Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC AOC |
| Sl No | Description | Qty | Unit | ARYA CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00Road concrete | ||||
| 1.00 | OD81212/2025-2026:Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m | 125.07 | sqm | 36.75 ₹4,596.18 Lowest |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 22.5 | cum | 9,563.65 ₹2,15,182.13 Lowest |
| 1.00 | OD89188/2025-2026:Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in
position and applying a priming coat of approved steel primer using structural steel etc. as
required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (DSR 10.25.2) | 169.55 | kg | 199.45 ₹33,816.15 Lowest |
Tender Value
₹2.5 L
EMD Value
₹6,340
Closing Date
9 Sept 2025, 5:00 pmClosed
AE
LID EW Kulathupuzha GP
Annual Plan-NEDUVANNOORKADAVU PATHINANCHEKKAR - VAYARUKUNNU ROAD CONSTRUCTION-KPZA 143/2025- 26-General Civil Work
2025_LSGD_790581_7
02/2025-26/AE/LIDEW/KLPZHA/ PHASE 2
Open Tender
Civil Works - Roads
Item Rate
Kulathupuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹560
Yes
₹6,340
Yes
14 Oct 2025
25 Aug 2025
10 Sept 2025
25 Aug 2025
9 Sept 2025
25 Aug 2025
Amount
Road concrete
OD81212/2025-2026:Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
OD89188/2025-2026:Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (DSR 10.25.2)
Bidder Name
ARYA CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1303126.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .