Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC Lowest bidder |
| Sl No | Description | Qty | Unit | Prakash Electricals L1 |
|---|---|---|---|---|
| 1.00Overhauling | ||||
| 1.00 | OD297213/2024-2025:Dismantling the11-30 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. | 2 | each | 4,149 ₹8,298 |
| 1.00 | OD297212/2024-2025:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. | 1 | each | 5,864 ₹5,864 |
| 1.00 | OD297211/2024-2025:Dismantling the 61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint. | 2 | each | 6,447 ₹12,894 |
| 1.00 | OD59077/2025-2026:Vacuum Motor pump set up to 5 HP Squirrel cage induction motor with Vacuum pump set, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including lathe works and maintain the motor pump set, base plate, coupling with pump, giving connections to the in position, checking correct alignment, testing and trial run on full load | 1 | job | 3,221 ₹3,221 |
| 2.00Lowering | ||||
| 2.00 | OD297197/2024-2025:" Lowering down and erecting 6-10 HP motor and erecting the motor on the base plate coupling with pump in position giving connections checking correct alignment and trial run on full load
" | 3 | each | 944 ₹2,832 |
| 2.00 | OD297196/2024-2025:"Lowering down and erecting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
" | 4 | each | 4,000 ₹16,000 |
| 2.00 | OD297199/2024-2025: Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 4 | each | 7,085 ₹28,340 |
| 2.00 | OD297200/2024-2025:" Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
" | 1 | each | 5,001 ₹5,001 |
Updated dates
Tender Value
₹4.2 L
EMD Value
₹10,584
Closing Date
1 Jan 2026, 3:00 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer Electrical Irrigation Sub Division Aluva
GENERAL-AMC- 2025-2026- Parakkadavu Area.-Fully Comprehensive Annual Maintenance of Parakadavu No.1,Parakadavu No2, Daivathanpady, Erayankudy, poovathussery, LI Schemes under Electrical LI section Aluva-General Electrical Work
2025_Irrig_811584_22
PWD/BLDG/10706/ALY/2025-2026
Open Tender
Electrical Works
365 days
Aluva
Please refer Tender documents.
11 documents required · 11 mandatory
₹935
₹10,584
10 Mar 2026
18 Dec 2025
3 Jan 2026
18 Dec 2025
1 Jan 2026
18 Dec 2025
Amount
Overhauling
OD297213/2024-2025:Dismantling the11-30 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD297212/2024-2025:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD297211/2024-2025:Dismantling the 61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD59077/2025-2026:Vacuum Motor pump set up to 5 HP Squirrel cage induction motor with Vacuum pump set, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including lathe works and maintain the motor pump set, base plate, coupling with pump, giving connections to the in position, checking correct alignment, testing and trial run on full load
Lowering
OD297197/2024-2025:" Lowering down and erecting 6-10 HP motor and erecting the motor on the base plate coupling with pump in position giving connections checking correct alignment and trial run on full load "
OD297196/2024-2025:"Lowering down and erecting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load "
OD297199/2024-2025: Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD297200/2024-2025:" Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load "
Consumables and supplies
OD54772/2025-2026:Supply and fixing three phase digital Ammeter accuracy class class 1in exciting panel board
OD54771/2025-2026:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD54770/2025-2026:Supply and fitting Digital multifunction meter to read VA,PF,KW,KWh, accuracy class-1 LCD
OD297216/2024-2025: Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG or equivalent , suitable for motor / pump set as per the direction of departmental staff at site - Bearing No 6309 or its equivalent size
OD297221/2024-2025:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG or equivalent , suitable for motor / pump set as per the direction of departmental staff at site - Bearing No6311 or its equivalent size
OD297214/2024-2025:Supply and providing of LED Indication lamps in panel board-blue colour
OD297215/2024-2025:Supply and providing LED indicators for all voltage ranges - Red, Green, Black, Yellow or Orange Colour
OD297228/2024-2025: Carrying out control wiring for panel with normal meters and indication lamps for interconnecting the control devices/ equipments including providing suitable size insulated sockets at the termination points or soldered properly, providing numbering ferrules for the proper identification of the wiring, keeping the wiring firm by suitable tie/ tie mounts/ PVC duct etc as required.-1.50 sq mm single run with required sockets.
OD60256/2025-2026: Supply, Leading to pump house, installation on suitable metal frame work as required at site, testing and commissioning of 440 Volts, 3 Phase oil immersed , 75 HP Stator rotor starter(Floor Mounting), with separate OCB including giving connection and taking trial run on full load as directed by the departmental officer at site (Excluding oil), including standard protections as per standard.
OD297218/2024-2025:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD297229/2024-2025:supply and providing ABRO PUF -750 Multipurpose Expandable PU Foam insulation Sealant Spray.
OD132383/2025-2026:Supply and providing Taparia make Combination Plier (210mm)-1no ,insulated screwdriver (250mm)-1no,Line tester(200mm)-1no,Double Ended Spanner Set DEP12 (12 Pcs),6x7, 8x9, 10x11, 12x13, 14x15, 16x17, 18x19, 20x22, 21x23, 24x27, 25x28, 30x32 mm, electrical SafetyRubber hand Gloves-1pair
OD133253/2025-2026:Charges to be paid at electrical kseb actual amount may be reimbursed on production of original documents
OD133254/2025-2026:Copying charges of Electrical Drawing per A3 first sheet
OD140592/2025-2026:Copying Charges of electrical drawing per A3 Sheet additional Copies
Pipe works
OD58602/2025-2026:Dismantling the existing MS delivery pipe of size 200mm to 350 mm piece by piece after providing scaffolding supports, with out further damages including MS bent , accessories etc. and stacking at the yard
OD58604/2025-2026:Supply, conveying, erecting, testing and commissioning the 250 mm dia MS pipe in suction/ delivery side having sheet of minimum thickness 6.35 mm and cutting in to required length, facing the cutting edges, painting two coats of synthetic best quality enamel paint over a coats red oxide primer, including conveyance charges to pump house and labour charges for loading, unloading,etc.
OD60152/2025-2026:Supply and providing the rough cut flange ring joint 12 mm thick for 200/250 mm MS pipe after facing the cutting edges of flange rings neatly and set out the flange rings in correct position to both vertical and horizontal planes and welding in two rows accurately, painting two coats of synthetic best quality enamel paint over a coats red oxide primer including fixing the pipe using suitable size nuts and bolts , rubber packing grease etc , in correct alignment and leakproof condition.
14.10:Providing and laying in position reinforced cement concrete 1 :2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) in foundation of pump, DG set etc. including form work etc. as required (excluding reinforcement).
14.12:Providing 15mm thick cement plaster of mix 1:4(1 cement: 4 fine sand) at all levels
OD59199/2025-2026:Charges for 25/30 hp Pump repairing, cleaning inside attending impellor / shaft lath work ,renovation of packing ,Nut bolt etc resetting and taking trail run as per dptl. officials direction.
AMC of motor pump sets
OD297204/2024-2025:Fully Comprehensive Annual Maintenance of upto 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed
OD297201/2024-2025: Fully Comprehensive Annual Maintenance of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD297203/2024-2025: Fully Comprehensive Annual Maintenance of 31-60 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD297205/2024-2025: Fully Comprehensive Annual Maintenance of 61-110 HP squirrel cage induction motor with split case / End suction pump set , controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs , overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, base plate, pumpset and maintain the motor pump sets electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD59076/2025-2026:Fully Comprehensive Annual Maintenance of 61-110 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Lifting
OD190100/2025-2026: Lifting the upto 1-3 HP motor after disconnecting the wire connection, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
OD297207/2024-2025: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
OD297210/2024-2025: Lifting the 11-30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
OD297209/2024-2025: Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
OD297206/2024-2025:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
Bidder Name
Prakash Electricals
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1378454.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.36 MB
NIT.pdf
Tender Documents • 0.02 MB
SBD.pdf
Tender Documents • 1.63 MB
MAKE.pdf
Tender Documents • 0.20 MB
BOQ_1378454.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid