All Schedules Cost of New transformer oil Disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, unwinding of HV and LV coils at repairing center in front of authorized representative of APEPDCL for inspection for 1.5 or 1.6 MVA rating.The rate shall include transportation of failed PTR from its location to their works and back after repairs to the place specified by APEPDCL. Disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, unwinding of HV and LV coils at repairing center in front of authorized representative of APEPDCL for inspection for 10 MVA rating. The rate shall include transportation of failed PTR from its location to their works and back after repairs to the place specified by APEPDCL. Disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, unwinding of HV and LV coils at repairing center in front of authorized representative of APEPDCL for inspection for 3 or 3.15 MVA rating.The rate shall include transportation of failed PTR from its location to their works and back after repairs to the place specified by APEPDCL Disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, unwinding of HV and LV coils at repairing center in front of authorized representative of APEPDCL for inspection for 5 MVA rating.The rate shall include transportation of failed PTR from its location to their works and back after repairs to the place specified by APEPDCL. Disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, unwinding of HV and LV coils at repairing center in front of authorized representative of APEPDCL for inspection for 7.5 or 8 MVA rating.The rate shall include transportation of failed PTR from its location to their works and back after repairs to the place specified by APEPDCL. Filtration of new oil and filling Filtration of old oil and filling Overhauling of OLTC complete as specified in clause 3.13 in spec for 1.5 or 1.6 MVA Overhauling of OLTC complete as specified in clause 3.13 in spec for 10 MVA Overhauling of OLTC complete as specified in clause 3.13 in spec for 3.0 or 3.15 MVA Overhauling of OLTC complete as specified in clause 3.13 in spec for 5.0 MVA Overhauling of OLTC complete as specified in clause 3.13 in spec for 7.5 or 8.0 MVA Overhauling of PTR consisting of disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, Drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding, connecting the insulators and other accessories, Painting outside with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification. The rate shall include transportation of PTR from its location to their works and back after overhauling to the place specified by APEPDCL for 1.5 or 1.6 MVA Overhauling of PTR consisting of disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, Drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding, connecting the insulators and other accessories, Painting outside with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification. The rate shall include transportation of PTR from its location to their works and back after overhauling to the place specified by APEPDCL for 10 MVA Overhauling of PTR consisting of disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, Drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding, connecting the insulators and other accessories, Painting outside with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification. The rate shall include transportation of PTR from its location to their works and back after overhauling to the place specified by APEPDCL for 3 or 3.15 MVA Overhauling of PTR consisting of disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, Drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding, connecting the insulators and other accessories, Painting outside with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification. The rate shall include transportation of PTR from its location to their works and back after overhauling to the place specified by APEPDCL for 5 MVA Overhauling of PTR consisting of disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, Drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding, connecting the insulators and other accessories, Painting outside with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification. The rate shall include transportation of PTR from its location to their works and back after overhauling to the place specified by APEPDCL for 7.5 or 8 MVA Providing of new insulated copper winding in place of Damaged winding for HV Providing of new insulated copper winding in place of Damaged winding for LV Providing re-insulation to other coils in the sick transformer unit for HV Providing re-insulation to other coils in the sick transformer unit for LV Providing the Pressure release valve with 2No Limit switch for Main tank Providing the Pressure release valve with 2No Limit switch for OLTC Tank Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 1.5 or 1.6 MVA for 2 Limbs Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 10 MVA for 1 Limb Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 10 MVA for 2 Limbs Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 5 MVA for 1 Limb Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 5 MVA for 2 Limbs Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 7.5 or 8 MVA for 2 Limbs Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 7.5 or 8 MVA for 1 Limb Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 1.5 or 1.6 MVA for 3 Limbs Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 10 MVA for 3 Limbs Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 3 or 3.15 MVA for 3 Limbs Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 7.5 or 8 MVA for 3 Limbs Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 1.5 or 1.6 MVA for 1 Limb Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 3 or 3.15 MVA for 1 Limb Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 3 or 3.15 MVA for 2 Limbs Reassembling the core and winding, drying out the moisture from core and windings in vacuum chamber till steady IR values are attained as per the clause 3.14.6 of specification and replacing all synthetic rubber bonded cork gaskets with RC70C, Teflon washers, rubberized oil seals, making any modifications on the tank for housing the bushings, C.T terminals for winding temperature and rectification of main tank and radiator repairs and leaks, including rectification or replacement of threading of bolts and nuts and any other modification found necessary by APEPDCL, tanking the core and winding connecting the insulators and other accessories, Painting outside tank with primer and two coats of synthetic enamel paint as specified in clause 3.8 and conducting all tests as per IS 2026 and functional tests as specified in clause 3.14 of specification for 5 MVA for 3 Limbs Supply and fixing of Brass Valves Flange type 100 mm Supply and fixing of Brass Valves Flange type 20mm Supply and fixing of Brass Valves Flange type 25 mm Supply and fixing of Brass Valves Flange type 50mm Supply and fixing of MS Rings Supply and fixing of new Top or Bottom Parmali wooden ring Supply and fixing of radiator Butterfly valves of 80 mm flange dia Supply and fixing of vermin proof marshalling box of 14 Gauge with provision for housing the temperature meters, and wiring to Bucholtz relays and associated protection circuitry with armored 2.5 sq.mm four core or two core flexible copper cable and providing M5 stud type terminal blocks and lamp with fuse protection The wiring shall be ferruled and a legend shall be provided with total wiring details Supply and providing of new CRGO lamination of M4 by MOH grade in place of damaged lamination Supply and replacement of 12KV LV Bushing, 630 A with detachable stem 3 by 4 inches including metal parts Supply and replacement of 36KV HV Bushing, 600 A with detachable stem 3 by 4 inches including metal parts Supply and replacement of Al Metallic Body Silica gel breather 0.25 KG Supply and replacement of Al Metallic Body Silica gel breather 1.5 KG Supply and replacement of Bucholtz. Relay Double float Supply and replacement of Bucholtz. Relay Single float Supply and replacement of Mercury type Oil temperature meter with 3 mtrs Capillary with Alarm and trip mercury contacts Supply and replacement of Mercury type winding temperature meter with 3 mtrs Capillary with Alarm and trip mercury contacts including the cost of CT Supply and replacement of MOG Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Bakelite Phase Board 17 Tap Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Bakelite Phase Board 9 Tap Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Bearing plate assembly Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Copper Braided wire for moving contact Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Copper collector ring Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Copper connecting tubes Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Digital TPI assembly Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Drive motor assembly Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Energy accumulator assembly Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Epoxy Barrier Board 17 tap Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Epoxy Barrier Board 9 tap Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Epoxy moving arm Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Epoxy Phase Board Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Fixed contact Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Main moving Contact Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Oil seal for main shaft Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Override clutch assembly Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Sliding Dog carrier Supply and replacement of spares of OLTC for OLG or Easun or IMP or CTR or Crompton Transition Resistor with copper tube
# Schedule Awarded To Bids Value 1 Cost of New transformer oil STARTEK ELECTRICALS PVT LTD 3 ₹95 2 Disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, unwinding of HV and LV coils at repairing center in front of authorized representative of APEPDCL for inspection for 1.5 or 1.6 MVA rating.The rate shall include transportation of failed PTR from its location to their works and back after repairs to the place specified by APEPDCL. STARTEK ELECTRICALS PVT LTD 3 ₹22,990 3 Disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, unwinding of HV and LV coils at repairing center in front of authorized representative of APEPDCL for inspection for 10 MVA rating. The rate shall include transportation of failed PTR from its location to their works and back after repairs to the place specified by APEPDCL. STARTEK ELECTRICALS PVT LTD 3 ₹90,490 4 Disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, unwinding of HV and LV coils at repairing center in front of authorized representative of APEPDCL for inspection for 3 or 3.15 MVA rating.The rate shall include transportation of failed PTR from its location to their works and back after repairs to the place specified by APEPDCL STARTEK ELECTRICALS PVT LTD 3 ₹37,390 5 Disconnecting the windings from bushings and opening of top cover, lifting the core and winding from the tank, unwinding of HV and LV coils at repairing center in front of authorized representative of APEPDCL for inspection for 5 MVA rating.The rate shall include transportation of failed PTR from its location to their works and back after repairs to the place specified by APEPDCL. STARTEK ELECTRICALS PVT LTD 3 ₹61,110
Show All 76 Schedules