Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.4 LAccepted-AOC | 1 | Accepted-AOC L1 |
Tender Value
₹10.3 L
EMD Value
₹20,580
Closing Date
11 Jun 2021, 1:00 pmClosed
Executive Engineer
Gohana W/S Division Gohana
Laying under ground PVC pipe line of 8 inch dia from fields of Kathura Village upto Chhapra Drain
2021_HRY_174263_5
3513/15A dt. 02/06/2021
Open Tender
Civil Works
Works
30 days
Gohana
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹20,580
Yes
6 Dec 2021
4 Jun 2021
11 Jun 2021
5 Jun 2021
11 Jun 2021
5 Jun 2021
Amount
Earthwork Excavation in all kind of soil in fdn. And plinth I/C Dressing HSR item No. 4.14 and 4.17@ 93/ cum
Laying CC 1:4:8 with 40mm nominal size Brick ballast in foundation & plinth. HSR item 6.1.6 @ 2735/cum
Laying CC 1:3:6 with stone off 20mm Nominal size in foundation & plinth HSR item 6.1.4 @ 3260/cum
Laying 1st class brick necessary 1:3 in fdn & plinth HSR item 7.20.1+(7.3-7.4) @ 5086/cum
Providing 12mm thick cement plaster 1:3 in cement and mortar HSR item 11.5.2 @ 108/sqm
Excavation for pipe line running under pressure in trench and pits, in open area, where disposal of surplus is done along with and restoration of unmetatlled or unpaved surface to its original condition in ordinary soil. HSR item No. 6.16.1.3 and 4.17 @ Rs. 99/cum
providing, lowering, laying, cutting jointing with rubber rings marked with IS:5382 and testing of SPIGOT AND SOCKETTED RCC NP2 MARKED WITH IS–1988 and special into trenches for all depths including carriage, loading, unloading, stacking, handling, re-handling etc. complete in all respects to the satisfaction to the Engineer in charge. As per HSR item No 20.62.8 @ Rs. 1102/mtr
Steel reinforcement TMT bars FE-500 EQR/FE-500 D grade or more for RCC work, where not included in the complete rate of RCC including straightening bending binding, wastes, overlaps, welded joints, specor bar, chairs, stays hangers and annealed steel wire etc and placing in position complete in all respect for all heights/depth storeys/basement etc. as per HSR item No. 6.33 @ Rs. 6700/qtl
Cement concrete 1:2:4 with stone aggregate 20mm nominal size for reinforced concrete work but excluding steel reinforcement and shuttering in foundation and plinth. As per HSR item No. 6.14.2 @ Rs. 4339/cum
Rehandling of earth work HSR item No. 4.32 @52/cum
Dismantling of road including soiling and wearing coat complete in all respect. HSR item 24.37@ 1394.49/100sqm
Restoring the road cut in level with the existing road surface complete in all respect.as per HSR item No. 24.38 @ 23611.50/100sqm
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .