11 Mar 2026, 6:00 pmClosed
The Executive Engineer
Maintenance, Repair and Strengthening work of Limbdi Branch Canal from Ch.47.850 km to 65.851 km for year 2026-27
278694
46 of 2025-26
Open
Civil Works - Canal
Works
Surendranagar
6 documents required · 6 mandatory
₹4,248
Yes
Executive Engineer SBC Dn No.4/1 Limbdi
₹2.7 L
Yes
19 Feb 2026
19 Feb 2026
19 Feb 2026
11 Mar 2026
19 Feb 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer
may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered in
the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the
contract documentation shall be made before entering rates or prices against each item
in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Canal work Road and Bridge works. For building works
specifications for building are to be followed work.
9. Errors will be corrected by the Employer for any arithmetic error pursuant to Clause
29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed air
drilling for its removal, and which cannot be extracted by ripping with a tractor of at
least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
Percentage Rate Tender (Up to INR 50 Cr.)
Name of Work: - Maintenance, Repair and Strengthening work of Limbdi Branch Canal
from Ch.47.850 km to 65.851 km for the year 2026-27.
Description of Item Quantity Unit Amount in Rs.
Jungle clearance of specified category
and bushes for canal/dam work as
directed with depositing material etc
complete.(Excluding tree of grith above
0.5 mt) A) Upto2 year old
(a) For a light dence
Clearing the silt from canal/drain bed by
digging the same to required bed level
and gradient including depositing the
excavated earth regularly on spoil bank
for utilizing the same for preparing the
bund after bracking the clods as and
where directed for lead up to 30 mt and
(Excluding weed cutting)
B) Depth 3.0 to 6.0 mt
Earthwork/Backfilling with selected
earth brought from out side borrow area
or from excavated useful material incl.
watering ramming, Compaction with
pneumatic temping and all lead and lift
Dismantling the existing cement
concrete lining including removing the
debries etc. comp. as and where
A (A) 10 cm lining 21671.00 Sqmt 111.53
B (B) 7.5 cm lining 12682.00 Sqmt 83.65
Collecting, carting and stacking soft
quarry spall including filling the standard
size boxes (if necessary), shifting,
5 spreading and pneumatic temping of 509.00 Cum 1143.00
material in canal bed etc as directed
For 15 cm depth
Providing and Laying HDPE Liner of
6 750 micron in bed and slopes of canal at
required level below lining as per
drawing and as directed etc. complete..
Providing and fixing welded wiremesh
1.8 mm x 65mm x 65 mm with 30 gsm
galvanized coating confirming to IS
-2006 as per specification.
Providing and Laying in position
8 Controlled Plain/Reinforced Cement
Concrete Lining of M-15 grade in Bed,
Side Slopes and curvature including
batching, mixing, transporting, placing,
vibrating, smooth finishing, membrane
curing (by curing compound only) &
providing bitumen joints at specified
interval incl. minor filling/depression
with murrum / earth / soil as per site
condition to correct profile, watering,
compaction, trimming etc. to provide
For 7.5 cms thick cast-in-citu canal
lining in M-15 grade of conc. with
(A) Cement level-300 kg & MSA-20 mm 12682.00 Sqmt 372.43
(Without Using Paver Machinaries &
without sleepers)
For 10 cms thick cast-in-citu canal lining
in M-15 grade of conc. with Cement
(B) level-300 kg & MSA-20 mm (Without 21671.00 Sqmt 496.57
Using Paver Machinaries & without
Providing & laying in position "Nominal
Mix" cement concrete using cement sand
and crushed aggregate by mass and
machine mix for C.c work incl necessary
9 form work centaring scaffolding 15.00 Cum 4452.00
compaction by mechanical vibrator,
curing as directed with all lead & lift etc
complete. (Concrete grade 1:1.5:3 and
I/We am/are willing to carry out the work at… ....................... %above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (ForaboveINR50Cr.):
Item Description of Item(with Quantity Unit Rate Amount
No brief specification and
reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………
(C) NetTenderedAmount(A-B) (infigure) …………………………
1 The Contractor shall exhibit aboard with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer, Quality
Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is a change
as per mix design the cost of difference of cement consumption have been deducted from the
rate of original item at the rate of input rate (i.e. 5448.5 Rs / MT for OPC) mentioned in all
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
LBC SBD 47.850 to 65.851.pdf
BOQ.pdf
Tender Notice 47-65 Dt-18.02.2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .