Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.4 LAdmitted-Finance | -42.05% | ₹7.4 L | L1 | Admitted-Finance |
| 2 | L2₹7.7 LAdmitted-Finance R O VILLAGE KADWA TEHSIL BASANTGARH | -40.00% | ₹7.7 L | L2 | Admitted-Finance |
| 3 | L3₹7.9 LAdmitted-Finance | -38.50% | ₹7.9 L | L3 | Admitted-Finance |
| 4 | L4₹8.3 LAdmitted-Finance | -35.21% | ₹8.3 L | L4 | Admitted-Finance |
| 5 | L5₹8.3 LAdmitted-Finance | -35.17% | ₹8.3 L | L5 | Admitted-Finance |
Tender Value
₹12.8 L
EMD Value
₹25,600
Closing Date
4 May 2026, 5:00 pmClosed
Executive Engineer PMGSY Div Budhal
Office of the Executive Engineer PMGSY Div Budhal
Permanent Restoration of road from Hasplote to Rajdhani Pkg No. JK12-205 ,Length-08.00Kms
2026_JKRRD_147398_10
EE/PMGSY/B /06 Date.28.04-2026
Open Tender
CIVIL
Budhal
Permanent Restoration of road from Hasplote to Rajdhani Pkg No. JK12-205 ,Length-08.00Kms
2 documents required · 2 mandatory
₹600
Yes
Office of the Executive Engineer PMGSY Div Budhal
₹25,600
Yes
Office of the Executive Engineer PMGSY Div Budhal
8 May 2026
28 Apr 2026
5 May 2026
28 Apr 2026
4 May 2026
28 Apr 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavating for structure as per drawings and technical specifications clause 301.2 including setting out construction of shoring and bracing, removing of slupms and other delirious material and disposal upto lead of 50 mtr, dressing of sides and bottom and back filling in trenches with excavate suitable material including de-watering if any upto 3 mtr depth in all kinds of soil | 104.95 | Cum | 256.85 | ₹26,956.41 | item 03 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 10.02 | Cum | 5,202.9 | ₹52,133.06 | item 04 |
| 3 | Polygonal/Random Rubble masonry uncoursed brought to course in 1:6 fine sand mortar in foundation and plinth width cement mortar 1:6 | 133.9 | Cum | 5,402.6 | ₹7,23,408.14 | item 04 |
| 4 | Polygonal/Random Rubble masonary laid dry uncoursed brought to course in foundation and plinth with bound stone | 73.85 | Cum | 3,262.1 | ₹2,40,906.08 | item 04 |
| 5 | Providing and laying coping/flooring 50 mm thick with cement concrete in 1:2:4 mix with 20 mm nominal size and curing complete | 49.8 | Sqm | 416.5 | ₹20,741.7 | item 05 |
| 6 | Back filling behind R/wall abutment wing wall Return wall with available stone form earthwork complete as per drawing and technical specification clause 1204.38 labour rate | 57.82 | Cum | 578.15 | ₹33,428.63 | item 08 |
| 7 | Centering and shuttering including strutting,propping etc and removal of form work in foundation, footings etc mass concrete | 20.4 | Sqm | 286.35 | ₹5,841.54 | - |
| 8.1 | Sand for an average distance of 140 km by MT | 56.73 | Cum | 1,734.74 | ₹98,411.8 | item 18 |
| 8.2 | Aggregate 40 mm normal size for an average distance of 17 km by MT | 8.91 | Cum | 402.95 | ₹3,590.28 | - |
| 8.3 | Aggregate 20 mm normal size for an average distance of 17 km by MT | 2.24 | Cum | 370.67 | ₹830.3 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_229911.xls
BOQ • 1.03 MB
Download all tender documents and submit your bid