Loading…
Loading…
Tender ID
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
3 Feb 2026, 6:00 pmClosed
Dy.Minicipal Commissioner - West Zone
Water related complaints such as leakage repair, laying new water lines regarding low water pressure/pollution, and to do necessary water related work for the disposal of the complaint, as well as to do water related work from the budget of the Hon. MLA, Municipal Councilor and from other budgets (ARC) work In the West Zone Vasana Ward.
268828
7/25-26 (T.N.50)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Yes
Municipal Commissioner, Ahmedabad
₹25,000
Yes
24 Jan 2026
24 Jan 2026
24 Jan 2026
3 Feb 2026
24 Jan 2026
Name of Work :- Water related complaints such as leakage repair, laying new water lines
regarding low water pressure/pollution, and to do necessary water related work for the disposal of
the complaint, as well as to do water related work from the budget of the Hon. MLA, Municipal
Councilor and from other budgets (ARC) work In the West Zone Vasana Ward.
Sr.No. QTY. DESCRIP TION RATE PER AMOUNT
1 Transporting from AMC store and laying spigot
and socket New DI pipe line DI-k-9 pipes of
various classes with CI/DI/MS specials of
following diameters. Rate includes excavation up
to minimum 1.0 mt. depth from top of pipe / as
per requirement in any soil, refilling after laying
pipe, covering and temptation of carting surplus
earth up to 30 mt. lead and watering and
compaction. Clearing the site. All Joints shall be
made tight & leak free etc. comp.
2 Only Removing & recover of existing CI/DI pipe
line & Specials, removing any type of joint
carting it to the Muni. Stores as & where directed
as per instruction of Engg. In charge with
excavation & refilling.
(A) 50 (A) 80 mm dia 63.39 Rmt
(B) 50 (B) 100 mm dia 64.29 Rmt
(C) 50 (A) 150 mm dia 77.68 Rmt
3 Removing & relaying of existing CI/DI pipe line
& Specials, Cleaning of pipe & Specials from
Inside, including excavation, refilling etc. comp.
in line & level with any type of joints as per
instruction of engg. In charge.
(B) 100 (B) 100 mm dia 64.29 Rmt
(C) 70 (C) 150 mm dia. 77.68 Rmt
(D) 20 (D) 200 mm dia. 93.75 Rmt
(E) 20 (E) 250 mm dia. 112.5 Rmt
(F) 10 (F) 300 mm dia. 119.64 Rmt
4 Labour charges for installing and jointing Sluice
Valves including loading, transporting from
owner's store, lowering in location to the required
with excavation refilling alignment by crane/
tripod and chain block including cost of total nos.
of nuts, bolts, Necessary gaskets and excluding
fixing of tail pieces with lead & jute etc complete
as directed by Engg. in charge.
(D) 12 (D) 200 mm dia. 2125 No
(E) 4 (E) 250 mm dia. 3000 No
5 Labour Charges for removing and recover of ex.
C.I. Sluice valve with tail pieces and carting it up
to Muni.Store or site as per instruction of Engg.
In charge item include. necessary Excavation,
removing or making joints, refilling etc.comp. as
directed by Engg in charge.
(B) 2 (B) 100 mm dia 741.07 No
(D) 2 (D) 200 mm dia. 1125 No
6 Cutting of existing pipelines of following
diameters including carting of nece. specials
from AMC store to site and from site to AMC
store (recovered materials) nace. labours for
excavation, jodan & backfilling fitter, supervisor,
etc. complete. Rate also includes electric cutter,
dewatering pump fuel and transportation of
machineries, chain pulley block if requires
working at an instructed specific time of day or
night etc. complete.
7 5000 Labours charges for collecting specials from 21.43 Kg.
Municipals store loading , transportation,
unloading to the site, laying and fixing CI
specials inclusive of all jointing materials like
lead, spun etc.and labour, exacavation re-filling
and nece. dewatering as per instrucation of engg.
8 10 Fixing of valve Road box incl .locating valve, 446.43 Nos
nece. excavation, Brick Masonary,PCC work.
Item also inclues cartring form AMC store to
site. Etc.Comp. as directed
9 Labour charges for repairing of lekage
CI/Di pipe line for following dia different
places including necessary excavation
manually or by machinery removing mud
dewatering cleaning of pipe and leakafe portion
and repairing by inserting lead wool jute tools
required for inserting lead wool hiring
charges of excavators Hydra/crane j.c.b
dewatering set fuel operator cost of lead wool etc
complete(including all material but excluding
cost of pipel) (GWSSB SOR 22-23 SECTION
10 50 Excavation for trail pit of maximum diamension 223.21 No
of 1.5 mt x0.75 x 1.5 mt depth for location of
existing line including excavation but excluding
cost asphalt cutting but including refilling,
watering etc. comp as per instruction of Engg in
11 Making hole on existing CI/DI/MS water pipe
line including nacessary GI fittings item also
includes necessary excavation, dewatering and
refilling as per instruction engg. In charge
(A) 200 A) 15 mm Dia 312.5 No
(B) 10 B) 20 mm Dia 401.79 No
(C) 20 C) 25 mm Dia 535.71 No
(D) 10 D) 40 mm Dia 1785.71 No
(E) 20 E) 50 mm Dia 2678.57 No
12 40 Labour Work for temp Jodan of ex.line for 267.86 No
running water supply incl making collar between
gap of pipe & jointing with jute & day after
removing all this as per inst etc.comp as dire.
13 100 Labour charges for doing washout of water pipe 669.64 No
line at end including necessary excavation
refilling the pit. Allowing the water to flow for
15 minutes twice or thrice as per site condition
during supply hour, dewatering the pit and
plugging with existing wooden butch. etc. comp.
as per instruction
14 Supplying wooden taper bunches from jungle
wood (Like limda, ambo) Etc.comp.
(A) 300 (A) 15 Mm dia. to 20 MM dia. 13.39 No
(B) 200 (B) 25 Mm dia. to 37 MM dia. 17.86 No
(D) 50 (D) 80 mm dia to 100 mm dia line 312.5 No
15 149.34 Conveyance charge of earth ,lime,murrum, 125.33 Cu.M
building rubbish,manual
garbage,sludge,excavated rock ,fly ash, aggregate
of any kind etc. comp.up to 5.0 Km. Lead
16 Extra rate over item of excavation of earth for
excavation of asphalt pavement of thickness up
to 0.20 meter including demolishing the asphalt
carpet,metal,soiling etc.comp. with stacking the
material as directed.
(A) 50 a) up to 0.20 meter thickness (By Manual) 71.43 smt
(B) 260 b)Up to 0.30 meter (By Breaker Machine 178.57 smt
including cost of operator, fuel, & transportation
(C) 100 c)0.30 meter & above (By Breaker Machine 312.5 smt
including cost of operator,fuel & transportation
17 200 Supplying Pneumatic Breaker Machine for RCC 535.71 Hour
Slab or Asphalt Demolishing Work on site by
using perator, fuel, power Supply etc. Complete
as Directed. (No payment should be allowed for
non working condition of machinery and for pipe
line excavation and M.H. work. Allowed only for
break down work)
18 100 Providing & Supplying JCB Machine on rental 535.71 hr
basis in case of emergency situation and break
down type work & also during unavoidable
condition as per instruction of engg.incharge
rate includes all nece. shifting, fuel and operating
charges and stacking of useful & non-useful
materials separately up to store. (No payment
should be allowed for non working condition of
machinery and for pipe line excavation and
laying work) ( Based on Previously approved rate
19 100 Providing and operation dewatering Pump 535.71 Shift
including fuel charges & operator Charges etc. as
directed etc. comp. (Shift for Eight Hour) (For
Each Pump Set, No payment should be allowed
for non working condition of machinery )
20 Providing, laying and jointing in true line and
level U.P.V.C pipe (SCH - 40) of following dia.
including fittings of standard make as approved
by Engineer- in - charge. Pipe shall be fixed on
the wall with the help of clamp at every 2000 mm
centre to centre or shall be concealed as directed
including necessary fittings etc. including testing
of pipe and joints and fixing the same with
adhesive solvent, including cost of all materials.
21 Supplying, labour for excavation of all types of
soil at any depth including excavation of asphalt
pavement of any thickness, demolition of brick
work in CM of any proportion including stacking
of serviceable materials and disposal of
unserviceable material etc. comp. as directed
(A) 1000 Mazdoor at day /night 293.75 No
(B) 200 Fitter at day / Night 312.5 No.
(C) 200 Makadam/ supervision/Fitter at day / Night 379.46 No
22 100 Barricading the entire break down or excavated 80.36 Rmt
area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre,
C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion &
movement including cautionary board etc. Item
also includes for making temporary sufficient nos
of lighting arrangement through out the work
with necessary required arrangement. The same
shall be removed after completion of work. (Only
for break down work from start to complete)
23 200 Labour work for fixing interlocking blocks/any 68.64 Smt
kind of pavment on up to 50 mm th sand
bedding, levelling, watering and fixing in line &
level as well cleaning the site
etc.comp.as.directed
24 Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam
specification including premixing the Material
with water at OMC in mechanical mix plant
carriage ofmixed Materialby tipper to site, laying
inuniform layers insubbase/ base course on
wellprepared surface and compacting with
vibratory roller to achieve the desired density as
per Codal Provision
25 Production & Supply of WMM 1708.10 Cmt
25 Laying Of WMM 31.25 Cmt
Total Rs 25 000 00.0
Contractor signature Addi. City Engineer
AHMEDABAD MUNICIPAL CORPORATION
West Zone, Zonal Office", 2nd Floor, A.M. Office, Dr. Ramanbhai Patel Bhavan, Usmanpura,
Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013.
Municipal Commissioner invites Percentage Rate sealed tenders from interested
MEMORANDUM OF WORKS IN BRIEF
1 Name of work Water related complaints such as leakage repair, laying new water
lines regarding low water pressure/pollution, and to do necessary
water related work for the disposal of the complaint, as well as to do
water related work from the budget of the Hon. MLA, Municipal
Councilor and from other budgets (ARC) work In the West Zone
2 Time Limit 12 Months
3 Tender Validity Period 120 Days from the date of opening of the tender
4 Eligibility Criteria Register “E1” class in PWD in Govt. R&B/CPWD/AMC or equivalent
registration with any other state Govt. or institutions.
5 Estimated Cost put to Rs.
6 Earnest Money Deposit Rs. 25,000.00/- (Demand Draft or pay order in favour of Municipal Commissioner,
Ahmedabad /) To be submitted as prescribed in 9.0 below. Demand Draft or Bank
Guarantee shall be from Nationalized Bank / Sheduled Bank and valid for 120 days. (As
per AMC finance dept.circular No-5 Dt.5/5/07 & F.D. Circular No. 29 Dt. 7/08/2010).
.(As per AMC finance dept.circular No-5 Dt.5/5/07 & F.D. Circular No.
Dt.7/08/2010) & attched ANNEXURE - 1 finance dept.circular No- 14 Dt.4/6/13,
Circular No. 12 Dt.14/06/2021) & attched ANNEXURE - 1 finance dept.circular No-
7 Security Deposit 5% of the Sanctioned Tender Amount in form of Bank Guarantee/
Demand Draft / Local MICR Cheque.
8 Tender fees Rs.900/-Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to Assistant
Manager (west zone),Ahmedabad Municipal Corporation, West Zone,
Zonal Office", Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad.
10 Tenders issue date Tenders from the AMC website www.egovamc.com shall be down loaded
from AS PER TENDER NOTICE INVITED
11 Last date of receiving As per Notic inviting Tender / Addendum / Corrigendum.. The
Tenders. tenders received after latest schedule date and time will not be entertained
under any circumstances.
12 Date of Opening As per Notic inviting Tender / Addendum / Corrigendum (only
Techanical Bid) to Assistant Manager / Dy.C.E.(W/Z) office, 2nd Floor,
Dr. Ramanbhai Patel Bhavan,Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013
13 Mode of sending the This is a two bid System Tender Hence Financial Bid shall be Opened
Tender Documents and only for the Technically Qualified Bidders.
evalution of tender Document shall be physically submitted in sealed envelope (two-bid
system) By RPAD/Speed post/ Hand Delivery in sealed covers in
Duplicate (One Original & One Duplicate) duly sign & seal by contractor
EMD in the form of Demand Draft/ Bank Guarantee shall be sealed in
separate envelope and along with Volume-I marked Envelope ‘A’ only
(Technical Bid). and Volume-II shall be sealed in another separate
envelope, marked envelope ‘B (Financial Bid). Both envelopes ‘A’ and
‘B’ shall then be sealed in one large envelope.
The first envelope ‘A’ containing technical bids from the bidders received,
shall be opened in the presence of the bidder’s representatives as per NIT
and the technical bids shall be scrutinized by AMC for satisfying eligibility
criteria for the bidders for this work. Then, the financial bids – Volume-II
(envelope ‘B’) from the eligible tenderers only shall be opened. The actual
date of opening of financial bids shall be communicated to technically
qualified bidders at a later date.
Tenders received without EMD shall be considered as Non-Responsive and
shall be rejected outright. ..
14 Terms, Condition, & All general condition of contract of Form B1 condition of contract shall
Specification be applicable..
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at his own expense
any defect which may develop or may be noticed before the period mentioned
hereunder from the certified date of completion, The within 15 days of receipt of
the notice. In the case of failure on the part of the contractor, the Engineer-in-
charge may rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate the whole or
any part of the amount of security deposit towards the expenses, if any, Incurred
by him in rectification, removal or re-execution. The Defects Liability period
shall be as under(a) for all works costing upto Rs. 50,000 ( amount put to
tender), the period shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore (amount put
tender), the period shall be 6 months from the certified date of completion or one
monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall be
months from the certified date of completion which should include one
(d) For building works, the period specified in (a), (b) or (c) above OR elapse of
monsoon period following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September may be
treated as the last date.
16 Time permitted to start Whenever a work is allotted by Engineering staff, whether minor or major
parts of work of part thereof of any amount, the contractor shall be bound to start the
works within 48 hours of intimation of work. Communication done
telephonically via SMS, Via Whatsapp and through letter / E-mail shall be
considered legal and binding for the same. Failure of comply to start the
works in 48 hours of intimation as above by contractor the contractor shall
be levied penalty of (1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting above 10 Lakhs and
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
Lakhs). Three times failures by contractor shall make contractor
responsible to be black listed unless and otherwise justified properly in
writing / binding within 15 days of last notice of penalty.
17 Compensation for Delay 10% of Remaining work
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To the
Final Submission Time And Date. The Same Shall From a part Of Tender
And The Same As to be Attached Along With The Tender Document.
19 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
20 GST «J<obtl le<elegb bwsc S.yum.xe. yjd&e awfJJtbtk ytJNu.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all the
tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Addl City Engineer
As per account department(A.M.C.) circular no. 12, Dt.14/06/2021 Bank guarantee of said
work must be of Ahmedabad city branch, which mentioned as bellow.
(A) Guarantee issued by following bankswill be accepted as SD/EMD on permanentbasis.
(1) All Nationalized Banks including the Public Sector Bank-IDBI LYF.
(B). Guarantees issued by following banks will be accepted as SD/EMD for the period up
to March- 31, 2022. The validity cut-off date in the GR is with respect to the date of
issue of Bank Guarantee irrespective of the date of termination of Bank Guarantee.
1 Commercial Banks :-
5. Kotak Mahindra Bank
6. IndusInd Bank
8. Tamilnadu Mercantile Bank
9. Ujjivan Small Finance Bank
10. A U Small Finance Bank
11. Federal Bank
12. Equitas Small Finance Bank
13. Bandhan Bank
14. Standard Chartered Bank
15. City Union Bank
2 Co-operative and Rural Banks Of Gujarat :-
1. The Mehsana Urban Co-operative Bank Ltd
2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. The Kalupur Commerical Co-operative Bank Ltd
5. Rajkot Nagarik Sahakari Bank Limited
6. The Gujarat State Co-Operative Bank
7. Sarswat Bank
8. Saurashtra Gramin Bank
Seal and Signature of the Bidder Addl City Engineer
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (hereinafter called “the Employer”) invites sealed
Tender document from reputed and qualified bidders for the construction of Works detailed in the Table below:-
Sr. Name of Works Approximate Earnest Completion
No. value of works Money Period
(Rs.) Deposit (Rs.)
1 Water related complaints such Rs. 25,00,000.00 Rs.25,000.00/- 12 Months
as leakage repair, laying new
water lines regarding low water
pressure/pollution, and to do
necessary water related work for
the disposal of the complaint, as
well as to do water related work
from the budget of the Hon.
MLA, Municipal Councilor and
from other budgets (ARC) work
In the West Zone Vasana Ward.
2. Interested bidders shall download the tender documents from AMC’s website
www. amcnprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be Rs. 900.00 in the form of Demand Draft / Pay Order
from any Nationalised Bank in favour of MUNICIPAL COMMISSIONER, Ahmedabad, payable at Ahmedabad,
which shall be non refundable. The Details of Tender fees shall be submit with scan copy at the time of
Quoting price bid of the tender and Physically to be submitted along with technical bid Vol.-1 with other
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works in the above
Table payable at Ahmedabad and drawn in favour of MUNICIPAL COMMISSIONER, Ahmedabad, payable
at Ahmedabad,. Earnest Money Deposit will have to be specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) West Zone, 2nd Floor,Dr. Ramanbhai
Patel Bhavan, Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013.
6. The Bids will be opened at the office of Addl.City Engineer (W/Z) , Ahmedabad Municipal Corporation, 2nd
Floor, Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-
380013. in the presence of bidders or their representatives who choose to attend. In the event of the specified
date of bid submission/opening being declared a holiday for the Employer, the bids shall be received /opened on
the next working day at the same place and the same time.
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a).This is a Two bid System Tender.The Bidder should quote the price bid in tender form before schedule time
Tender Document Vol. 1 , tender fee & EMD (Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate envelope
(marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed Post/ Hand Delivery
in duplicate.Seprate envolup to be submitted by the bidder clearly marked as “Technical Bid” and
“Financial/Price bid” Price bid shall Remain Only the Price bid, Whenever all othe Documents to be
submitted Under The envolup of “ Technical Bid” This envelope shall be sealed in an outer envelope. The
Bid envelopes shall be marked as follows:-
Tender Document
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for the
misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the bidder.
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1The Employer will open the technical bid of physically submitted document of all the bids received for the
package (except those received late) containing the sealed Tender volume and other enclosures then
announce the names of bidders in the presence of bidders or their representatives who choose to attend on the
date and time mentioned in the NIT In the event of specified date of bid opening being declared as a holiday
for the Employer, the Tender will be opened at the appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer at the
opening will announce bidder’s names, , the presence/or absence of EMD, the amount and validity of EMD
furnished with each bid, is valid registration and such other details, as the Employer may consider
appropriate. As per the checklist.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the Invitation for
Bid and has not been furnished in the form, the bid shall be rejected by the Employer as non-responsive and
the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with valid EMD
will be taken up for further evaluation. In case, the Bank does not confirm the EMD, the bid shall be rejected
as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed,
meets the eligibility and qualification criteria, has the required available bid capacity, is accompanied by the
requisite certificates, undertaking and other relevant information specified in the bid documents and is
substantially responsive to the requirement of the bidding documents and provides any clarification for
ascertaining the correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the nonconforming
deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2 and qualified for award of Contract in accordance with
Clause 5(General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and time. In
the event of specified date of bid opening being declared bidders who qualify the criteria then bidder bid will
be considered for opening of price bid.(Following clause no. 5 of ITB).
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be substantially
responsive to the bidding documents and who has offered the lowest Evaluated Bid Price, provided that such
bidder has been determined to be (i) eligible in accordance with the provisions of Clause 3(General Terms
and Condition); and (ii) qualified in accordance with the provisions of Clause 5(General Terms and
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify the
successful bidder by cable/fax and confirmed by registered letter that his bid has been accepted. This letter
shall name the sum which the Employer will pay the Contractor in consideration of the execution, completion
and maintenance of the Works by the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per As per City Engineer
Circular (WRM) no. 6 2011/12 DT: 24/06/2011 after receiving letter of Indent. Time limit of work will
commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion, ask
any bidder for authentication the correctness of the information/details furnished by him in his bid. Such
request by the Employer and the response by bidder shall be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from the
time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid comparison or
contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons not
officially concerned with such process until the award to the successful bidder has been announced. Any
effort by a bidder to influence the Employer's processing of bids or award decisions may result in the
rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its
own responsibility all information that may be necessary for preparing the bid and entering into a contract for
construction of the Works. The costs of visiting the Site shall be at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter its
premises and lands for the purpose of such inspection, but only upon the express condition that the bidder,
its personnel and agents, will release and indemnify the Employer and its personnel and agents from and
against all liability in respect thereof and will be responsible for death or personal injury, loss of or damage
to property and any other loss, damage, costs and expenses incurred as a result of the inspection.
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document for the
construction of works (as defined in these documents, hereinafter referred to as "the Works") detailed in the table
given in the IFB.
1.2 The Works consist of: “as Above "
Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for "E1" class and or equivalent. If
contractor is not registered with AMC in the relevant class, on award of contract he shall be required to
register himself with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the Employer
shall reasonably request.Subject to Submition of Succsesful Submition as per Clause –II of R.&B.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be required to
provide evidence of the origin of materials, equipment, and services to the satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown, produced or
manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
General information
All individual firms must complete the information in this form. Nationality information shall be provided for all
owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
Authorised Signeture Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the following
a) Misleading or false representation in the forms, statements and attachments submitted and included in
b) Record of poor performance such as abandoning the work, rescinding of contract for which the reasons are
attributable to the non-performance of the contractor, consistent history of litigation awarded against the
applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and words) only in
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and words) only in
E-Tender (Online) Not to fill in hard copy of Tender documents
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their misleading or false
representations in the forms statements etc. for the period to be decided by the Employer.
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a joint
venture. A bidder who submits or participates in more than one bid for a contract package will be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to comply with
the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause 16, bids which are not
substantially responsive to the requirements of the bidding documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and the
Employer shall be written in the English language. Supporting documents and printed literature furnished by the
bidder may be in another language provided they are accompanied by an accurate translation of the relevant
passages in the English language, in which case, for purposes of interpretation of the bid, the English translation
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as described in
bidding documents, based on the percentage rate amount in the Bill of Quantities submitted online by the
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and
words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid submission
specified in Clause. The Employer as non-responsive shall reject a bid valid for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may request
the bidders to extend the period of validity for a specified additional period. The request and the responses
thereto shall be made in writing or by fax. A bidder may refuse the request without forfeiting his bidder
agreeing to the request will not be required or permitted to modify his bid but will be required to extend the
validity of his Bid Security for the period of the extension, and in compliance with Clause 2 ( Financial
Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in Instructions to
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly authorized
to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with instructions issued
by the Employer, or as necessary to correct errors made by the bidder, in which case the person or persons
signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date specified
Any bid received by the Employer after the deadline for submission of bids will be returned unopened to the
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the Employer
will direct him to submit the Performance Security and attend the Employer's office on a date determined by the
Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high quality
work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner and
medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will rest entirely on
17. All clause shall be operative from the date of issue of work order and up to the expiry of original and
extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for award has
engaged in corrupt or fraudulent practices in competing for the contract in question. The Employer will
declare the firm ineligible, either indefinitely or for a stated period of time, to be awarded a contract by
AHMEDABAD MUNICIPAL CORPORATION if it at any time determines that the firm has engaged in
corrupt or fraudulent practices in competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private sectors by which they
improperly and unlawfully enrich themselves and/or those close to them, or induce others to do so, by
misusing the position in which they are placed, and it includes the offering, giving, receiving, or
soliciting of anything of value to influence the action of any such official in the procurement process or in
contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a Procurement process or
the execution of a contract to the detriment of the Borrower, and includes collusive practice among
bidders (prior to or after bid submission) designed to establish bid prices at artificial non-competitive
levels and to deprive the Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract without
assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material misrepresentation
or provided fraudulent information / statement, the said Bidder will be liable for disqualification / rejection at
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the Tender
volume is submitted without valid documents and without proof of eligibility criteria it will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or are
conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing laws
as well as framed from time to time). Any penalties laid due to violation of such laws shall be directly
deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the road i.e.
public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic blinkers, traffic
signs as per design, safety tapes etc. to be arranged at site. Necessary florescent marking on traffic signs to be
provided so that it should be visible at night. During night working hours safety in charge personnel shall be
provided with florescent jackets. This shall be Provided at no extra cost by the bidder under attaché with
specified in the tender documents under payable iteme.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new
connection on behalf of AMC. It includes filling the necessary application to power Supply Company, follow
up and getting the supply, filling the necessary test reports to the power supply company. All official fees
including security deposits and other expenses shall be of initially paid by the contractor. AMC may support
to get the temporary connection and may at its diseretien get the same converted to permanent
connection at the same of AMC if desired do,and contractor shall as no extra cost support the same. In
this case AMC my be as the remaining cost subject to approval.
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the contract upon any
agreement for a commission, percentage, brokerage or contingent fee. Breach of this warranty shall give
the Municipal Commissioner the right to cancel the contract or to take any other measure as the
Municipal Commissioner may deem fit. The warranty does not apply to commissions payable by the
contractor to establish commercial or selling agent for the purpose of securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of this contract or to
any benefit that may rise there from.
21:- OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out of or under this
Contract against the contractor the same may be deducted by the Municipal Corporation from any sum then
due or which at any time thereafter may become due to the contractor under this contract and failing that
under any other contract with the Municipal Corporation or from any sum due to the contractor with the
Municipal Corporation (which may be available with Municipal Corporation), or from his retention money,
or he shall pay the claim on demand. The Municipal Corporation reserves the right to carry out post
payment audit and technical examination of the final bill including all supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over payment when
detected not withstanding the fact that the amount of the final bill may be included by the Contractor.
If as a result of such audit and technical examination any over payment is discovered in respect of any
work done by the Contractor or alleged to have been done by him under the contract, it shall be recovered
by the Municipal Corporation from the contractor by way of all the means prescribed above or if any under
payment is discovered by the Municipal Corporation, any amount due to the contractor under this contract
or under payment may be adjusted against any amount then due or which may at any time thereafter become
due before payment is made to the contractor from him to the Municipal Corporation on any other contract
account whatsoever.
If, at any time, there should be evidence of any lien or claim for which owner might have become liable
and which is chargeable to the contractor, the owner shall have the right to retain out of any payment then
due or thereafter to become due an amount sufficient to completely indemnify the owner against such lien
or claim or if such lien or claim be valid the owner may be or become due and payable to the contractor. If
any lien or claims remaining, unsettled after all payments are made, the contractor shall refund or pay to the
owner all money that the latter may be compelled to pay in discharging such lien or claim including all
cost and reasonable expenses.
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall form
the part of the contract documents. The full consideration shall be given to such addendum or corrigendum
before submission of tender duly filled in by the contractor. Therefore, the contractors shall have to kindly
refer the tender for such addendum or corrigendum published by AMC through its website
www.egovamc.com 48 hours prior to the deadline of submission of the tender. Tenderers shall verify the
number of addendum issued and enclose the same with the tender documents , failing which the tenders
shall be liable for rejection and no any complaint in respect to this shall be entertained under any
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the Employer will
in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be valid for
28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned as promptly as
Early as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when the
bidder has furnished the required performance security and signed the agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the successful bidder
shall deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E. Circular.in the form
of a Bank Guarantee/ DD/Locle MICR cheque for an amount equivalent to 5% (five percent) of the Contract
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At present a policy is
framed by Audit department of AMC to charge 4% interest for the balance period and discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as per format
shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released along
with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the same.
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time limit. & As per
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT etc. on material
procurement or any other component for the works from any source shall be borne by the contractors.
All duties, taxes, Service Tax and other levies payable by the Contractor under the Contract, or for any other
cause as of the date 28 days prior to the deadline for submission of the bids, shall be included in the rates and
prices and the total bid price submitted by the bidder and the evaluation and comparison of bids by the
Employer shall be made accordingly.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount shall be
deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent registration with any
other state Govt. or institutions. Copy of registration should be attached with tender document. Tenderer who
was not registred in AMC must be get registred in panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources Department
with the correction slips made up to 15-08-1999 may be referred. (only English version) Clause No. -2 liquidated
damages for delay shall be overrule by A.M.C.’s M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved" by the
Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to mean as
reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of specific
mention for a particulars point / aspect, the same in the relevant Indian Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest to the
following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness shall be
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its specifications
shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's Consultant shall
not absolve the contractor from the responsibility of replacing defective materials brought on site or materials
used in the work found defective at a later date. The contractor shall have no claim to any payment or
compensation whatsoever on account of any such materials being rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/ Architect
before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be removed from
the site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for checking
lines, levels, alignment of the works & all precautionary measures during execution shall have to be kept in
sufficient numbers and in good working condition at the site of the work. All excavated trench shall be kept
covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to be adopted
by the contractor shall be considered only if the contractor provided satisfactory evidence that such special mode
of construction and completion of work to the required strength and quality. Acceptance of the same by the
Engineer in charge shall not however, absolve the contractor from the responsibility of any adverse effect and
concordance of adopting the same in the course of exaction or completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the "Minor Mineral
Act", and such other laws and rules prescribed by the Government from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various relevant Indian
Standard) shall be taken to engrave the safety of men, materials and machinery on the work and also of the work
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the quantum of
actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items to be
executed & as per the instruction of Engineer in charge & as per the guidance of AMC's Consultant for this
20. The general terms & conditions of the contract shall be applicable & shall be binding on the contractor.
The contract agreement shall have to be executed between AMC & the agency to which work is awarded for
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of sanctioned
tender and resolution.Within 10 days contractor has to submit SD and after reciveing SD Work order shall be
issue to contractor and the time limit shall be start from the date of issue of the written work order to the
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of sanctioned tender and
resolution .Within 15 days contractor has to submit SD and after reciveing SD work order shall be issue to
contractor and the time limit shall be start from the date of issue of the written work order to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order / demand draft / cheque or
Bank Guarntee of nationalized bank/scheduled bank only. Contractor shall have to sign contract paper with
AMC. The contractor shall be fined 4% of interest per year for delay in submission of S.D and shall be deducted
from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by M.C. Or
His Designeted Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or specification and
the Engineer -in-charge shall make such corrections and interpretations as necessary to fulfill the intent of the
plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal Corporation. will
be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall be paid.
27. Contractor is requested to see the site physically before tendering. He is also requested to quote the rates
keeping in view of all the points mentioned in relevant pages of tender documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water for the
construction of the works and provide a satisfactory supply of potable water for drinking, washing, sanitation and
cleaning down. The contractor will be responsible for all the costs where applicable of connection, meter
installation, water consumed, water required for testing purposes, disconnection and the laying, maintenances
and ultimate removal of any distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the contractor must
make his own arrangements with the Corporation and Electricity Supply Authorities and with other contractors
to connect and to take a supply from such services, paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for purpose of the work
and shall pay such charges as is fixed by the appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power during the work. No
compensation shall be paid for idle labor staff, machineries and for use of diesel operating sets etc. as the case
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility criteria
mentioned above along with the bid. They shall have also to submit the income tax clearance certificate and
solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials advance will
32. The contractor shall get the electrical works executed through the authorized Government approved
licensed electrical person or firm in appropriate category in accordance to contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by Engineer in
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby total
amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the contractors.
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any respect will be
rejected. Municipal Commissioner reserves the right to increase/decrease the scope of work. No any claim to that
effect shall be entertained. The Municipal Commissioner also reserves the right to reject any or all the tenders
without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other special reason (like site is not
available and due to unavoidable circumstances arise), after evaluation of situation the actual date of starting of
work will be consider after approval of Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the scope of
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for the work done
by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ftb btxulwk xftJthe œh Jt¤wk xuLzh ylu ftuLx[tfx
xuLzhh btxule Nh<tuu
1 y: yt xuLzh su <u Jdolt y.Bgw.ftu y&Jt fuLî{ y&Jt htsg mhfthle btLg gtœelt ftuLx[fxhtu Che NfNu.dJobuLxlt btLg ftuLx[[tfxhu
y.Bgw.ftuvtuo. bt btLg ftuLx[[tfxhtu le gtœebtkk hSMxuNl fhtJJtlwk hnuNu.
1 c: btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
1 f: xuLzhhle jtgft<
ftb sJtcœth xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKebtk ytJ<t ntug <ubs ftb fhJt mûtb ntug <ublu s ytvJtbtkk
ytJNu. ftb yvt<t vnujt ftuLx[tfxhu ftb mkk<tu»tfthf <ubs xtRb jebexbtkk vwÁk fhJt sYhe mJj<,ylwCJ, ûtb<t ylu
VtgltLmegj hemtumo hsw fhJtlt hnuNu.
1 z: ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh mh¾gwjh,lk -
17,<t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve,heLgwyj Ve <&t yvd{uzuNl Ve ylu btv
œkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
1 R: xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkkath ylu JvhtNlt ceò
hM<tytu&e mkk<wÐ ntuJtlwk btle juJtbtkk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekkd(fu su ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm
btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekkd btxu, gtzo, zevtu btxule søgt vtu<tle he<u bu¤Je juJtle hnuNu.
(xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxule søgt)
2: yt ftble mbg bgtoœt xuLzhbtk sKtÔgt bwscle hnuNu. (bubtuhuLzbbt sKtJuj «btKu)
3: xuLzh Jujezexe rvhegz xuLzhbtk sKtÔgt bwsc hnuNu. (bubtuhuLzbbt sKtJuj «btKu)
4: xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
xuLzh Vtubo ylu ylwmwrabtkkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt œM<tJus vh< fhJtlt hnuNu.
6: ftuLx[tfxhtuyu leaule ctc<tu ft¤SvwJof JtkkaJt rJlkk<e Au.
1) J^w fu ytuAtle xftJthelt œh Nçœtu <ubs ytkkfztbtkk ytvJt.
2) ftuR fkkvlelu ltbu xuLzh juJtbkkt ytÔgwk ntug <tu fkkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk bwFðgthltbwk xuLzh mt&u hsw
3) Bgwrl.ftuvtuohuNllt «J<obtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle hnuNu.
4) ftuLx[tfxhu RLfbxuût mkkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
5) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
6) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
7) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
7: AufAtf xuLzh Chlthlu sKtJJtbtkk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt œuJtNu lrn ylu ytJe ftuR
AufAtf fu VuhVth juJtNu lrn, <ultkk jFtKbtkk ftuR Cwwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkkfzt vh Auftu bthelu <ult mtawk jFtK fu
ytkkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
8 y: xuLzh hsw fh<tkk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtkk ytÔgw lrn ntug <tu xuLzh ybtLg dKJtbkkt ytJNu
<ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg rlgbtu ylu mwaltytu vK ft¤SvwJof
JtkkaJt rJlkk<e Au.
1) ftuRvK fthK œNtoÔgt rmJtg ftuRvK fu c^t xuLzhtu yMJefth fhJtltu nf yctr^< hnu Au.
8 c: Wvhle ctc<tu Wvhtkk< xuLzh leault mkkstudtubtkk <h< ybtLg XhJtlu vtºt &Nu.
1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt rJd<tubtkk bwfuj Nh<
y&Jt mw^thtbtkk ftuR VuhVth mwaJ<t ntug.
2) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkkÏgwk/ltkkÏgt ntug fu cœÕgwk/cœÕgt ntug.
3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
5) xuLzh Chlth y&Jt vuZele ctc<btkk œhuf Ctdeœth y&Jt <u ykkdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l fhu y&Jt xuLzhbt <u
btxu htFJtbtkk ytJuje søgtbtkk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
8 f: Nh<e xuLzh MJefthJtbtk ytJNu lne.
8 z: xuLzh MJefthJw , hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe hnuNu. ftuR fthKmh stu
ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykkdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtu fhe NfNu lrn fu ftgœtfeg
ftgoJtne yt ykkdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s œuJtlwk Au <uJtu &R NfNu lrn.
9: rJmkkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtf btklt sÚ&t ylu hfble ftuRvK Cwjawf leault rlgbtu ylwmth mhCh fhJtbtkk
1) xuLzh Chlthu œhlt Ftltbtkk sKtJuj Nçœtu ylu ytkkfzt Jåau ftuR ymkkdr<lt fumbtkk Nçœtubtkk sKtJuj hfb btLg htFJtbtkk ytJNu.
2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtf lt Ftltbtkk&e hfbbtkk Cwj sKtg <tu yufb œh
btLg htFJtbkkt ytJNu ylu œhlt yt^thu dwKtfth mw^thJtbkkt ytJNu.
3) yufblt Ftltbtkk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkkt ytJNu.
4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkkfzu fhuj ftuR vK ctc< ægtlbtkk juJtbtkk ytJNu lrn.
10y: ftbltu «tud{um mbg bgtoœt bwsc fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk ytJNu. ylu <ubtk atjw
ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
10c: mûtb m•tt îtht xuLzhle bkswheltu XhtJ vtzgt ctœ ( LOI) ytvJtbtk ytJNu ðgth ctœ rœl - 15 btk rm¾gtuhexe zevtuÍex sbt
fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk «J<obtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
10f: bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu mbgbgtoœt ctœlt FhuFh ctfe ftble hfblt 10% juFu (jefJezexe
zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkkfujt œh vwhtk &gujt ftb btxult Au ylu <ubtk bswhe, vtjF, ÃjtLx,
œuFhuF,mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykkNu <btb Faoltu <&t sYh sKtg <tu ylu ðgthu ht<vt¤elt ftblu
juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkkfujt CtJ fu œh fh<t J^thtle ftuR awfJKe ykkdult <ublt ftuR œtJt ægtlbtkk juJtNu
lnekk ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu(vAe<u ctkk^ftb rJCtdltu fboathe ntug fu l ntug)<ublu ytvuje
btne<elu yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnekk. <ublw xuLzh ChJt <&t <ubtkk swœt swœt CtJ ylu œh ChJt btxu sYhe
yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtkk&e WCt &<t ftuR stuFb fu
sJtcœthebtkk&e Axfe NfNu lnekk. mœh ftbbtk ftuR vK ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
11 c: ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu.<&t Bgwrl. frb§h©e/mexe
Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt ckDlf<ot hnuNu.
11 f: ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx +
yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[[tfxhlt cejbtkk&e fvt< fhJtbt
12: yu)fhth mkkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce)xuLzhbtk œNtoJuj ftb mkkck^e œM<tJusbtkk œNtoJuj rJd<btkk rJmkkd<<tlt rfMmtbtk leau œNtoJuj ¢btlwmth
œM<tJusbtkk œNtoJuj rJd< d{tng htFJtbkkt ytJNu.
yu) yufb ylu fœ
2) xuLzh Vtubolwk CtJvºtf
z[tuRkdbtk fœ, ytfth, ytkkfzt fœta Ftuxt ntug <tu btvujtkk fœ, ytfthlu ylwmhJwk.
2) xuLzh Vtubole ylwmwra-ce
Cwj Chujt fu Ftuxt JKollt rfMmtbtkk yt mkkck^e Wvhefûttyu rJmkkd<<t ykdule ltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.le bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykkr<b dKJtbkkt ytJNu.
13 : xuLzhhu z[tuRkd fu MvuNeVefuNlbtkk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rl-atsuo Ãjtl <&t
MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
14 : yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
15 : yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
16 :atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu <ule mkvwKo sJtcœthe
(òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR btKmlt òlbtj lu lwfNtl &tg <ule
sJtcœthe ftuLx[tfxhle hnuNu.vtujem Vhegtœ &tg <tu <ule sJtcœthe vK ftuLxtfxhle hnuNu. CuFz Dme l vzu <ule sJtcœthe vK
vtujem Vhegtœbt ftuLx[tfxhle hnuNu.CuFz Dme l vzu <u btxu mjtb<elt vdjt (suJt fu œtuhzwk ctk^e bswh Ftztbtkk W<thJt, mtuhekkd
ylu Mx[[xekkd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtkk W<thNu <tu ftuLx[[tfxh s vtujem Vhegtœbt sJtcœth hnuNu ylu
Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu sJtcœth hnuNu lrn.ytxjwk mbSlu s xuLzh ChJwk. Bswhtultu rJbtu vK W<thJtu.
17 : ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t sYh sKtg <tu xuMxekd
fhtJJtlwk hnuNu.<&t yt ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgb bwsc bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl
sKtJu <u søgtyu fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu.
18 : M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u ykdu ftb fhJt
ftuLx[tfxh ck^tgujt Au.
19: mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh< jR sJtltu hnuNu.
yLg&t <ule lwfNtlle sJtcœthe ftuLx[tfxhle hnuNu.
20 :ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au.<ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch
yufx/vtujemlt ftgœtlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle hnuNu.
21: ftuRvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobt hnuNu.
22: btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu hnuNu.
23: ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
24: yt xuLzhbtkk stu ftuR ytRxb hne dR ntug <tu <u y&tJ M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe J^thtle ftbdehe fhJtle &tg
<uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk
25: atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[[tfxhle hnuNu. subtkk vevzt,œtuhzt, Cgmwaf ctuzo,ÃjtMxef vxe,rJ. ftuLx[tfxhu
jtJJtlwk ylu mtaJJtlwwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkkvwKo sJtcœthe ftuLx[tfxhle hnuNu.
26: M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt rfMmbtk juch yufx bwsc
fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtcœthe ftuLx[tfxhle hnuNu.
27: stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubt œhhtus fhuj ftbdehe <&t yr^ftheytuyu ftb mw^thJt fu
vtu{d{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu
ftuLx[tfxhlu vulÕxe fhJtle mððtt yuze.mexe yuLSlehgh©elu hnuNu.
28: œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl Nh<tu bwsc hnuNu su
ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze. mexe.yuLSlegh©eltu rlKog ytFhe hnuNu. Jtuxhekd fhJtbtk lrn ytJu fu œhhtus
J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu
ylu cejbtkk&e hfb ftve juJtbtk ytJNu.
29: juch JuÕVuh Vkkz btxu ntjbtkk htsg mhfth©eyu fhuj nwfb bwsc 1%(yuf xft) hfb cejbtk&e ftve juJtbt ytJNu.
30: su ftbtubtk atubtmtlt mbgdt¤tlu ctœ ytvJtle Nh<tultu WÕjuF ntug ðgtk atubtmtltu vehegz <t.15 swl &e 30 mÃxuBch Mþ^eltu
dKJtbtk ytJNu. yt mbg œhBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u mbgdt¤tu ctœ fhe ftble mbgbgtoœt dKJtbtk
ytJNu <&t sYhegt< Bþscle xtEb jebex J^the vK ytvJtbtk ytJNu.
31: ftuLx[tfxhu «J<obtl ybœtJtœ Bgw. ftuvtuohuNl lt JF<tuJF< lt mhfgwjh bwsc ve yuV,Jux <&t ylu muÕm xuût lu jd<t vwhtJt
vubuLx fh<e JF<u sYh vzu&e hsw fhJtlt hnuNu.
yufhthlwk Vtubo
1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk buk/ybu M&¤le bwjtft< je^e Au ylu ftblu
jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t œM<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (vrùb Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 months after the order to start the works. Progress of work should be in
proportion to time limit. The details of reinforcement of R.C.C. work shall be as per design and instructions of
Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be brought
by him on site. This account shall be regularly maintained and kept open for inspection by Municipal Staff.
Watering of all the items shall be as per instructions otherwise no payment shall be made to contractors. Mixing
of concrete shall be done by concrete mixer machine. Arrangements of binding vibrator for R.C.C. works if
required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor
shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He shall be
responsible for any damage to public. If any incident happen, during the execution of work. In case of dispute
for unseen or overlooked items the decision of the Dy. City Engineer shall be final. The contractor shall have to
give site clean of all rubbish during the work and at the time of completion of work and hand over the site with
final finishing of the work as directed. All the rejected materials shall be removed from site within 24 hours by
contractor at this risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to prepare
through of bigger size and mix the mortar in the required proportion. In on case he shall be allowed to mix the
mortar either on floor or any finished surfaces. The contractor shall have to make his own arrangement for water
required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he
shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not available
in SOR than based on current market rates. In case of extra item decision of Add. City Engg. shall remain final
regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work the
contractor shall carry out the same at his quoted rates without charges any extra and the contractor will have to
carry out the works and he will be paid at the rate quoted by him. No claim for extra rate for subsequent changes
in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to
prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to
The tender for the work shall remain open for a period (180) days from the date of opening of the tenders for
this work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during the
period. If any tenderer withdraw or makes any modifications or addition in the terms and conditions of his
tender not acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to any
right or remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition delay of start shall be
recovered separately from the immediate bills payable to the contractor. Contractor has to make his own
arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form
B1 can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets
of Building Works & and Road Works Specifications published by Gujarat Book Depot, Sector-21.
CONTRACTOR'SSIGNATURE ADDL.CITYENGINEER
& STAMP (West Zone)
TECHNICAL SPECIFICATIONS
AHMEDABAD MUNICIPAL CORPORATION ENGINEER DEPARTMENT
TECHNICAL SPECIFICATION
Name of Work :- Water related complaints such as leakage repair, laying new water lines regarding low
water pressure/pollution, and to do necessary water related work for the disposal of the complaint, as well
as to do water related work from the budget of the Hon. MLA, Municipal Councilor and from other budgets
(ARC) work In the West Zone Vasana Ward.
SPECIFICATIONS OF MATERIALS
1.1. Water shall not be salty or brackish and shall be clean, reasonably clear and free objectionable
quantities of silt and traces of oil and injurious alkalis, salts, organic matter and other deleterious
material which will either weaken the mortar or concrete or cause efflorescence or attack the steel in
R.C.C Container for transport, storage and handling of water shall be clean. Water shall conform to the
standards specified in I.S.456-1978.
1.2. If required by the Engineer-in-charge it shall be tested by comparison with distilled water. Comparison
shall be made by means of standard cement tests for soundness, time of setting and mortar strength as
specified in I.S.269-1976. Any indication of unsoundness, change in time of setting by 30 minutes or
more or decrease of more than 10 per cent in strength of mortar prepared with water sample when
compared with the results obtained with mortar prepared with distilled water shall be sufficient cause
for rejection of water under test.
1.3. Water for curing mortar, concrete or masonry should not be too acidic or too alkaline. It shall be free of
elements which significantly affect the hydration reaction or otherwise interfere with the hardening of
concrete during curing or those which produce objectionable stains or other unsightly deposits on
concrete or mortar surfaces.
1.4. Hard and bitter water shall not be used for curing.
1.5. Portable water will be generally found suitable for curing mortar or concrete.
3.1 Cement shall be ordinary Portland slag cement as per I.S. 269-1976 or Portland slag cement as per I.S.
M-4. White Cement :
4.1 The white cement shall conform to I.S. 80412-E
M-5. Coloured Cement:
5.1 Coloured cement shall be with white or gray Portland cement as specified in the item of the work.
5.2 The pigments used for coloured cement shall be of approved quality and shall not exceed 10% of
cement used in the Mix. The mixture of pigment shall be properly grounded to have a uniform colour
and shade. The pigments shall have such properties to provide for durability under exposure to sunlight
5.3 The pigment shall have the property such that it is neither by the cement nor detrimental to it.
6.1. Sand shall be natural sand, clean, well graded, hard strong durable and gritty particle free from injurious
amounts of dust clay, kankar nodules, soft or flaky particles shale, alkali, salts organic matter, loam,
mica or another deleterious substance and shall be got approved from the Engineer-in-charge. The sand
shall not contain more than 8 percent of silt as determined by field test. If necessary the sand shall be
washed to make it clean.
6.2. Coarse Sand : The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed
The sieve analysis of coarse shall be as under:
IS Sieve Percentage by weight IS Sieve Percentage by weight
Designation Passing Sieve Designation Passing Sieve
6.3 Fine Sand: The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand shall be as under:
IS Sieve Percentage by weight IS Sieve Percentage by weight
Designation Passing Sieve Designation Passing Sieve
M-8. Stone Grit:
8.1. Grit shall consist of crushed or broken stone and be hard strong, dense, durable, clean, of proper
gradation and free from skin or coating likely to prevent adhesion of mortar Grit shall generally be
cubical in shape and as far as possible flaky elongated pieces shall be avoided. It shall generally comply
with the provisions of I.S. 383-1970. Unless special stone of particular quarries is mentioned, grit shall
be obtained from the best black trap or equivalent hard stone as approved by the Engineer-in-charge.
The grit shall have no deleterious reaction with cement.
8.2. The grit shall conform to the following gradation as per sieve analysis:
IS Sieve Percentage by weight IS Sieve Percentage by weight
Designation through Sieve Designation through Sieve
8.3. The crushing strength of grit will be such as to allow the concrete in which it is used to used to built up
the specified strength of concrete.
8.4. The necessary tests for grit shall carried out as per the requirements of I.S.2386(Parts I to VII) 1963, as
per instructions of the Engineer-in-charge. The necessity of test will be decided by the Engineer-in-
charge. The necessity of test will be decided by the Engineer-in-charge.
Sand: Sand Shall conform to specification M-6.
10.1. Proportion of Mix : 10.2.1. Mortar shall consist of such proportions of slaked lime and sand as may be
specified in the item. The slaked lime and sand be measured by volume.
10.2. Preparation of Mortar :
10.3.1. Lime mortar shall be prepared by wet process as per I.S. 1625-1971. Power driven mill shall be used for
preparation of lime mortar. The slaked lime shall be placed in the mill in an even layer and ground for
the 180 revolutions with a sufficient water. Water shall be added as required during grinding (care being
taken not to add more water) that will bring the mixed material to a consistency of stiff paste.
Thoroughly wetted sand shall then be added evenly and the mixture ground for another
10.3. Storage : 10.4.1 Mortar shall always be kept damp, protected form sum and rain till used up , covering it
by tarpaulin or open sheds.
10.4. Use : 10.5.1 All mortar shall be used as soon as possible after grinding it should be used on the day on
which it is prepared. But in no case mortar made earlier than 36 hours shall be permitted for use.
LABOUR WORK OF LAYING AND JOINTING OF /CAST IRON PIPES.
LABOUR WORK OF LAYING AND JOINTING OF CAST IRON SLUICEVALVES. & BEND AND
LABOUR WORK OF LAYING AND JOINTING OF CAST IRON TEE.
LABOUR CHARGES FOR FIXING ANY KIND OF SPECIALS & MAKING CONNECTION OF
PROPOSED LINE WITH EXISTING MUNI.MAIN.
This Specification covers the requirements for collecting from Municipal Stores or contractor’s stack yard transportation of cast to
work sites lying jointing and field testing of cast iron pipes and fittings for the water distribution Network.
The mode of measurnment shall be on Rmt basis.
CARTING AND HANDLING:
Cast iron pipes fittings (specials) and valves with tail pieces shall be transported from the Municipal Stores or contractor’s stack yard to the work sites at
places along the alignment of pipeline as directed by Owner /Engineer. The Contractor shall be responsible for the safety of pipes fitting and vales with tail
pieces in transit loading/unloading. Every care shall be exercised in handling pipes and fittings to avoid damage. While unloading the pipes and fittings shall
with steadying ropes of by any other means. Padding shall be provided between coated pipes fittings and skids to avoid damage to the coating Suitable gape
between pipes should be lift at intervals in order to permit access from one side to the other. In case of spigot socket pipes care should be taken regarding
orientations pipes while unloading. As far as possible pipes shall be ulna added on one side of the stretch only. The pipes shall be checked for any visible
damage (such as broken edges cracking or spelling of pipe) while undo adding and shall be sorted out for reclamation any pipe which shows sufficient
damage to preclude it from being used shall be discarded shall be prohibited. Necessary warning boards and lamps should be provided in front and side of
pipes to avoid any accident. Pipes should be stacked with sufficient packing to prevent rolling of the same. Contractor will be fully responsible for any
accident due to pipes or other materials stacked on site of yard. Contractor will be fully responsible for any legal formalities arising due to such accident and
all legal charges there of shall be paid by contractor of will be recovered from his running bill of the same or other AMC works.
Each stack of pipes shall contain only pipes of same class and size, with consignment or batch number
marked on it with particulars of supplies wherever possible storage shall be done on film level and clan
ground and wedges shall be provided at the bottom layer to keep the stack stable. The stack shall be in
pyramid shape or the laid lengthwise and crosswise in altimeter layers. The pyramid stack shall be made
for smaller diameter pipes for conserving space in storing them. The height of the stock shall not exceed
1.5m. Fitting and sluice valves with tail pieces shall be stacked under cover and separated from pipes.
Rubber rings shall be stored in clean cool store away from windows boiler electrical equipment and
petrol oils or other chemicals particularly in the field where the rubber nods are being used it is
desirable that they are left out on the ground in the sun or overmuch under heavy frost of snow
LAYING - GENERAL
The Contractor shall visit the before tendering and get himself acquainted site condition and the
regulations regarding the laying of pipes in congested areas heavy traffics areas etc. The successful
bidder shall take the necessary permission and clearance of all the authorities like dip ardent of ads
traffic water supply and the drainage electricity broad telephone comp any etc. Wherever necessary.
Road reinstatement shall not be included in back filling unless specified.
To protect person from injury and to avoid damage to property adequate barricades construction signs
red lanterns and guards as required shall be placed and mainlined during the progress of the
construction work and unit it is safe for the traffics to use the roadways. The relevant Indian standards
and the rules and regulations of the local authorities in regarded to safety provisions shall be observed.
General lighting for works site, warning lights, sign boards, fencing etc. shall be provided by contractor
at his own cost.
Suitable fencing shall be provided along the sides of trenches and pits. The post of the fencing shall be
of timber securely fixed in the ground not more then 3m.apart and they shall be less than 75 mm in
diameter of less than 1.2 m above the surface of the ground. There shall be two rails. One near the top
of the post and the other about 450 mm. above the ground and each shall be from 50mmto 70mm in
diameter and sufficiently long to run from post to post which they shall be bound with strong rope. The
method of projecting rails beyond the posts and tying them together where they meet will not be
allowed on any account. All along the edges of the excavated trenches a bank of earth about 1.2. m high
shall be formed as required by the Owner/Engineer for further protection. The above work shall not be
paid for separately and the contractor shall take into account the costs of such works and quote
Whole work shall done within 24 hrs. By parts or whole work so that water supply from AMC shall not
The excavation in the foundation shall be carried out in true and level and shall have the width
and depth as required and as directed. The Contractor shall provide necessary slopes to a safe angle or
steps as required or directed at his own cost No extra payment shall be made for such precautionary
measures taken. The bottom of the excavated area shall be leveled both longitudinally and transversely
as directed by removing excess soil and watering as required. No earth filling will be allowed for bringing
it to level if by mistake or any other reason excavation is made deeper or wider than as directed. The
extra depth or width shall be made up with concrete of the same proportion as specified for the
foundation concrete at the cost of the contractor. The excavation up to any required depth shall be
carried out under this item as required and directed by engineer in charge.
Surface Excavation for Road Work:
Excavation exceeding 1.5 mm in width and 10 sq mm on plan but not exceeding 30 cm in depth in all
kinds of soil which are specified shall be as treated as surface excavation.
Excavation in trenches for service lines- Water supply and Drainage:
Excavation in trenches shall be carried out in any material encountered on the site to enable the service
lines to be laid to the lines and levels shown and as directed. Excavation shall be made with adequate
and stable side slopes or shoring strutting if necessary. The contractor shall provide all measures to
protect adjoining properties service limes etc. The contractor shall take necessary action to keep
excavation free from water.
Trenches shall be wide enough to provide sufficient space for joining and inspection. The trench bed
shall be trimmed and rammed with sprinkling of sand or murmur so that the pipes when laid to the
required levels and gradients shall be no the bottom fully supported along the entire length of the pipe.
The trench shall be deepened and widened locally to receive the sockets and to permit the joint to be
made and inspected.
Before excavation is started rails shall be erected at convenient places and at all changes of direction
and gradients at a definite and as far as practicable uniform height above the proposed invert level of
the pipes the center lime being clearly marked on each horizontal rail. The depth of excavation and level
of the pipe invert shall be checked by means of benching road of appropriate lengths.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used for filling the trenches and plinth or leveling the
ground in layers including ramming and watering etc. complete. The Contractor shall remove the
balance of the excavated from the site of work to a place as directed within a lead unto 50mm and for
Filing of Trenches:
As soon as the work in foundation has been completed and measured the sides of foundation shall be
cleared of all dedans brick bats mortar dropping etc. and filled with earth in layers not exceeding 15 cm
each layer shall be adequately watered rammed well and consolidated before the succeeding layer is
laid. The earth shall be rammed with iron rammers where feasible and with the butt ends in layer of
crowbars where rammer cannot be used. The plinth shall be similarly filled with earth in layers not
exceeding 15 cm adequately watered and consolidated by ramming with iron or wooden rammers.
When filling reaches finished level the surface shall be flooded with water for at least 24 hours and
allowed to dry and then rammed and consolidated. The finished level of filing shall be kept to shape and
gradient intended to receive any floor finish. The excavated stuff of the selected type only shall be
allowed to be used for filling the trenches and plinths. Under no circumstances black cotton soil shall be
used for filling the plinths.
FILLING MATERIALS:
Filling materials may be either excavated stuff of selected materials brought from outside. Excavated
stuff or selected earth to be used shall be cleared of all rubbish large size stones brick bats etc.
complete and big clods shall be broken down to a size of 50 mm or less. The selected soil and or
murmur or any other materials shall be got approved before filling.
Refilling shall be done in a systematic manner by the contractor before refilling starts, the contractor
shall got checked the trenches ready for refilling.
The space between foundation masonry concrete pipe line and the sides of excavation and/or bottom
of found at ion shall be refilled to the original surface or up to plinth level with earth or selected
materials in layers of 15 cm to 20 cm each well watered and rammed.
Each layer shall be watered and compacted with heavy rammer before the upper layer is laid till the
final level is reached to form a thoroughly compacted base.
Refilling on top of pipe shall be carried out carefully with selected soft stuff out of the excavated stuff.
The refilling shall be raised about 5 cams. For subsequent settlements.
The contractor shall be responsible for any settlement during passage of time of during monsoon and
the same shall be refilled with stuff brought from the out sideif necessary.
The process of refilling brunches in plinth watering ramming shall be carried out in such a way as not to
danger to pipe line for foundation footing plinth well etc. already laid or built up.
If watering is not done by contractor with its own arrange meant watering charges at 20% of this item
rate shall be deducted from the bill against this item.
The rubber ring shall be stored in a cool dark dry and dust free environment The storage shall not be
exposed to direct sunlight or any heat radiating appliance. The rings shall not be allowed to come in
contact with any fuels and shall be stored free of tension.
Rubber rings shall be clearly labeled in bundles to indicate the type of ring. The size of pipes for which
they are to be used the manufacturer’s name or trademark and the month and the year of
The rings shall comply with IS 5382 regarding their material finish tolerance in dimension and physical
The rubber rings shall be such that they shall not show any signs of deterioration for any reason during
the contract period plus the defects liability period, Entire expenses associated with correcting defects
in this regard including replacement of rubber rings shall be fully borne by the contractor.
In jointing cast iron spigot and socket pipes and fitting with tycoon flexible joints the contractor shall
take into account the manufacturer’s recommendations as to the methods and equipment to be used in
assembling the joints. In particular the contractor shall ensure that the spigot end of the pipe to be
jointed is smooth and has been properly chamfered that the rubber ring as per IS 5382 is correctly
positioned in the socket and that the two pipes are accurately in line, before the joint is maid. The
rubber rings and any recommended lubricant shall be obtained only through the pipe supplier or as
directed by the Engineer.
LEAD CAULKING JOINTS
The jointing shall be done with molten lead and spun yam. Pin lead shall be of uniform quality clean and
free from foreign materials. It shall be of uniform softness capable of being easily caulked or driven. It
shall conform to IS: 782 Spun yarn shall be of clean hemp and of good quality. It shall conform to IS:
6587 its quantity shall be as follows.
Quantities of spun Yarn for Different Sizes of Pipes
(Materials for single collar joints)
Nominal Internal Diameter mm Spun Yarn Mass Kg
Note: Under special circumstances the Engineer-in-charge may decide the quantities of spun yarn depending
upon the site conditions. The quantity of different diameters of C.L. pipes and fittings shall be as
QUANTITIES OF LEAD YARN FOR DIFFERENT SIZES OF PIPES
Normal Size of Pipe mm Lead/ Joint Kg Depth of lead Joint mm
Note: The quantities of lead given are provisional and a variation of 20 percent is permissible either way.
Lead shall be heated in a melting pot kept in easy reach of the joint to be poured so that the molten metal will not be chilled in being carried from the
melting pot to the joint and shall be brought to a proper temperature so that when stirred it will show a rapid change of color. Before pouring all scum shall
be removed. Each joint shall be made with one continuous pour filling of the entire joint space with solid lead. Spongy or imperfectly filled joints shall be
bunt out and repaired.
The joint runner shall fit snugly against the face of the socket and the outside of the pipe shall be
dammed with clay to from a pouring lip to provide for filling the joint flush with the face and to the top
The jointed is done by first caulking in spun yam, then filling the remainder of the joint space by running
in molten lead, taking care that no dross enters the joint and then thoroughly caulking the lead. The
spun yam shall be used to center the spigot in the socket and to prevent the flow of molten lead into
the bore of the pipe.
After the lead has been run into the joint the lead shall be thoroughly caulked. Caulking of joints shall be
done after a convenient length of the pipes has been laid and leaded. The leading ring shall first be
removed and any lead outside the socket shall be removed with a flat chisel and then joint caulked
removed with a flat chisel and then the joint caulked around three times with caulking tools of
increasing thickness and hammer of 2 kg. Weight Lead run joints shall be preferably finished 3 mm
behind the socket face. The joints shall not be covered till the pipe line has been tested under specified
hydrostatic test pressure, though the rest of the pipe line should be covered up to prevent expansion
and contraction due to variation in temperature.
Filling available excavated earth (excluding rock) in trenches plinth sides of foundation etc. in layers not
exceeding 20 cams. In depth consolidating each deposited layer by ramming and watering.
The refilling will generally refer to refilling of pipe line trenches, foundation trenches up to plinth level
or ground level with excavated stuff selected soil brought from outside.
Clearing or Trenches or Ground:
The excavated trenches for foundation or ground over which filling is to be done shall be cleared off all
grass loose stones rubbish of all kinds brick bats as well as tress roots etc.
They shall be well watered before stuff is laid.
Mode of measurement for Item Laying Of WPL line shall be paid on Rmt basis.
Mode of measurement for Item of Sluice Valve Measurement shall be paid on No basis.
Mode of measurement for Item of fixing other specials Measurement shall be paid on weight Kg.
basis. The weight will be calculated as per standard ISI weight of every special.
Mode of measurement for connection of proposed line with Muni. Main Measurement shall be paid
Labour charges for installing and jointing Sluice Valves including loading,transporting from owner's
store, lowering in location to the required with excavation refilling alignment by crane/ tripod and chain
block including cost of total nos. of nuts, bolts, Necessary gaskets and excluding fixing of tail pieces with
lead & jute etc complete as directed by Engg. in charge
The mode of measurnment shall be on Nos. basis.
Labour Charges for removing and recover of ex. C.I.Sluice valve with tail pieces and carting it up to
Muni.Store or site as per instruction of Engg.In charge item include. necessary Excavation, removing
or making joints,refilling etc.comp. as directed by Engg in charge.
The mode of measurnment shall be on Nos. basis.
Cutting of existing pipelines of following diameters including carting of nece. specials from AMC store
to site and from site to AMC store (recovered materials) nace. labours for excavation, jodan &
backfilling fitter, supervisor,etc. complete. Rate also includes electric cutter, dewatering pump fuel
and transportation of machineries, chain pulley block if requires working at an instructed specific time
of day or night etc. complete.
Cutting existing line of following diameters, recovery loading and carting back to AMC store of existing
specials including all allied works like pumping out water, working in wet condition working at an
instructed specific time of day or night.
The excavation for jointing work shall be done to the required width length and depth as directed
by Engineer - in - charge or his representative. The excavated materials from the gap shall have to be
deposited within a lead of 50mt. or as directed by Engineer - in- charge. The relevant
specification fore excavation and refilling shall conform to Item No. 1. above.
After completion of excavation work jointing shall be done between the periods of two water
supply time in such a way that it will not affect the water supply time in any part of city. This item
includes the work of cutting the existing lime labors for jointing of C.I. specials and valves
with the existing line the dewatering required etc. complete.
All the necessary care shall be taken by the contractor during jointing work so that pipe shall
not be cracked beyond the cutting limit.
After completion of jointing work and testing of lead joints. The gap shall be refilled after obtaining
necessary permission of Eng ineer - in- charge of the work.
The jointing work shall be in line and level with other existing network.
The payment shall be in made on No basis for all the jointing work made for this work.
The mode of measurnment shall be on Nos. basis.
Labours charges for collecting specials from Municipals store loading,transportation, unloading to
the site, laying and fixing CI specials inclusive of all jointing materials like lead, spun etc.and labour,
exacavation re-filling and nece. dewatering as per instrucation of engg. incharge
The mode of measurnment shall be on Kg. basis.
Fixing of valve Road box incl .locating valve, nece. excavation, Brick Masonary,PCC work. Item also
inclues cartring form AMC store to site. Etc.Comp. as directed
The mode of measurnment shall be on per No. basis.
Labour charges for repairing of lekage CI/Di pipe line for following dia different places
including necessary excavation manually or by machinery removing mud dewatering cleaning of pipe
and leakafe portion and repairing by inserting lead wool jute tools required for inserting lead wool
hiring charges of excavators Hydra/crane j.c.b dewatering set fuel operator cost of lead wool etc
complete(including all material but excluding cost of pipel)
The mode of measurnment shall be on per no basis.
Excavation for trail pit of maximum diamension of 1.5 mt x0.75 x 1.5 mt depth for location of existing
line including excavation but excluding cost asphalt cutting but including refilling, watering etc. comp as
per instruction of Engg in charge.
The mode of measurnment shall be on Nos. basis.
Making hole on existing CI/DI/MS water pipe line including nacessary GI fittings item also includes
necessary excavation, dewatering and refilling as per instruction engg. In charge etc.comp.
The mode of measurnment shall be on Nos. basis.
Labour Work for temp Jodan of ex.line for running water supply incl making collar between gap
of pipe & jointing with jute & day after removing all this as per inst etc.comp as dire.
The mode of measurnment shall be on Nos. basis.
Labour charges for doing washout of water pipe line at end including necessary excavation refilling the
pit. Allowing the water to flow for 15 minutes twice or thrice as per site condition during supply hour,
dewatering the pit and plugging with existing wooden butch. etc. comp. as per instruction.
The mode of measurnment shall be on Nos. basis.
Supplying wooden taper bunches from jungle wood (Like limda, ambo)Etc.comp.
The mode of measurnment shall be on Nos. basis.
Conveyance charge of earth ,lime,murrum, building rubbish,manual garbage,sludge,excavated rock ,fly
ash, aggregate of any kind etc. comp.up to 5.0 Km. Lead
The mode of measurnment shall be on Cmt basis.
Extra rate over item of excavation of earth for excavation of asphalt pavement of thickness up to
meter including demolishing the asphalt carpet,metal,soiling etc.comp. with stacking the material as
a) up to 0.20 meter thickness (By Manual)
b) Up to 0.30 meter (By Breaker Machine including cost of operator, fuel, & transportation etc
c) 0.30 meter & above (By Breaker Machine including cost of operator,fuel & transportation etc
The mode of measurnment shall be on Smt basis.
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc.Complete as Directed. (No payment should be allowed for non working
condition of machinery and for pipe line excavation and M.H. work.Allowed only for break down work)
The mode of measurnment shall be on Hr. basis.
Providing & Supplying JCB Machine on rental basis in case of emergency situation and break down type
work & also during unavoidable condition as per instruction of engg.incharge , rate includes all nece.
shifting, fuel and operating charges and stacking of useful & non-useful materials separately up to store.
(No payment should be allowed for non working condition of machinery and for pipe line excavation
and laying work)
The mode of measurnment shall be on Hr basis.
Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed
etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for non working
condition of machinery )
The mode of measurnment shall be on shift basis.
Providing, laying and jointing in true line and level U.P.V.C pipe (SCH - 40) of following dia. including
fittings of standard make as approved by Engineer
- in - charge. Pipe shall be fixed on the wall with the help of clamp at every 2000 mm centre to centre or
shall be concealed as directed including necessary fittings etc. including testing of pipe and joints and
fixing the same with adhesive solvent, including cost of all materials.
The mode of measurnment shall be on Rmt basis.
Supplying, labour for excavation of all types of soil at any depth including excavation of asphalt
pavement of any thickness, demolition of brick work in CM of any proportion including stacking of
serviceable materials and disposal of unserviceable material etc. comp. as directed.
The mode of measurnment shall be on No. basis.
Barricading the entire break down or excavated area on rental basis using wooden ballies / M.S.angles
at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to avoid accident &
for smooth traffic diversion & movement including cautionary board etc. Item also includes for making
temporary sufficient nos of lighting arrangement through out the work with necessary required
arrangement. The same shall be removed after completion of work. (Only for break down work from
start to complete).
The mode of measurnment shall be on Rmt. basis.
Labour work for fixing interlocking blocks/any kind of pavment on up to 50 mm th sand bedding,
levelling, watering and fixing in line & level as well cleaning the site etc.comp.as.directed.
The mode of measurnment shall be on Smt. basis.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in mechanical mix plant carriage ofmixed
Materialby tipper to site, laying inuniform layers insubbase/ base course on wellprepared surface and
compacting with vibratory roller to achieve the desired density as per Codal Provision.
Production & Supply of WMM
The mode of measurnment shall be on Cmt. basis.
Contractor’s Signature Add. Cit y Engi neer
And All type ON SITE Material responsibility only Labour contractor.
APPLICABLE CODES:
Various operations such as transport to work sites lowering in trenches laying jointing and
field testing of cast iron pipes and fittings shall comply with all currently applicable standards. In
all cases the latest revision of the standards shall be referred to. If requirements of this specification
conflict with the requirements of the standards this specification shall grove.
(a) IS:638Specificationforsheetrubberjointingandrubberinsertingjointing.
(b) IS:782Specificationforcaulkinglead.
(c) IS:1538SpecificationforcastionfittingsforPressurepipesforwatergasandsewage.
(d) IS:3114Codeofpracticeforlayingofcast-iron.
(e) IS:3400Methodsoftestforvulcanizedrubber(Partsto20)
(f) IS:5382SpecificationforrubbersealingringforGasmainswaterandsewers.
(g) IS:6587Specificationforspun/yarn.
CARTINGANDHANDLING:
Cast iron pipes fittings (specials) and valves with tail pieces shall be transported from the
Municipal Stores or contractor’s stack yard to the work sites at places along the alignment of
pipeline as directed by Owner /Engineer. The Contractor shall be responsible for the safety of
pipesfittingandvales withtailpiecesintransit loading/unloading.Everycare shallbeexercisedin
handling pipes and fittings to avoid damage. While unloading the pipes and fittings shall with
steadying ropes of by any other means. Padding shall be provided between coated pipes fittings
and skidstoavoiddamagetothecoatingSuitablegapebetweenpipesshouldbelift at intervalsin order to
permit access from one side to the other. In case of spigot socket pipes care should be taken
regarding orientations pipes while unloading. As far as possible pipes shall be ulna addedon one
side of the stretch only. Thepipesshallbe checked for any visibledamage (suchas broken edges
cracking or spelling of pipe) while undo adding and shall be sorted out for reclamation any pipe
which shows sufficient damage to preclude it from being used shall be discarded shall be
prohibited. Necessary warning boards and lamps should be provided in front and side of pipes to
avoid any accident.Pipesshouldbe stacked withsufficient packingtoprevent rollingof the same.
Contractor will be fully responsible for any accident due to pipes or other materials stacked on site
of yard. Contractor will be fully responsible for any legal formalities arising due to such accident
and all legal charges there of shall be paid by contractor of will be recovered from his running bill
of the same or other AMC works.
Each stack of pipes shall contain only pipes of same class and size, with consignment or
batch number marked on it with particulars of supplies wherever possible storage shall be done on
film level and clean ground and wedges shall be provided at the bottom layer to keep
thestackstable. Thestackshallbe inpyramidshapeorthelaid lengthwise andcrosswise inaltimeter
layers.Thepyramidstackshallbe madeforsmallerdiameterpipesforconserving spacein storing
them.The height of the stock shall not exceed 1.5m. Fitting and sluice valves with tail piecesshall
be stacked under coverand separated frompipes. Rubberringsshallbe stored in clean coolstore away
from windows boiler electrical equipment and petrol oils or other chemicals Particularly in the
field where the rubber nods are being used it is desirable that they are left out on the ground in the
sun or overmuch under heavy frost of snow conditions.
The Contractor shall visit the before tendering and get himself acquainted site condition
and the regulations regarding the laying of pipes in congested areas heavy traffics areas etc. The
successful bidder shall take the necessary permission and clearance of all the authorities like
department of ads traffic water supply and the drainage electricity broad telephone comp anyetc.
Wherever necessary.
Roadreinstatementshallnotbeincludedinbackfillingunlessspecified.
To protect person from injury and to avoid damage to property adequate barricades
construction signs red lanterns and guards as required shall be placed and main lined during the
progress of the construction work and unit it is safe for the traffics to use the roadways. The
relevant Indian standards and the rules and regulations of the local authorities in regarded to safety
provisions shall be observed.
General lighting for works site, warning lights, sign boards, fencing etc. shall be provided
by contractor at his own cost.
Suitable fencing shall be provided along the sides of trenches and pits. The post of the
fencing shall be of timber securely fixed in the ground not more then 3m.apart and they shall be
less than 75 mm in diameter of less than 1.2 m above the surface of the ground. There shall be two
rails. One near the top of the post and the other about 450 mm. Above the ground and each shall be
from 50mm to 70mm in diameter and sufficiently long to run from post to post which they shall be
bound with strong rope. The method of projecting rails beyond the posts and tying them together
where they meet will not be allowed on any account. All along the edges of the excavated trenches
a bank of earth about 1.2. m high shall be formed as required by the Owner/Engineer for further
protection. The above work shall not be paid for separately and the contractor shall take into
account the costs of such works and quote accordingly.
Whole work shall done within 24 hrs. by parts or whole work so that water supply from
AMC shall not be disturbed.
The excavation in the foundation shall be carried out in true and level and shall have the
width and depth as required and as directed. The Contractor shall provide necessary slopes to a
safeangleorstepsasrequiredordirectedathisowncostNoextrapaymentshallbemadeforsuch
precautionary measures taken. The bottom of the excavated area shall be leveled both
longitudinally and transversely as directed by removing excess soil and watering as required. No
earth filling will be allowed for bringing it to level if by mistake or any other reason excavation is
made deeper or wider than asdirected. The extra depth or width shallbe made up with concrete of
the same proportion as specifiedfor the foundation concrete at the cost of the contractor.The
excavation up to any required depth shall be carried out under this item as required and directed by
engineer in charge.
SurfaceExcavationforRoadWork:
Excavation exceeding 1.5 mm in width and 10 sq mm on plan but not exceeding 30 cm in
depth in all kinds of soil which are specified shall be as treated as surface excavation.
Excavationintrenchesforservicelines-WatersupplyandDrainage:
Excavation in trenches shall be carried out in any material encountered on the site to enable
the service lines to be laid to the lines and levels shown and as directed. Excavation shall be made
with adequate and stable side slopes or shoring strutting if necessary. The contractor shall provide
all measures to protect adjoining properties service limes etc. The contractor shall take necessary
action to keep excavation free from water.
Trenches shall be wide enough to provide sufficient space for joining and inspection. The
trench bed shall be trimmed and rammed with sprinkling of sand or murmur so that the pipes when
laid to the required levels and gradients shall be no the bottom fully supported along the
entirelengthofthepipe.Thetrenchshall bedeepenedandwidenedlocallyto receivethesockets and to
permit the joint to be made and inspected.
Before excavation is started rails shall be erected at convenient places and at all changes of
direction and gradients at a definite and as far as practicable uniform height above the proposed
invert level of the pipes the center lime being clearly marked on each horizontal rail. The depth of
excavation and level of the pipe invert shall be checked by means of benching road of appropriate
DisposaloftheExcavatedStuff:
The excavated stuff of the selected type shall be used for filling the trenches and plinth or
leveling the ground in layers including ramming and watering etc. complete. The Contractor shall
remove the balance of the excavated from the site of work to a place as directed within a lead unto
50mm and for all lift.
FilingofTrenches:
As soon as the work in foundation has been completed and measured the sides of
foundation shall be cleared of all dedans brick bats mortar dropping etc. and filled with earth in
layers not exceeding 15 cm Each layer shall be adequately watered rammed well andconsolidated
before the succeeding layer is laid. The earth shall be rammed with iron rammers where feasible
and with the butt ends in layer of crowbars where rammer cannot be used. The plinth shall be
similarly filled with earth in layers not exceeding 15 cm adequately watered and consolidated by
ramming with iron or wooden rammers. When filling reaches finished level the
surfaceshallbefloodedwith waterforatleast24hoursand allowedtodryandthenrammedand
consolidated. The finished level of filing shall be kept to shape and gradient intended to receive
any floor finish. The excavated stuff of the selected type only shall be allowed to be used forfilling
the trenches and plinths. Under no circumstances black cotton soil shall be used for filling the
FILLINGMATERIALS:
Filling materialsmay be either excavated stuff ofselected materialsbrought fromoutside.
Excavated stuff or selected earth to be used shall be cleared of all rubbish large size stones brick
batsetc. complete andbig clodsshallbe brokendown toasizeof50mmor less. Theselectedsoil and or
murmur or any other materials shall be got approved before filling.
Refilling shall be done in a systematic manner by the contractor before refilling starts, the
contractor shall got checked the trenches ready for refilling.
The space between foundation masonry concrete pipe line and the sides of excavation
and/or bottom of found at ion shall be refilled to the original surface or up to plinth level with earth
or selected materials in layers of 15 cm to 20 cm each well watered and rammed.
Each layer shall be watered and compacted with heavy rammer before the upper layer is laid till
the final level is reached to form a thoroughly compacted base.
Refilling on top of pipe shall be carried out carefully with selected soft stuff out of the
excavated stuff. The refilling shall be raised about 5 cams. For subsequent settlements.
Thecontractorshallberesponsibleforanysettlementduringpassageoftime ofduringmonsoon and the
same shall be refilled with stuff brought from the out side if necessary.
The process of refilling brunches in plinth watering ramming shall be carried out in such a
way as not to danger to pipe line for foundation footing plinth well etc. already laid or built up.
If watering isnot done by contractor with its own arrange meant watering charges at 20% of
this item rate shall be deducted from the bill against this item.
The rubber ring shall be stored in a cool dark dry and dust free environment The storage
shall not be exposed to direct sunlight or any heat radiating appliance. The rings shall not be
allowed to come in contact with any fuels and shall be stored free of tension.
Rubber rings shall be clearly labeled in bundles to indicate the type of ring. The size of
pipes for which they are to be used the manufacturer’s name or trademark and the month and the
year of manufacture.
The rings shall comply with IS 5382 regarding their material finish tolerance in dimension
and physical requirement.
The rubber rings shall be such that they shall not show any signs of deterioration for any
reason during the contract period plus the defects liability period, Entire expenses associatedwith
correctingdefects inthisregard includingreplacementof rubberringsshallbefullyborneby the
In jointing cast iron spigot and socket pipes and fitting with tycoon flexible joints the
contractor shall take into account the manufacturer’s recommendations as to the methods and
equipment to be used in assembling the joints. In particular the contractor shall ensure that the
spigotendofthepipetobejointedissmoothandhasbeenproperlychamferedthattherubberring as per IS
5382 is correctly positioned in the socket and that the two pipes are accurately in line,beforethe
joint ismade.Therubber ringsand any recommendedlubricant shallbe obtained only through the pipe
supplier or as directed by the Engineer.
LEADCALCULATINGJOINTS
The jointing shall be done with molten lead and spun yam. Pin lead shall be of uniform
quality clean and free from foreign materials. It shall be of uniform softness capable of being easily
caulked or driven. It shall conform to IS: 782 Spun yarn shall be of clean hemp and of good
quality. It shall conform to IS: 6587 Its quantity shall be as follows.
QuantitiesofspunYarnforDifferentSizesofPipes
(Materialsforsinglecollarjoints)
NominalInternal SpunYarnMass
Note: Under special circumstances the Engineer-in-charge may decide the quantities of spun yarn
depending upon the site conditions. The quantity of different diameters of C.L. pipes and fittings
shall be as follows:
QUANTITIESOFLEADYARNFORDIFFERENTSIZESOFPIPES
NormalSize Lead/Joint Depthof
Note: The quantities of lead given are provisional and a variation of 20 percent is
permissible either way.
Lead shall be heated in a melting pot kept in easy reach of the joint to be poured so that the
molten metal will not be chilled inbeing carried from the melting potto the joint and shallbe
brought to a proper temperature so that when stirred it will show a rapid change of color. Before
pouring all scum shall be removed. Each joint shall be made with
one continuous pour filling of the entire joint space with solid lead. Spongy or imperfectly
filled joints shall be bunt out and repaired.
The joint runner shall fit snugly against the face of the socket and the outside of the pipe
shall be dammed with clay to from a pouring lip to provide for filling the joint flush with the face
and to the top of the socket.
The jointed is done by first caulking in spun yam, then filling the remainder of the
joint space by running in molten lead, taking care that no dross enters the joint and then
thoroughly caulking the lead. The spun yam shall be used to center the spigot in the socket
and to prevent the flow of molten lead into the bore of the pipe.
Afterthe lead hasbeen run into the joint the lead shall be thoroughly caulked.
Caulking of joints shall be done after a convenient length of the pipes has been laid and
leaded. The leading ring shallfirst be removed and any lead outsidethe socket shallbe
removed with aflat chiseland then joint caulked removed with a flat chisel and then the joint
caulked around three times with caulking tools of increasing thickness and hammer of 2 kg.
Weight Lead run joints shall be preferably finished 3 mm behind the socket face. The joints
shall not be covered till the pipe line has been tested under specified hydrostatic test
pressure, though the rest of the pipe line should be covered up to prevent expansion and
contraction due to variation in temperature.
Fillingavailableexcavatedearth(excludingrock)intrenchesplinthsidesoffoundationetc.
in layers not exceeding 20 cams.In depth consolidating each deposited layer by ramming
The refillingwill generallyreferto refillingofpipelinetrenches,foundation trenchesupto
plinth level or ground level with excavated stuff selected soil brought from outside.
ClearingorTrenchesorGround:
The excavated trenches for foundation or ground over which filling is to be done
shall be cleared off all grass loose stones rubbish of all kinds brick bats as well as tress roots
Theyshallbewellwateredbeforestuffislaid.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER
STANDARD P.W.D. TECHNICAL SPECIFICATION FOR THE ITEMS AND ALSO I HAVE
THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS
AVAILABLE, SPECIFICATION GIVEN BY THE ENGINEER-IN-CHARGE SHALL BE
FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
SealandSignatureoftheBidder Add.CityEngineer(WestZone)
AmdavadMunicipalCorporation
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl – œrûtK vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg<
mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u)
yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh
ltuxem lkch, xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu. ftuLx[tfxhtuyu
xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e
s MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS<
hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS<
hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g
jFJtltu hnuNu. ftuLx[t¾xhu vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu
ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm
fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx,
vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm
duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle
mne mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. dwsht< mhfth ©b,ftuiNÕg ylu htusdth rJCtd îtht XhtJ ¢btf:LED/WRT/e-file/11/2024/0293/M2
mraJtjg ,dtk^eldh <t.15.02.24 lt XhtJ v{btKu yusLme/¢tuLx[fxhtulu îtht ©bgtude ftgœtle studJtR vhevqKo &tg <u
mwrlµ< fhJtlwk hnNu.
16. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK fgto
ctœ 24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu stuFbu
ftbdehe fhtJJtbtk ytJNu.
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su <u
ftb NY fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg<
mbgbgtoœtbtk vwKo fhJtbtk lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth
vulÕxe fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt Bgw.frb¹lh©elu
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and
Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is
employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child
labour welfare fund. If the employer refuses to deposit then action will be taken for contempt of Supreme Court Judgement and
also will be prosecuted by concerned authority. Because of the breach of any provision of child labour prohibition and
regulation Act 1986 by the Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal
Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date
06--02-97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining
amount is refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same
shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These
shall form a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be
necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract
documents. The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly
filled in by the contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published
by A.M.C through its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same
with the tender documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be
entertained under any circumstances.
Clause : 5 Schedule Of Maintanance
Contractor Should have to manage following condition for maintanance of water pipe line work as per
Engineer instruction
Sr.no. Mode Of Complaint Required machinory / Labour Remarks
Either Whatsup or Email Required as per site Condition or
3 Engineer Instruction
Complaint Received by higher
Authority / Councilor/ by Public
If Contractor Not Follow Schedule Of Maintanance
1. Whenever a work is allotted by Engineering staff, whether minor or major of part thereof of any amount, the
contractor shall be bound to start the works within 48 hours of intimation of work. Communication done
telephonically via SMS ,ViaWhatsapp and through letter /E-mail shall be considered legal and binding for
2. Failure of comply to start the works in 48 hours of intimation as above by contractor the contractor shall be
levied penalty of (1) Rs.1000/-per day (for tenders amounting upto 10 Lakhs), (2) Rs.2500 per day (for
tenders amounting above 10 Lakhs and upto 30Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30Lakhs).
Three times failures by contractor shall make contractor responsible to be blacklisted unless and otherwise
justified properly in writing/binding within 15days of last notice of penalty.
3. The Contractor shall adhere to the maintenance schedule outlined in the tender documents and
comply with the prevailing AMC circulars issued from time to time.
Contractor's Sign Addl.C.E.(westzone)
Mobile No:- Mobile No.:-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 50.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .