOC lOWEST |
| 2 | 2₹3.0 LRejected-AOC PALAKEEZHI HOUSE MUNDUR P O PALAKKAD DISTRICT | PALAKKAD | KERALA | 678001 | ₹3.0 L | 2 | Rejected-AOC SECOND |
| Sl No | Description | Qty | Unit | UJESH.U L1 | VASUDEVAN P C L2 |
|---|---|---|---|---|---|
| 1.00Urgent Rectification Works to the palappuram branch canal | |||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 58.5 | sqm | 8.13 ₹475.61 | 8.17 ₹477.95 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 23.69 | cum | 225.94 ₹5,353.20 | 226.95 ₹5,377.13 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.8 | cum | 6,957.14 ₹54,265.69 | 6,988.08 ₹54,507.02 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 95.16 | sqm | 736.33 ₹70,069.16 | 739.6 ₹70,380.34 |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 16.38 | cum | 7,335.73 ₹1.2 L | 7,368.35 ₹1.2 L |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.49 | cum | 8,099.95 ₹20,144.58 | 8,135.97 ₹20,234.16 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 48.36 | sqm | 305.01 ₹14,750.28 | 302.84 ₹14,645.34 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 5.88 | cum | 279.3 ₹1,642.28 | 280.54 ₹1,649.58 |
| 1.01 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 3 | each | 483.05 ₹1,449.15 | 485.2 ₹1,455.60 |
Tender Value
₹3.4 L
EMD Value
₹8,403
Closing Date
18 Mar 2026, 5:00 pmClosed
Assistant executive Engineerhead works sub Divisio
Head Works Sub Division Malampuzha ,Irrigation
This estimate includes provisions clearing grass , earth work excavation , foundation pcc 1 4 8 , side walls with pcc 1 3 6 , plastering in cm 1 3, wearing coat and haunch in pcc 1 2 4 and earth filling on both sides
2026_Irrig_844620_1
IRR/PI/TR/718/2026_5_1_1/1
Open Tender
Repair and Maintenance Works
180 days
Palapuaram
Please refer Tender Document
6 documents required · 6 mandatory
₹745
Yes
₹8,403
Yes
13 May 2026
10 Mar 2026
19 Mar 2026
10 Mar 2026
18 Mar 2026
10 Mar 2026
Urgent Rectification Works to the palappuram branch canal
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
OD43713/2025-2026:Engaging manmazdoor
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1426055.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BD.pdf
Tender Documents • 1.91 MB
BOQ_1426055.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid