Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.1 CrAdmitted-Finance | ₹31.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹33.9 CrAdmitted-Finance | ₹33.9 Cr | L2 | Admitted-Finance |
| 3 | L3₹34.1 CrAdmitted-Finance 301 306 PANORAMA COMPLEX R C DUTT ROAD VADODARA VADODARA GUJARAT 390007 | VADODARA | GUJARAT | 390007 | ₹34.1 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical 4TH FLOOR S S COMPLEX S J ROAD ATHGAON GUWAHATI ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | - | - | Rejected-Technical Non responsive |
| Sl No | Description | Qty | Unit | Apar Industries Limited L3 | JSK Industries Private Limited L1 | Sterlite Electric Limited L2 |
|---|---|---|---|---|---|---|
| 1.00 | Supply of HTLS Conductor as per specification requirements Total Line length= 17.73 (10% extra for sag and Jumpers for both line & sub-station) = 17.73 +(17.73 X .1) = 19.503KM. Total Conductor required = 19.503 X 3 = 58.509KM Say 60KM | 60 | KM | 17,32,051.1 ₹10.4 Cr | 15,44,619.79 ₹9.3 Cr | 15,83,478.15 ₹9.5 Cr |
| 2.00 | Single Suspension Hard ware fittings
(Quantity included mandatory spares: 3 Nos) | 117 | Set | 12,936 ₹15.1 L | 12,243 ₹14.3 L | 12,551 ₹14.7 L |
| 3.00 | Single Tension Hard ware fittings
(Quantity included mandatory spares: 4 Nos) | 148 | Set | 46,200 ₹68.4 L | 43,725 ₹64.7 L | 44,825 ₹66.3 L |
| 4.00 | Mid Span Joints
(Quantity included mandatory spares: 1 No) | 61 | Nos | 61,656 ₹37.6 L | 58,353 ₹35.6 L | 59,821 ₹36.5 L |
| 5.00 | Repair Sleeves
(Quantity included mandatory spares: 1 No) | 16 | Nos | 1,680 ₹26,880 | 1,590 ₹25,440 | 1,630 ₹26,080 |
| 6.00 | Vibration Dampers
(Quantity included mandatory spares: 6 Nos) | 206 | Nos | 2,856 ₹5.9 L | 2,703 ₹5.6 L | 2,771 ₹5.7 L |
| 7.00 | Double Tension hardware fittings
(Quantity included mandatory spares: 1 No) | 13 | Set | 53,760 ₹7.0 L | 50,880 ₹6.6 L | 52,160 ₹6.8 L |
| 8.00 | 90KN Disc insulator | 240 | Nos | 2,856 ₹6.9 L | 2,703 ₹6.5 L | 18,056 ₹43.3 L |
| 9.00 | 70KN Disc insulator | 290 | Nos | 2,016 ₹5.8 L | 1,908 ₹5.5 L | 15,771 ₹45.7 L |
| 10.00 | Double Suspension Hard ware fittings
(Quantity included mandatory spares: 1 No) | 7 | Set | 18,312 ₹1.3 L | 17,331 ₹1.2 L | 17,767 ₹1.2 L |
Updated dates
Tender Value
₹22.3 Cr
EMD Value
₹44.7 L
Closing Date
31 Mar 2026, 11:00 amClosed
CGM OnM CAR AEGCL
Bijulee Bhawan PALTANBAZAR, Ghy 781001
De-stringing of existing Panther Conductor and Stringing and Supply of HTLS Conductor of Sonabil-Depota, Sonabil-Ghoramari and Ghoramari- Depota Transmission line
2026_AEGCL_51350_1
AEGCL/HTLS/Sonabil-Depota
Open Tender
Electrical Works
Depota, Tezpur
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
₹44.7 L
29 May 2026
20 Feb 2026
2 Apr 2026
20 Feb 2026
31 Mar 2026
5 Mar 2026
20 Feb 2026 - 5 Mar 2026
Supply of HTLS Conductor as per specification requirements Total Line length= 17.73 (10% extra for sag and Jumpers for both line & sub-station) = 17.73 +(17.73 X .1) = 19.503KM. Total Conductor required = 19.503 X 3 = 58.509KM Say 60KM
Single Suspension Hard ware fittings (Quantity included mandatory spares: 3 Nos)
Single Tension Hard ware fittings (Quantity included mandatory spares: 4 Nos)
Mid Span Joints (Quantity included mandatory spares: 1 No)
Repair Sleeves (Quantity included mandatory spares: 1 No)
Vibration Dampers (Quantity included mandatory spares: 6 Nos)
Double Tension hardware fittings (Quantity included mandatory spares: 1 No)
90KN Disc insulator
70KN Disc insulator
Double Suspension Hard ware fittings (Quantity included mandatory spares: 1 No)
Dead end assembly (Quantity included mandatory spares: 4 Nos)
Jumper Socket (Quantity included mandatory spares: 4 Nos)
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE Il (F&I of Equipment Sonabil-Depota) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Supply of HTLS Conductor as per specification requirements Total Line length= 17.73 (10% extra for sag and Jumpers for both line & sub-station) = 17.73 +(17.73 X .1) = 19.503KM. Total Conductor required = 19.503 X 3 = 58.509KM Say 60KM
Single Suspension Hard ware fittings (Quantity included mandatory spares: 3 Nos)
Single Tension Hard ware fittings (Quantity included mandatory spares: 4 Nos)
Mid Span Joints (Quantity included mandatory spares: 1 No)
Repair Sleeves (Quantity included mandatory spares: 1 No)
Vibration Dampers (Quantity included mandatory spares: 6 Nos)
Double Tension hardware fittings (Quantity included mandatory spares: 1 No)
90KN Disc insulator
70KN Disc insulator
Double Suspension Hard ware fittings (Quantity included mandatory spares: 1 No)
Dead end assembly (Quantity included mandatory spares: 4 Nos)
Jumper Socket (Quantity included mandatory spares: 4 Nos)
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE III (Erection Sonabil-Depota) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Preliminary survey including measurement of vertical clearance at maximum sag point, identification and replacement or repairirng of damaged stubs, tower members and earthing and collection of all required documents required for obtaining statutory permission from railways, highway Authorities and other Government bodies as per requirement.
De-stringing of ACSR panther conductor of existing 132kV Sonabil-Depota line, re-rolling on empty drum, removing of hardware fittings, insulators and accessories, loading and unloading, transportation it to AEGCL store. Length Per Ckt = 17.73KM Total Ckt Km or total de-stringing required is = 17.73 Km X 3 Ph = 53.19 Km
Paving, stringing,tensioning, Clamping, jointing etc of HTLS conductor with non metallic core using tension pullar machine as per specification requirements in all the phases including hoisting of insulators, fittings of all necessary hardware & accessories i.e fittings, armour rods, vibration damper, supervision of installation and stringing etc. Length Per Ckt = 17.73KM Total Ckt Km or total stringing required is = 17.73 Km X 3 Ph = 53.19 Km
Dismantling of existing clamps, connectors and accessories from gantry to the Bus bar at the terminal Bay of respective Sub-Station and reconnection with HTLS compatible connectors, conductor and clamps both supply and erection complete. (1 job each at 132KV Sonabil GSS & 132KV Depota GSS)
ESMP Requirement Personal protective equipments(Hard hats with full or partial brims), safety glass with side shields. Face mask/shileds. Suitable footware ( Safety/steel toed boots/rated dielectric footware), insulating gloves (rated used along with leather/cloth lining for shock protection) as per site requirement.
ESMP Requirement Wire insulation/Bird deflector/Bird flapper as per requirement including installation.
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE IV (Supply of Equipment Sonabil-Ghoramari) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Supply of HTLS Conductor as per specification requirements Total Line length= 7.23 (10% extra for sag and Jumpers for both line & sub-station) = 7.23 +(7.23 X .1) = 7.953.KM. Total Conductor required = 7.953 X 3 = 23.859KM Say 24KM
Single Suspension Hard ware fittings (Quantity included mandatory spares: 2 Nos)
Single Tension Hard ware fittings (Quantity included mandatory spares: 4 Nos)
Mid Span Joints (Quantity included mandatory spares: 1 No)
Repair Sleeves (Quantity included mandatory spares: 1 No)
Vibration Dampers (Quantity included mandatory spares: 4 Nos)
Double Tension hardware fittings (Quantity included mandatory spares: 1 No)
90KN Disc insulator
70KN Disc insulator
Double Suspension Hard ware fittings (Quantity included mandatory spares: 1 No)
Dead end assembly (Quantity included mandatory spares: 4 Nos)
Jumper Socket (Quantity included mandatory spares: 4 Nos)
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE V (F&I of Equipment Sonabil-Ghoramari) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Supply of HTLS Conductor as per specification requirements Total Line length= 7.23 (10% extra for sag and Jumpers for both line & sub-station) = 7.23 +(7.23 X .1) = 7.953.KM. Total Conductor required = 7.953 X 3 = 23.859KM Say 24KM
Single Suspension Hard ware fittings (Quantity included mandatory spares: 2 Nos)
Single Tension Hard ware fittings (Quantity included mandatory spares: 4 Nos)
Mid Span Joints (Quantity included mandatory spares: 1 No)
Repair Sleeves (Quantity included mandatory spares: 1 No)
Vibration Dampers (Quantity included mandatory spares: 4 Nos)
Double Tension hardware fittings (Quantity included mandatory spares: 1 No)
90KN Disc insulator
70KN Disc insulator
Double Suspension Hard ware fittings (Quantity included mandatory spares: 1 No)
Dead end assembly (Quantity included mandatory spares: 4 Nos)
Jumper Socket (Quantity included mandatory spares: 4 Nos)
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE VI (Erection Sonabil-Ghoramari) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Preliminary survey including measurement of vertical clearance at maximum sag point, identification and replacement or repairirng of damaged stubs, tower members and earthing and collection of all required documents required for obtaining statutory permission from railways, highway Authorities and other Government bodies as per requirement.
De-stringing of ACSR panther conductor of existing 132kV Sonabil-Ghoramari line, re-rolling on empty drum, removing of hardware fittings, insulators and accessories, loading and unloading, transportation it to AEGCL store. Length Per Ckt= 7.23 KM Total Ckt Km or total de-stringing required is = 7.23 Km X 3 Ph = 21.69 Km
Paving, stringing,tensioning, Clamping, jointing etc of HTLS conductor with non metallic core using tension pullar machine as per specification requirements in all the phases including hoisting of insulators, fittings of all necessary hardware & accessories i.e fittings, armour rods, vibration damper, supervision of installation and stringing etc. Length Per Ckt= 7.23 KM Total Ckt Km or total stringing required is = 7.23 Km X 3 Ph = 21.69 Km
Dismantling of existing clamps, connectors and accessories from gantry to the Bus bar at the terminal Bay of respective Sub-Station and reconnection with HTLS compatible connectors, conductor and clamps both supply and erection complete. (1 job each at 132KV Sonabil GSS & 132KV Ghoramari GSS)
ESMP Requirement Personal protective equipments(Hard hats with full or partial brims), safety glass with side shields. Face mask/shileds. Suitable footware ( Safety/steel toed boots/rated dielectric footware), insulating gloves (rated used along with leather/cloth lining for shock protection) as per site requirement.
ESMP Requirement Wire insulation/Bird deflector/Bird flapper as per requirement including installation.
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE VII (Supply of Equipment Depota-Ghoramari) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Supply of HTLS Conductor as per specification requirements Total Line length=14.297 (10% extra for sag and Jumpers for both line & sub-station) = 14.297+(14.297 X .1) = 15.7267KM. Total Conductor required =15.7267 X 3 = 47.1801KM Say 47.18 KM
Single Suspension Hard ware fittings (Quantity included mandatory spares: 3 Nos)
Single Tension Hard ware fittings (Quantity included mandatory spares: 4 Nos)
Mid Span Joints (Quantity included mandatory spares: 1 No)
Repair Sleeves (Quantity included mandatory spares: 1 No)
Vibration Dampers (Quantity included mandatory spares: 5 Nos)
Double Tension hardware fittings (Quantity included mandatory spares: 1 No)
90KN Disc insulator
70KN Disc insulator
Double Suspension Hard ware fittings (Quantity included mandatory spares: 1 No)
Dead end assembly (Quantity included mandatory spares: 4 Nos)
Jumper Socket (Quantity included mandatory spares: 4 Nos)
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE VIII (F&I of Equipment Depota-Ghoramari) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Supply of HTLS Conductor as per specification requirements Total Line length=14.297 (10% extra for sag and Jumpers for both line & sub-station) = 14.297+(14.297 X .1) = 15.7267KM. Total Conductor required =15.7267 X 3 = 47.1801KM Say 47.18 KM
Single Suspension Hard ware fittings (Quantity included mandatory spares: 3 Nos)
Single Tension Hard ware fittings (Quantity included mandatory spares: 4 Nos)
Mid Span Joints (Quantity included mandatory spares: 1 No)
Repair Sleeves (Quantity included mandatory spares: 1 No)
Vibration Dampers (Quantity included mandatory spares: 5 Nos)
Double Tension hardware fittings (Quantity included mandatory spares: 1 No)
90KN Disc insulator
70KN Disc insulator
Double Suspension Hard ware fittings (Quantity included mandatory spares: 1 No)
Dead end assembly (Quantity included mandatory spares: 4 Nos)
Jumper Socket (Quantity included mandatory spares: 4 Nos)
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE IX (Erection Depota-Ghoramari) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Preliminary survey including measurement of vertical clearance at maximum sag point, identification and replacement or repairirng of damaged stubs, tower members and earthing and collection of all required documents required for obtaining statutory permission from railways, highway Authorities and other Government bodies as per requirement.
De-stringing of ACSR panther conductor of existing 132kV Depota-Ghoramari line, re-rolling on empty drum,removing of hardware fittings,insulators and accessories, loading and unloading, transportation it to AEGCL store. Length Per Ckt = 14.297KM. Total Ckt Km or total de-stringing required is = 14.297 Km X 3 Ph = 42.891 Km
Paving, stringing,tensioning, Clamping, jointing etc of HTLS conductor with non metallic core using tension pullar machine as per specification requirements in all the phases including hoisting of insulators, fittings of all necessary hardware & accessories i.e fittings, armour rods, vibration damper, supervision of installation and stringing etc.Length Per Ckt = 14.297KM. Total Ckt Km or total stringing required is = 14.297 Km X 3 Ph = 42.891 Km
Dismantling of existing clamps, connectors and accessories from gantry to the Bus bar at the terminal Bay of respective Sub-Station and reconnection with HTLS compatible connectors, conductor and clamps both supply and erection complete. (1 job each at 132KV Depota GSS & 132KV Ghoramari GSS)
ESMP Requirement Personal protective equipments(Hard hats with full or partial brims), safety glass with side shields. Face mask/shileds. Suitable footware ( Safety/steel toed boots/rated dielectric footware), insulating gloves (rated used along with leather/cloth lining for shock protection) as per site requirement.
ESMP Requirement Wire insulation/Bird deflector/Bird flapper as per requirement including installation.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_81553.xls
BOQ • 0.55 MB
AddlDocu.pdf
Additional Documents • 1.42 MB
BIDVOL1.pdf
Tender Documents • 1.86 MB
BIDVolume2.pdf
Tender Documents • 2.59 MB
NIT.pdf
Tender Documents • 0.37 MB
IFB.pdf
Tender Documents • 1.31 MB
Download all tender documents and submit your bid