Loading…
Loading…
Tender Value
₹7.9 L
EMD Value
₹15,705
Closing Date
15 Jun 2026, 10:00 am6d left
Executive Engineer
HP PWD Division
Cosnt of road side Shop cum ATM
2026_PWD_136044_1
4168-70
Open Tender
Civil Works - Buildings
30 days
Nabahi Sarkaghat Mandi HP
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹15,705
8 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation/cutting by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as per the direction of Engineer- in- charge. | 45.11 | Per cubic metre. | 171.4 | ₹7,731.85 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 One Cement : five coarse sand : 10 graded stone aggregate 40 mm(Forty millimetre) nominal size including carriage of materials with in all leads and lifts and direction of Engineer- in- Charge. | 8.58 | Per cubic metre. | 4,665.75 | ₹40,032.14 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 One Cement : fthree coarse sand : six graded stone aggregate 40 mm(Forty millimetre) nominal size including carriage of materials with in all leads and lifts and direction of Engineer- in- Charge. | 10.16 | Per cubic metre. | 5,424.85 | ₹55,116.48 |
| 4 | Demolishing brick work manually/ by mechanical meansincluding stacking of serviceable material and disposalof unserviceable material within 50 metres lead as perdirection of Engineer-in-charge IN cement mortar | 1.05 | Per cubic metre. | 847.95 | ₹890.35 |
| 5 | Taking out doors, windows and clerestory windowshutters (steel or wood) including stacking within 50
metres lead : IN cement mortar | 2.56 | Per square metre. | 60.8 | ₹155.65 |
| 6 | Dismantling dressed stone work ashlar face stone work,marble work or precast concrete work manually/ bymechanical means including stacking of serviceable anddisposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In cement mortar | 0.54 | Per cubic metre. | 1,011.75 | ₹546.35 |
| 7Centering ad shuttering including strutting, propping etc. and removal of form for: | |||||
| 7.01 | Foundation, Footings, bases of columns, etc. for mass concrete | 37.76 | Per square metre. | 216.45 | ₹8,173.15 |
| 7.02 | Columns, Pillars, Piers, Abutments, Posts and Struts | 37.8 | Per square metre. | 514.75 | ₹19,457.55 |
| 7.03 | Sairs(excluding landings) except spiral staircases | 8.94 | Per square metre. | 444.4 | ₹3,972.94 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
SBD.pdf
Tender Documents • 6.08 MB
BOQ_201400.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid