Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.7 LAdmitted-Finance UTTAR PRADESH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | -0.11% | ₹19.7 L | L1 | Admitted-Finance |
| 2 | L2₹19.7 L+₹1,770.50 (0.09%)Admitted-Finance | -0.02% | ₹19.7 L+₹1,770.50 (0.09%) | L2 | Admitted-Finance |
Tender Value
₹19.7 L
EMD Value
₹40,000
Closing Date
21 Apr 2026, 12:00 pmClosed
EE RED DIV Ballia
EE RED DIV Ballia
Lot84 vidhansabha phephna ke viaksh kand hanumanganj ke gram sabha gurwa me mrityunajay singh ke ghar se shiv kumar ram shiv bachan verma ke ghar hote hue kedar verma ke ghar tak Cc road evam nali dhakkan sahit nirman kary
2026_REDUP_1131791_1
2630/EE/RED/2025-26/23-03-2026
Open Tender
Civil Works
Fixed-rate
90 days
ballia
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹40,000
Yes
29 Apr 2026
13 Apr 2026
22 Apr 2026
13 Apr 2026
21 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Excavation in foundation in ordinary soil including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches MORD SPEC NO 300 | - | Cum | 157.61 | - |
| 3 | Providing concrete for plain/Reinforced concrete in open foundation complete as per drawing and technical specification clauses 802,803,1202 &1203 Chap 11(11.4-800 &1200 iii) PCC M-10 | - | Cum | 5,364.97 | - |
| 4 | Brick masonary work in1:4 cement mortar in sub structure complete execluding pointing and plastering as per drawing and technical specification clause 600,1202 & 1203 | - | Cum | 6,768.75 | - |
| 5 | Plastering with cement mortar(1:4) 15mm thick on substructure as per technical specification clause 613.4 & 1204 | - | sqm. | 226.1 | - |
| 6 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 | - | Cum | 8,469.25 | - |
| 7 | Supplying, fitting, and placing MS bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202, for Bars below 36 mm dia including over laps and wastage, where they are not welded.(M-125) | - | Qtl. | 6,277.13 | - |
| 8 | WBM Grading - 3 Providing, laying, spreading and compacting stone aggregate of specific size 22-4-53mm to water bound macadum specification including spreading in uniform thickness hand packing Rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill up the interstices of coarse aggregate watering and compating to the required density Grading 3 as per Technical Specification Clause 405 of MORD data book.Compacted thickness 7.50 cm. | - | cum | 4,402.78 | - |
| 9 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2m 30(Grade) coarse and fine aggregates conforming to IS 383, maximum size of coarse aggregates not exceeding 25mm. mixed in a concrete mixer of not less than 0.2 cum. capacity and appropriate weigh batcher using approved mix design, and in approved fixed side formwork ( steel channel, laying and fixing of 125 micron thick polythin film wedges, steel plates including levelling the formwork as poer drawing) spreading the concrete with shovels, rakes, compacted using needle screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant dowel bars, near approaches to bridge/ culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days, curing compount( where specified) and watger finishing to lines and grade as per drawing and Technical specification clause 1501 | - | cum | 8,839.75 | - |
| 10 | S/F of sign board and photography. | - | Job | 4,750 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_2112016.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .