Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.9 LAdmitted-Fee/PreQual/Technical/Finance | -51.53% | ₹17.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹21.1 L+₹3.2 L (17.8%)Admitted-Fee/PreQual/Technical/Finance | -42.90% | ₹21.1 L+₹3.2 L (17.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹21.5 L+₹3.6 L (20.1%)Admitted-Fee/PreQual/Technical/Finance | -41.80% | ₹21.5 L+₹3.6 L (20.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹22.5 L+₹4.7 L (26.0%)Admitted-Fee/PreQual/Technical/Finance | -38.91% | ₹22.5 L+₹4.7 L (26.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹23.6 L+₹5.7 L (32.0%)Admitted-Fee/PreQual/Technical/Finance | -36.00% | ₹23.6 L+₹5.7 L (32.0%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹36.9 L
EMD Value
₹73,731
Closing Date
11 Aug 2026, 6:00 pmClosed
Executive Engineer RnB Kangan
Executive Engineer RnB Kangan
Construction of road of Ari Goripora Goriwan at Ari Goripora Division Kangan
2026_PWDJK_318898_4
enit 22
Open Tender
Civil Works
Percentage
730 days
Kangan
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,100
Executive Engineer RnB Kangan
₹73,731
14 Aug 2026
1 Aug 2026
12 Aug 2026
1 Aug 2026
11 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A (Earth work) | - | - | - | - |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 627.13 | Cum | 187.3 | ₹1,17,461.45 |
| 3 | Carriage of excavated material beyond 50 meters upto 500 meters by mechnical transport including loading/ unloading complete. | 627.13 | Cum | 80.46 | ₹50,458.88 |
| 4 | Part B (B/Wall in RR Masonary ) | - | - | - | - |
| 5 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 132 | Cum | 187.3 | ₹24,723.6 |
| 6 | Providing and Laying of stone soling (Nallah) Duly hand packed including watering, dressing and ramming with all carriages, loading and unloading upto site of work complete. | 20.02 | Cum | 900 | ₹18,018 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 15.02 | Cum | 5,202.9 | ₹78,147.56 |
| 8 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Nallah Stones in Cement mortar 1:6 (1 Cement : 6 coarse sand) | 201.27 | Cum | 6,857.45 | ₹13,80,198.96 |
| 9 | Dry random rubble masonry with hard stone in foundation and plinth: Nallah Stones With bond stone. | 91.18 | Cum | 3,262.1 | ₹2,97,438.28 |
| 10 | Labour cost for Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Nallah Stones in Cement mortar 1:6 (1 Cement : 6 coarse sand) (Material available at site) | 11.5 | Cum | 4,457.45 | ₹51,260.67 |
stage.html
html • 0.04 MB
finance_1053458.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_1053458.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .