| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹2.4 CrAccepted-AOC AT PO KHARIAR DIST NUAPADA | KHARIAR | NUAPADA | ODISHA | ₹2.4 Cr | L2 | Accepted-AOC Awarded as per OPWD code |
| 2 | L1₹2.3 CrRejected-Finance | ₹2.3 Cr | L1 | Rejected-Finance Due to transparent Lottery |
| 3 | L2₹2.4 CrRejected-Finance AT PO TUKULA PS KHAIRIAR DIST NUAPADA PIN 766107 | TUKULA | NUAPADA | ODISHA | 766107 | ₹2.4 Cr | L2 | Rejected-Finance Due to transparent Lottery |
| 4 | L3₹2.7 CrRejected-Finance | ₹2.7 Cr | L3 | Rejected-Finance Due to transparent Lottery |
| 5 | L4₹2.8 CrRejected-Finance | ₹2.8 Cr | L4 | Rejected-Finance Due to transparent Lottery |
Updated dates
Tender Value
₹2.8 Cr
EMD Value
₹2.8 L
Closing Date
20 Jan 2026, 5:00 pmClosed
Additional Chief Engineer, P.H. Division, Balangir
Additional Chief Engineer, P.H. Division, Balangir
Construction of approach road for intake well inside Lower Suktel dam, Patnagarh
2025_PHEO_124028_1
ACEPHBGR 16/2025-26
National Competitive Bid
Civil Works - Water Works
120 days
Patnagarh NAC
Please refer DTCN
3 documents required · 3 mandatory
₹10,000
₹2.8 L
Yes
18 May 2026
31 Dec 2025
21 Jan 2026
31 Dec 2025
20 Jan 2026
31 Dec 2025
31 Dec 2025 - 12 Jan 2026
(A) Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge.
Rate for 2nd depth
Filling in foundatin and plinth with sand watered and rammed including cost of sand & labour
Cement concrete (1:3:6) with 4cm. Size crusher broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete .
Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all complete.RCC Foundation,plinth band,footing
R.C.C. Beams, Column, Grider and Bressmer, etc. in Ground Floor
R.C.C. Floor and Roof Slabs, Landings, Balconies, Projecting, Sun Shades and Chajja up to 4.3m height (Ground Floor).
R.C.C work in ground floor of M-30 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete .
Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32 mm x 32 mm x 2 mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect.
Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification.
Filling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge for 100 cum,2/3 rd. rate of earth work in excavation in ordinarry soil
Random rubble H.G. stone Masonry in cement mortar (1:4) in foundation and plinth.
Cement flush pointing to stone masonry (1 :3)
Single under reamed pile foundation with RCC M30 using 12mm size black hard granite (Crusher broken) stone chips including cost of boring but excluding cost of M.S./Tor steel and labour charges for cutting, bending and binding of steel reinforcement by welding 375 mm dia 6.00 mtr. Long single under reamed pile (three group pile @ 900mm c/c)
R.C.C work in ground floor of M-25 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete .
R.C.C work in ground floor of M-25 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete . Column & Beam 1st floor, slab
Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all complete. Pile cap, footing, plinth bend
Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all comple Column and Beam
Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all comple Roof slab, stair slab, waist slab
Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all comple Column & Beam (1st floor)
Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all comple Roof slab ,Ist floor
Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification.
Fly ash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance + 2 % in cement mortar (1:3) in superstructure.
12mm. thick cement plaster (1:4) on brick work 1st floor
Fixing Tiles in floors or steps & landing on 25mm. thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles all complete with & without cost of precast tiles.
Supplying all material , labour and T&P etc. and fixing of wall tiles in dados skirting and riser of steps on 12mm thick cement plaster 1:3(1 cement : 3 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles including transportation of all materials to site and as directed by the Engineer in charge all complete. sizes 30cm x 45cm Coloured/printed series.
Wall painting 2 coats with Weather Coat of approved shade on new work to give an even shade in Ground Floor.
Wall painting 2 coats with plastic emulsion paint (Inside 1st Floor. Plastic Emulsion paint [Berger]
Finishing plastered surfaces of walls with Berger Synthetic putty (interior wall puty) wall puty and making smooth to receive painting.
Supplying all materials labour and T&P etc. and providing, fabricating, fitting and fixing of M.S door, window, & grills of approved specification, including transportation of all marterials to site and as directed by the Engineer in charge, complete.
Priming one coat with any approved primer including cost of all labour, materials T & P with taxes, transportation etc all complete.
Enamel Painting two coats with any approved paint including cost of all labour, materials T & P with taxes, transportation etc all complete.
Supplying fitting & fixing MS Metal Rolling shutter asper IS 6248/79,Size 3.00mtr x 2.80 mtr
3% for internal electrification
S/F 2.5 sq.mm 3 Core , round Cu cable for wiring from junction box to light fitting including the labour charges towards connection make-finolex/ Polycab/ havells
S/F of 1x70W 5700K LED Flood light Energy saving, environmental friendly, long life, exclusive innovative die-cast aluminium IP65 flood light,sutable for high lighting architectural facade and general purpose lighting.(ENDURA CITYLINER NEO) including all accessories,G.I bracket and connection. as per the direction of Engineer-in-Charge.
Supply of 5Mtr high hot dip galvanised Octagonal/round poles with 130mm bottom dia sheet thickness baseplate of 200x200x16mm with FDN Bolts with inbuilt sleek junction box with one 6A SP MCB and 10sqmm stud connector of Bajaj/valmonte/JK make /Equivalent make including transportation,loading and unloading as per direction of Engineer-in-charge.
S/F of galvanised single arm decorative bracket lingth 1mtr with 70mm A/F welded with canopy.(provisional)
Supply,delivery and laying of 32mm HDPE pipe inside ground and cable inside the HDPE pipe as per construction standard specification. (provisional)
Construction of foundation with supply of all material such as steel ,reinforcement ,metal chips,cement ,sand ,cable entry,shuttering for RCC work(1:1.4:8) with labour charges for construction including erection and commissiong of pole with arm to proper alignment including fitting of the lamp.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_573899.xls
BOQ • 0.32 MB
DTCN.pdf
Tender Documents • 1.22 MB
Download all tender documents and submit your bid