| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹2.3 L+₹9,834.86 (4.40%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹2.4 L+₹12,289.45 (5.50%)Rejected-AOC | L3 | Rejected-AOC Rejected |
Tender Value
₹2.5 L
EMD Value
₹6,144
Closing Date
14 Aug 2025, 11:00 amClosed
Assistant Executive Engineer
Assistant Executive Engineer Buildings Subdivision Irinjalakuda
laying old interlocking paver blocks stacked in the compound of the indoor stadium and reconstruction of the damaged compound wall of staff quarters
2025_PWD_782330_1
PWD/BLDG/TR/7514/2024_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
chalakudy
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
₹6,144
15 Oct 2025
4 Aug 2025
16 Aug 2025
4 Aug 2025
14 Aug 2025
4 Aug 2025
Amount
MAINTENANCE
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
OD113468/2025-2026:Random Rubble masonry with using Departmental rubble in Foundation and plinth including packing to compactness to lines and levels,cost of labour charges etc.
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
OD33461/2024-2025:Carriage of interlock paver blocks
OD24907/2024-2025: Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of 6mm broken stone, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.)(Based on spec.16.84)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
JOHN BOSCO S (BID ID -2287414)
AJEX M A (BID ID -2284746)
Bidder Name
JOHN BOSCO S
TENNY T J
AJEX M A
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1283529.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .