Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
26 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.Minicipal Commissioner - West Zone
Providing & Supplying water tanker at different places in sabarmatiward,West zone, (Annual Rate Tender)
367587
3/26-27 (T.N. 48)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹10,000
25 Nov 2026
25 Nov 2026
25 Nov 2026
26 Nov 2026
25 Nov 2026
120 days
1. Name of Work :- places in sabarmatiward,West zone, (Annual Rate
2. Tender Estimated Cost :-
1% of the Tender Cost in theform(Rs.)
3. Earnest Money :-
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs : Demand Draftof Rs.900.00
6. Time-Limit : 12months
7. Validity Period : 120 Days
(i) Last Date of Submission of the :
: a) In Sealed cover in duplicate copies by
Registered Post A.D, or by Courier.or hand
(ii) Mode of Sending delivery
b) Tender sent by ordinary post will be rejected out
(iii) Description essential to be :
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in : The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
9. Date of Opening : Dt..27.11.2026 , 15:00 PM
: Submission of EMD. Tender fee and other
Documents during office hours: On date.27-11-
Place of Submission & Opening 2026, 12:00 pm West Zone, 2nd Floor, A.M.
of Tender Office, Stadium Sub Zonal Office, Nr. Panchshil
Water Tank, Naranpura Railway Crossing
(1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting
Penalty Due to Delay of work above 10 Lakhs and upto 30 Lakhs), (3) Rs.5000 per
day (for all tenders amounting
above 30 Lakhs) but not more then 10% of bill
SABARMATI WARD -1-
As per STANDARD DETAILED TECHNICAL
12. Defect Liability :
SPECIFICATION OF ITEMS
Whenever a work is allotted by Engineering staff,
whether minor or major of part thereof of any amount,
the contractor shall be bound to start the works within
48 hours of intimation of work. Communication done
telephonically via SMS, Via Whatsapp and through
letter / E-mail shall be considered legal and binding for
the same. Failure of comply to start the works in
Time permitted to start parts hours of intimation as above by contractor the
of work contractor shall be levied penalty of (1) Rs.1000/- per
day (for tenders amounting upto 10 Lakhs), (2) Rs.2500
per day (for tenders amounting above 10 Lakhs and
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs). Three times failures by
contractor shall make contractor responsible to be
black listed unless and otherwise justified properly in
writing / binding within 15 days of last notice of penalty.
14 GST ftuLx[t¾xhlu «J<obtlGST yjd&eåþfJJtbtkytJNu
Contractor's Sign Addl.C.E.
Mobil No:- (west zone)
SABARMATI WARD -2-
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Name of Work:- Providing & Supplying water tanker at different places in sabarmatiward,West
zone, (Annual Rate Tender)
I.No. Qty. Item Description Rate Per Amount
Supplying Potable Water Tanker to be filled
by supplier from his own source with
meter Delivert pipe. The tanker should be
supplied as & where reuired& when order
placed by charge,drivers charge
etc.complete. Including pressure pump.
Total Rs. 10,00,000=00
(in words also)
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
SABARMATI WARD -3-
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
ુ ામProviding & Supplying water tanker at different places in sabarmatiward,West zone, (Annual
તા.૦૭.૧૦.૨૦૨૩નાસરક લ ગેનાLiquidated Damage For Delay
Category Problem SLA Period Penalty Rs.
Inadequate water or low inflow pressure
1 Water>>Engineering 240 Hours
2 Water>>Engineering No Water Supply- Eng 240 Hours
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
SABARMATI WARD -4-
As per account department(A.M.C.) circular no. 56, Dt.19/09/2016 Bank guarantee of
said work must be of Ahmedabad city branch, which mentioned as bellow.
(A) Guarantee issued by following bankswill be accepted as SD/EMD on permanentbasis.
(1) All Nationalized Banks including the Public Sector Bank-IDBI LYF.
(2) Private Sector Banks authorized by RBI to undertake State Government
Business (at present : AXIS Bank, ICICI Bank, HDFC Bank)
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period up
(1) Commercial Banks :
(1) Kotak Mahindra Bank
(2) RBL Bank (The Ratnakar Bank Ltd.)
(3) IndusInd Bank.
(4) Karur Vysya Bank.
(6) FEDERAL Bank.
(7) SOUTH INDIAN Bank.
(2) Co-Operative Banks of Gujarat
(1) The Kalupur Commercial Co-Operative Bank Ltd.
(2) Rajkot Nagarik Sahakari Bank Ltd.
(3) The Mehsana Urban Co-Operative Bank Ltd.
(4) Nutan Nagarik Sahakari Bank Ltd.
(5) Saurashtra Gramin Bank.
SABARMATI WARD -5-
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no.
4 Permanent account no. (PAN
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's
signature and stamp
SABARMATI WARD -6-
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals shall
only apply. Contractor can not stop the work due to on availably of labour force. In case progress
is delayed, contractor shall be penalized 0.1% of Tender amount per day for work done after time
limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate bills
of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved"
by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to
the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route and
not necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall
be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of work
is in the form of a designation containing the number of the specification of the material and
prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve
the contractor from the responsibility of replacing defective material brought on site or materials
used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
SABARMATI WARD -7-
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stone at site of work in a systematic manner. Materials shall be stored in such a manner
as to prevent damage, deterioration or intrusion of foreign matter and to-ensure the preservation
of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from
the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in work man like manners per the best techniques for the particular
27. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion of
29. All necessary safety measures and precaution (including those laid down in the various relevant
Indian Standards) shall be taken to ensure the safety of men, materials and machinery on the
works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar days
(120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall furnish
to the Corporation Security Deposit of 3% (Three percent) of the contract price cheque or Bank
Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
SABARMATI WARD -8-
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
(1) The work sha ll be com pleted w ithin 12 Mont h.
(2) The co ntractor shall be remain responsi bl e for Workmen’s compensat ion if any whe n
such ca se occurs. The contractor shall a rra nge formed iampasant nig ht and fencing and
pagi a nd shall be responsible for any damage o f life and l imb or pro perty if any happe n,
dur ing the execution of work. In c ase of di spute for unsee n or overlooked items the
decisio n of the city Engineer shall be final. The contractor sha ll have to give site clea n
of all r ubbish on com pletion of work and h ave over the building with final fi nishi ng of
the work as directed. All the rejected materials shall be remo ved from site within 2
hours by contra ctor at this rsk a nd co st .
(3) Fo r mixi ng morta r either for masonry or for pla ster or for any other purpose contra ctor
shall have to prepa re through of bigger size and mix t he mortar in t he re quired
proportio n. In on ca se he shal l be al lowed to mix the morta r ei ther on floor or any
finishe d surface s.
(4) The cont ractor sha ll have to make his own a rrangem ent for water required for the work
and sha ll pay the wate r charges a s per w ater m eter.
(5) If any extr a item crops up dur ing the progr ess of work the sam e shal l be ca rrie d out by
the contractor a nd he shal l be paid at the rate fixed by C.E. as per the rate analysis
based o n current ma rk et rates.
(6) If in t he interest of t he Corporation it is necessary to change either a ny site or the
design of t he propose wo rk the contr actor shall carry out the sam e at his quoted r ates
without charges any e xtra and the contract or will have to carry out the works and he
will be paid at t he ra te quoted by him and no claim for extra for subse que nt cha nges
may be enterta ine d.
(7) Retetion money at the rate of 2% shall be deducte d from every runn ing bi ll of the
contractor and wh ich will be pai d at the tim e of final bill, fo r works costing More tha n
Rs. 10-00 lak hs.
(8) The tender for the wo rk sha ll rem ain ope n for a period (120) days from the date o f
openin g of the tende rs for this work a nd that t he te nde rer sha ll not be a llowed to
withdraw on m odify t he offer on his own duri ng t he per iod. If a ny tende rer withdr aw
or m akes any m odifications (s) or addition (s) in the term s and conditions of his tende r
not acceptable to the Municipa l Corpora tio n the Munici pa l Corporation shall without
prej udice to any right or rem edy be at l iber ty to forfeit in full t he said ear nest m oney
SABARMATI WARD -9-
(9) As pe r Circular No . M CR 2176 (96) 2418 (ii) GHH dated 31-03-77 i ssued by Go vernm ent
of Guj arat contra ctors are requested to produce t hei r qua rry m at erials for co nstr uctio n
work through le gal so urces. i .e. only form the qua rry lease hold ers, permit holde r or
middle ma n who sat isfies the contractor as to the legality of the source of purchase by
him o n these mate rials.
(10) Contracto r has to make his own a rra ngement fo r proc urement of steel and cem ent.
(11) Conditional tender wil l not be accepte d.
(12) All te nder s are to be submitte d i n duplicate without which the
(13) tenders are lia ble to be rejected.
(14) Condition of form B1 Standard Specification of mat erial & code of practice will be
applic able. Form B1 & B2 can be is avail able on website.
Contr actor’s Signat ure A dd. City Engineer
SABARMATI WARD - 10 -
AHMEDABAD MUNICIPAL CORPORATION ENGINEER DEPARTMENT
TECHNICAL SPECIFICATIONS
Name of Work :-Providing & Supplying water tanker at different places in sabarmatiward,West zone,
(Annual Rate Tender)
Item No.1 :-Supplying Potable Water Tanker to be filled by supplier from his own source with 30 meter
Delivert pipe. The tanker should be supplied as & where reuired& when order placed by
charge,drivers charge etc.complete. Including pressure pump.
Mode of measurement
Measurement shall be paid by Trip. basis.
Contr actor’s Signat ure A dd. City Engineer
SABARMATI WARD - 11 -
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldhmuJtmœl - vrùbÍtul
y.Bgw.ftu. vrùbÍtul Ítulj ytuVem,
ztuo. hbKCtRvxujCJl, WMbtlvwht, ybœtJtœ.
vrùbÍtulxuLzhltuxemlk.- 03/2026-27btkytJhejuJtgujftbtuleÂJd<tu
1. Wvhtuf<xuLzhtusu<u JdobtkhSMx[uNl ^htJ<t ftuLx[tfxh©eytuyuztWljtuzfheluChJt. ÂJÂNÐ
ÂfMmtbtkstuxuLzhbtkœNtoJujntug<u bwscyLgftuLx[tfxh / buLgwVu¾ah xuLzh Che NfNu.
2. yt E-xuLzhbtk>NtoJuj «tEÍcezrmJtglt ztu¾âwbuLx zwÃjefuxftuveytumt&uCheluWvhltmhltbuÁcÁ /MvezvtuMx&e
rlg<mbgbtkbtufjJtlthnuNu.
3. Nh<e xuLzhtuhœct<j dKtNu.s
4. xuuLzhtuftuEvKfthKytÃgtrmJtgMJefthJt fu lrnkMJefthJt<ule mkÃËKom•ttBGþrlrmvjfrbNlh©elehnuNu.
5. ftuLx[tfxh©eytuyuxuLzhmt&uBGþrlrmvjhSMx[uNlle/dJobuLxhSMx[uNlleftuvebwfJtlehnuNuylufJhWvhxuLzhlkch<&t
ftuLxufxlkchMvÐjFJtu. suftuLx[tfxh©eytuyuhSMx[uNlheLgwfhtJuj l ntug<u
ftuLx[tfxh©eyuxuLzhChJtlnek.BGþrlrmvjhSMx[uNlle/dJobuLxhSMx[uNlleftuvebwfJtbtk ln´ ytJu<tuxuLzh
h>dKJtbtkytJNu.
6. xuLzh Ve vu ytuzoh / zebtLz z[tVx&eaqfJJtlehnuNu. œhufxuLzhœeXyjdxuLzhxuLzhVeChJtlehnuNu.ylu<ule vtA¤ ‘ E
’ xuLzhltuxuLzhytR.zelkchyawfjFJtltuhnuNu.
7. ftuLx[tfxhtuyuxuLzhbtcukflwltb, Ft<t lkch, btRfhlkchylumhltbwMvÐyûthtubtkjFJw.
8. ytuAehfblexuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltltxuLzhtuhœct<j (fuLmj) dKtNu.
9. suftuLx[tfxh©eytuyuhSMx[uNlheLgwfhuj l ntug<u ftuLx[tfxhuxuLzhChJtlne.
10. xuLzhmt&uBþfJtbtkytJ<e yluoMxble, xuLzh le hfblt 1% «btKucukfduhLxe / zebtLz z[tVx / vu ytuzoh /
jtufjbtRfhauf&e s MJefthJtbtkytJNu. œhufxuLzhœeXyjdR.yub.ze. ChJtlehnuNu. R.yub.ze. hfbYt.
yuffhtuzmwDeleykœtS<hfbltftbbtxuhtufzt, jtufjbtRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukfduhkxeltMJYvbtk<&t
Yt. yuffhtuz&eWvhleykœtS<hfbltftbbtxuR.yub.ze.lehfbbtºtrzbtLz z[tVx, vu ytuzoh fu
ckufduhkxeltMJYvbtkytvJtlehnuNu.cukfduhuLxeyb>tJt>NtFtlentuJesYhe Au.
11. ftuLx[tfxh©eytuyuJucmtExWvhxuLzhltuxembtk>NtoÔgtBþscòuftuEMþ^thtJ^thtfhJtbtkytJujnNu<tubtLghtFJtlthnuNu
suykduAuÕjt 72 fjtfvnujtJucmtExWvhsu<u xuLzh auf fheChJtLþkhnuNu.
SABARMATI WARD - 12 -
12. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh
auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu
mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
13. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg
<u mbglu ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule
ltuk^ >huf xuLzhhu juJe.
14. ybœtJtœ Bgw. ftu. Bttk Ítulj ytuVem/v.J.yu./«tusu¾x rJCtd ïtht htuz/rcÕzed/ce{s Ft<tytu ïtht cnth vtzJtbtk
ytJujt xuLzh sulw mcbeNl <t.01/07/2017 vAe fhJtlwk &tg Au.<uJt xuLzhtubtk <&t nJu vAe cnth vtzJtbtk
ytJlth Wvhtu¾< rJCtd/Ft<t <btb xuLzhtubtkGSTlt ltuxeVefuNl bwscGSTßgtk jtdw vzgtu ntug ðgtk,mœhnwk
ftbltBidderyuGSTltuxeVefuNl bwscle yuÃjefucejexe ægtlbtk htFelu huxlwk cezekd fhJtlwk hnuNu.
15. yuuf fh<t J^thu ftbtu mwaJJtbtk ytJu <u mkstudtubtk œhuf ftb yk<od< yjd yjd juch dukdlw ytgtusl ftuLx[tfxh
îtht fhJtlwk hnuNu.
16. ytfMbef/ <tfeœlt ftbtu btxu Ft<t îtht sKtJuj ftbtulu ftuLx[tfxh îtht 24 fjtfle ykœh atjw fhJtlt hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h,ybœtJtœ” lt ltbltu fZtJJtu.
vrµb Ítul Esluh Ft<t îtht «ftrN<
SABARMATI WARD - 13 -
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 48.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .